MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:License-Operator
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23191A8622023-07-10010 July 2023 301 Exam ADAMS 2B Administrative Items L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations ML22237A2022022-08-25025 August 2022 Notification of Licensed Operator Initial Examination 05000250/2023301, and 05000251/2023301 L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21160A2702021-06-0909 June 2021 301 ADAMS 2A-3 ML21160A2642021-06-0909 June 2021 301 ADAMS 2A-2 ML21160A2282021-06-0909 June 2021 301 ADAMS 2B ML21123A3032021-05-0303 May 2021 301 Exam Report Items - SRO as Given Written Exam ML21123A3022021-05-0303 May 2021 301 Exam Report Items - RO as Given Written Exam ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML19275G9532019-10-0202 October 2019 Exam Administrative Items (ADAMS-2D) ML19199A1702019-07-17017 July 2019 Operator Licensing Examination Approval 05000250/2019302 and 05000251/2019302 L-2019-108, NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations ML19108A2572019-04-18018 April 2019 301 ADAMS 2D Exam Admin Items - Normal Release ML19099A2912019-04-0909 April 2019 2019 Schedule Confirmation for Turkey Point ML19072A2502019-01-26026 January 2019 Tp 2019301 Post Exam Comments ADAMS-1B ML19004A3722019-01-0303 January 2019 Operating Licensing Examination Approval Letter 05000250/2019301 and 05000251/2019301 L-2018-202, NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations2018-10-30030 October 2018 NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations ML18240A4272018-08-28028 August 2018 301 Exam Draft Items 2A - Delay Release 2 Yrs ML18137A4252018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Yrs ML18137A4292018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2D) ML17349A2092017-12-15015 December 2017 251/2017-301 Post-Exam Comments ML17349A1882017-12-15015 December 2017 05000250/2017301 and 05000251/2017301 Final SRO Written Exam - Delay Release 2 Yrs ML17349A1722017-12-15015 December 2017 05000250,251/2017-301 Final RO Written Exam - Delay Release 2 Yrs ML17298B2882017-10-20020 October 2017 Operator Licensing Written Examination Approval 05000250/2017301 and 05000251/2017301 L-2017-131, Preparation and Scheduling of Operator Licensing Examinations-Updated Response2017-07-28028 July 2017 Preparation and Scheduling of Operator Licensing Examinations-Updated Response ML17191B4822017-07-10010 July 2017 Exan Final Itens 2B - Delay Release 2 Yrs ML17191B4832017-07-10010 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17065A3262017-03-0303 March 2017 Notification of Licensed Operator Initial Examination 05000250/2017301 and 05000251/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16271A0802016-09-27027 September 2016 301 Final RO Written Exam ML16271A0832016-09-27027 September 2016 301 Final SRO Written Exam ML16271A0852016-09-27027 September 2016 301 Post Exam Comments ML15119A4832015-04-29029 April 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15119A5372015-04-29029 April 2015 Initial Exam 2015-301 General Correspondence ML15119A5342015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative JPMs ML15119A5262015-04-29029 April 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15119A5192015-04-29029 April 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15119A4992015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative Documents ML15119A4972015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15119A4912015-04-29029 April 2015 Initial Exam 2015-301 Draft Sim In-Plant JPMs ML15119A4782015-04-29029 April 2015 Initial Exam 2015-301 Draft SRO Written Examination ML15119A4692015-04-29029 April 2015 Initial Exam 2015-301 Draft RO Written Exam ML15119A4672015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative Documents ML15068A0352015-03-0909 March 2015 Initial Exam 2015-301 Final SRO Written Exam ML15068A0312015-03-0909 March 2015 Initial Exam 2015-301 Final RO Written Exam L-2014-103, Preparation and Scheduling of Operator Licensing Examinations2014-05-14014 May 2014 Preparation and Scheduling of Operator Licensing Examinations ML13156A1112013-06-0505 June 2013 Initial Exam 2013-301 General Correspondence ML13156A0292013-06-0505 June 2013 Initial Exam 2013-301 Draft Administrative Documents ML13156A0322013-06-0505 June 2013 Initial Exam 2013-301 Draft SRO Written Exam 2023-07-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 9, 2019 Mano Nazar Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR TURKEY POINT 3 & 4 NUCLEAR PLANTS
Dear Mr. Nazar:
In a letter dated October 30, 2018, your staff provided an updated response to Regulatory Issue Summary 2018-02 and requested we reschedule initial operator license examinations for the Turkey Point 3 & 4 Nuclear Plants. Based on your letter, previous Regulatory Issue Summary responses, and requests received from other Region II facilities, we have scheduled the requested examinations as follows:
2020 2021 Plant / Station Week of Applicants Week of Applicants Turkey Point 3 & 4 N/A N/A 3/22 12 Scheduled dates for examinations that were requested beyond calendar year 2021 will be communicated separately.
On-site validation of the examinations is typically scheduled to occur with approximately four weeks between the validation week and the examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10), please inform us as this will impact the examination schedule.
M. Nazar 2 A supplementary letter will be sent to each stations training department director approximately 210 days prior to the initial examination. The letter will provide the director with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Gerald J. McCoy, Chief, Operations Branch I, at 404-997-4551.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 cc: Distribution via Listserv
_ML 19099A291_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DXB2 GJM1 NAME DBACON GMCCOY DATE 4/ 8 /2019 4/ 9 /2019 E-MAIL COPY? YES NO YES NO