LR-N18-0113, Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification

From kanterella
(Redirected from ML18302A113)
Jump to navigation Jump to search

Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification
ML18302A113
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/27/2018
From: Mcfeaters C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR S17-06, LR-N18-0113
Download: ML18302A113 (7)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0PSEG OC'f,27 2018 NuclearLLC 10 CFR 50.90 LR-N18-0113 LAR S17-06 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311

Subject:

Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification References 1. PSEG letter to NRC, "License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification," dated June 29, 2018 (ADAMS Accession No. ML18180A291)

In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request for Salem Nuclear Generating Station (Salem), Units 1 and 2. The proposed amendment will revise Salem Unit 1 and Unit 2 Technical Specification (TS) 3/4.3.1, "Reactor Trip System Instrumentation," 3/4.3.2, "Engineered Safety Feature Actuation System Instrumentation,"

3/4.7.1.5, "Main Steam Line Isolation Valves," and add a new TS for main feedwater isolation to better align the TS with the design basis analyses and the design of the instrumentation.

Subsequent to this submittal, PSEG identified that the TS mark-up page provided for Unit 1 TS page 3/4 3-21, Unit 1 TS page 3/4 3-34, Unit 2 TS page 3/4 3-22 and TS page 3/4 3-37 did not align with the proposed change described in Section 2.4 of Enclosure 1 of Reference 1. provides the corrected TS mark-up pages.

PSEG has determined that the information provided in this submittal does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determination previously submitted. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated State of New Jersey Official.

LR-N18-0113 10 CFR 50.90 Page 2 There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Mr. Brian Thomas at 856-339-2022.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on _ __;_/_0_1_7_7_11_£ (Date)

Respectfully, Charles V. McFeaters Site Vice President Salem Generating Station Corrected Technical Specification Mark-up Pages cc: Administrator, Region I, NRC NRC Project Manager, Salem NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Chief, NJBNE PSEG Corporate Commitment Tracking Coordinator Salem Commitment Tracking Coordinator

LR-N18-0113 LAR 817-06 Attachment 1 Corrected Technical Specification Mark-up Pages

Except when all main feedwater lines are isolated by (1) a closed and de-activated feedwater isolation valve, or (2) closed and de-activated feedwater regulating valve (FRV) and FRV bypass valves, or (3) a closed manual valve.

TABLE NOTATION

  1. Trip function may be bypassed in this MODE below P-11.
    1. Trip function may be bypassed in this MODE below P-12.

Applies to Functional Unit 8 items c and d.

Tae ;.ytgm.atig ;;.stuatign lggis inslYaes tWQ reoonaant SQleng;ig 9peratea vent val*.*es :fgr easa Main Steam Isglatign valve One vent *,calve gn any Qne Main Steam Isglatign valve may lae isglatea *,dtamat a.:f:festing tae :fynstign g:f tae autgm.atie aetyatign lggis prgv:iaea tae remaining seuen sgl.eaeia "eat valves remain OPERl.E, Tae isglatea MSIY vent valve saall lae retyrnea tg OPERAill.E statys UJ?en tae :first entry inte MODE s :fellewing aeterm.inatien taat tae vent valve is ingper;;.lale, FQr a* senaitien *,.mere mere taan ene ef tae eigat seleneia vent *,calves are ineper;;.Jale, entry inte ACTIOM ::!Q is reirea, ACTION STATEMENTS ACTION 13 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.1 provided the other channel is OPERABLE.

ACTION 14 - With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL FUNCTIONAL TEST, provided the inoperable channel is placed in the tripped condition within l hour.

ACTION 15 - NOT USED ACTION 16 - With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is demonstrated by CHANNEL CHECK within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; one additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1. 1.

ACTION 17 - With less than the Minimum Channels OPERABLE, operations may continue provided the containment purge and exhaust valves are maintained closed.

