Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi 2024-02-01
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML19108A2352019-04-18018 April 2019 301 Exam Report IR 05000269/20183012018-07-13013 July 2018 NRC Operator License Examination Report 05000269/2018301, 05000270/2018301, and 05000287/2018301 IR 05000269/20163022017-01-27027 January 2017 NRC Operator License Examination Report 05000269/2016302, 05000270/2016302, and 05000287/2016302 IR 05000269/20153022016-02-0202 February 2016 NRC Operator License Examination Report 05000269/2015302, 05000270/2015302, and 05000287/2015302 IR 05000269/20153012015-07-21021 July 2015 Er 05000269/2015301, 05000270/2015301, and 05000287/2015301; June 8-11, 2015 & June 17, 2015; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations IR 05000269/20143022015-02-0909 February 2015 Er 05000269/2014302, 05000270/2014302, and 05000287/2014302; December 8-11, 2014 & December 17, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML15015A6942015-01-14014 January 2015 Notification of Licensed Operator Initial Examination, 05000269/2015301, 05000270/2015301 and 05000287/2015301 IR 05000269/20133012013-08-0101 August 2013 Er 05000269-13-301; 05000270-13-301; 05000287/2013301; Operating Test June 10 - 12, 2013 & Written Exam July 11, 2013; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML12221A3912012-08-0606 August 2012 Duke Energy - Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations IR 05000269/20113022011-11-21021 November 2011 Er 05000269-11-302; 05000270-11-302; 05000287-11-302; Operating Test 10/17/2011 - 10/20/2011 & Written Exam 10/26/2011; Oconee Nuclear Station, Units 1, 2, and 3 Operator License Examinations IR 05000270/20103012010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, ML1013306092010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, IR 05000269/20083012008-04-22022 April 2008 Operator Licensing Initial Retake Examination Report 05000269-08-301, 05000270-08-301 and 05000287-08-301 on 03/20/08 for Oconee Nuclear Station - IR 05000269/20073012007-05-0101 May 2007 Operator Initial Examination - 05000269-07-301; 05000270-07-301 & 05000287-07-301 IR 05000269/20063012006-08-0202 August 2006 IR 05000269-06-301, 05000270-06-301 & 05000287-06-301; Duke Energy Corporation; 06/19-28-2006 & 06/30/2006; Oconee Nuclear Station ML0527602732005-09-21021 September 2005 Duke Power - Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations ML0220502652002-07-16016 July 2002 Response to NRC Regulatory Issue Summary 2002-09, Supplement Preparation and Scheduling of Operator Licensing Examinations 2021-07-06
[Table view] |
Text
ust 2, 2006
SUBJECT:
OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2006301, 05000270/2006301, AND 05000287/2006301
Dear Mr. Hamilton:
During the period June 19 - 28, 2006, the Nuclear Regulatory Commission (NRC) administered operating examinations to employees of your company who had applied for licenses to operate the Oconee Nuclear Power Station. At the conclusion of the examination, the examiners discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report. The written examination was administered by your staff on June 30, 2006.
Four Reactor Operator (RO) and six Senior Reactor Operator (SRO) applicants passed both the written examination and operating test. Two SRO applicants failed the written examination.
There were no post examination comments submitted. A Simulation Facility Report is included in this report as Enclosure 2.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4647.
Sincerely,
/RA/
James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosures:
(See next page)
DEC 2 Enclosures: 1. Report Details 2. Simulation Facility Report
REGION II==
Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55 Report No.: 05000269/2006301, 05000270/2006301, 05000287/2006301 Licensee: Duke Energy Corporation Facility: Oconee Nuclear Station Location: 7800 Rochester Highway Seneca, SC 29672 Dates: Operating Tests - June 19-28, 2006 Written Examination - June 30, 2006 Examiners: M. Bates, Chief, Senior Operations Examiner R. Aiello, Senior Operations Engineer S. Rose, Senior Operations Engineer Approved by: James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000269/2006301, 05000270/2006301, 05000287/2006301; 6/19-28/2006,6/30/2006; Oconee Nuclear Station; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period of June 19 - 28, 2006. Members of the Oconee Nuclear Station training staff administered the written examination on June 30, 2006. The written examinations were developed by the NRC, and the operating tests were developed by the Oconee Nuclear Station training staff.
Four Reactor Operators (RO) and six Senior Reactor Operators (SRO) passed both the operating test and written examination. Two SRO applicants failed the written examination overall, and one of these two applicants also failed the SRO portion of that examination.
Each applicant who passed the operating test and written examination with an overall score greater than 82% and SRO-only score greater than 74%, as applicable, was issued an operator license commensurate with the level of examination administered. Four SRO applicants passed the operating test, but passed the written examination with overall scores between 80% and 82%. Each of these applicants was issued a letter stating that they passed the examination and issuance of their license has been delayed pending any written examination appeals that may impact the licensing decision for their application.
There were no post examination comments.
No findings of significance were identified.
Report Details 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The NRC developed the written examinations and the licensee developed the operating tests in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. The NRC examination team reviewed the proposed examinations. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of examinations and tests.
The examiners evaluated four RO and eight SRO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of June 19-28, 2006. Members of the Oconee Nuclear Station training staff administered the written examination on June 30, 2006. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Oconee Nuclear Station, met requirements specified in 10 CFR 55, Operators Licenses.
b. Findings No findings of significance were identified.
The NRC determined that the licensees examination submittal for the operating test was within the range of acceptability expected for a proposed examination.
Four Reactor Operators (RO) and six Senior Reactor Operators (SRO) passed both the operating test and written examination. Two SRO applicants failed the written examination overall, and one of these two applicants also failed the SRO portion of that examination. Each applicant who passed the operating test and written examination with an overall score greater than 82% and SRO-only score greater than 74%, as applicable, was issued an operator license commensurate with the level of examination administered. Four SRO applicants passed the operating test, but passed the written examination with overall scores between 80% and 82%. Each of these applicants was issued a letter stating that they passed the examination and issuance of their license has been delayed pending any written examination appeals that may impact the licensing decision for their application.
The combined RO and SRO written examinations, with knowledge and abilities (K/As),
question references/answers and examination references, may be accessed in the ADAMS system (ADAMS Accession Numbers ML062010367 and ML062010364).
The examination team observed generic weaknesses during the dynamic simulator portion of the operating test. These weaknesses were related to diagnosing a sheared shaft on a high pressure injection pump and diagnosing a failed open pressurizer power operated relief valve. Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.
4OA6 Meetings Exit Meeting Summary On June 29, 2006, the examination team discussed generic issues with Mr. Dave Baxter and members of his staff. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel D. Baxter, Station Manager N. Constance, Operations Training Manager J. Collins, Operations Shift Manager J. Steely, Initial Training Supervisor R. Robinson, Operations J. Weast, Regulatory Compliance J. Smith, Regulatory Compliance C. Gray, Regulatory Compliance K. Schaaf, Training Instructor NRC personnel D. Rich, Senior Resident Inspector
SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket Nos.: 05000269/05000270/05000287 Operating Tests Administered: June 19 - 28, 2006 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration items were identified.
Enclosure 2