ACTION 18 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status.within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least OT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The automatic actuation logic includes two redundant solenoid operated vent valves for each Main Steam Isolation Valve (MSIV}. Vent valves associated with an inoperable MSIV may be isolated provided that the MSIV is closed in accordance with actions ofTS 3.7.1.5. One vent valve on any one of the remaining OPERABLE or open MSIVs may be isolated without affecting the function of the automatic actuation logic provided the remaining solenoid vent valves remain OPERABLE. The isolated MSIV vent valve shall be returned to OPERABLE status upon the first entry into MODE 5 following determination that the vent valve is inoperable. For any condition where more than one solenoid vent valve is inoperable for the OPERABLE or open MSIVs, entry into ACTION 20 is required.

.SALEM - UNIT 1 3/4 3-21 Amendment No. 276

TABLE 4.3-2 (Continued)

TABLE NOTATION Outputs are up to, but not including, the output relays.

The provisions of Specification 4.0.4 are not applicable.

(1) Each logic channel shall be tested in accordance with the Surveillance Frequency Control Program. The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.

(2) Each train or logic channel shall be tested in accordance with the Surveillance


-- -- - ErquQcy_<;on!t9l£J()g!Cl_f'l1_. _ _ __ _ _ _ _ --- - --- _ --- - -- - -- -- - - -

(3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.

(4) NOT USED (5) NOT USED (6) Inputs from Undervoltage, Vital Bus, shall be tested in accordance with the Surveillance Frequency Control Program. Inputs from Solid State Protection System shall be tested in accordance with the Surveillance Frequency Control Program.

(7) Frequencies are specified in the Surveillance Frequency Control Program unless otherwise noted in the table.

(a) Except when all MSIVs are closed.

(b) Except when all main feedwater lines are isolated by (1) a closed and de-activated feedwater isolation valve, or (2) closed and de-activated feedwater regulating valve (FRV) and FRV bypass valves, or (3) a closed manual valve.

SALEM - UNIT 1 3/4 3-34 Amendment No. 299

Vent valves associated with an inoperable MSIV TABLE 3.3-3 (Continued) may be isolated provided (MSIV) that the MSIV is closed in TABLE NO'l'ATION accordance with actions Trip function may be of TS 3.7.1.5.

Trip function may be Applies to Functional Unit 8 items c

      • The automatic actuation logic includes
  • valves for each Main Steam Isolation Valv . One vent valve on any one Steam IselatiDf'l Valve may be .isolated without affecting the function automatic actuation logic provided the remaining 5eYeft solenoid vent v lves

_remain OPERABLF.. The isolated MSIV vent valve shall be returned to OPE BLE

ig ()pEf<ABlE status upon the first entry into MODE 5 following determination that th vent r ; *;:::::;:=:::::

valve is :inoperable. For any condition where more than one A

h T:::: :: to c_roN_Zo ACTION 13 - With the numbe qf OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours; however, one channel may be bypassed for up to _4 hours for surveil.lance teting per Specification 4 ..2.1.1 provided the other channel is OPERABLE.

ACTION 14 - With the number of OPERABLE Channels one less than the Total Number o f Channels, operation may proceed until performance o f the next required CHANNEL FUNCTIONAL TEST, provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 15 - NOT USED ACTIO 16 - With the number of OPERABLE Channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel i s placed in the bypassed condition and the Minimum Channels O?ERABLE requirement is demonstrated by CHANNEL CHECK within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; one additional channel may be bypassed for up to 4 hours for surveillance testing per Spe'cification 4. 3. 2 .1.1.

ACTION 17- With less than the Minimum Channels OPERABLE, operation may continue provided the containment purge and exhaust valves are maintained closed.

ACTION 18 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hou;rs or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Except when all main feedwater lines are isolated by (1) a closed and de-activated feedwater isolation valve, or (2) closed and de-activated feedwater regulating valve (FRV) and FRV bypass valves, or (3) a closed manual valve.

SALEM - UNIT 2 3/4 3-22 Amendment No. 258

TABLE 4.3-2 (Continued)

TABLE NOTATION Outputs are up to, but not including, the Output Relays.

The provisions of Specification of 4.0.4 are not applicable.

(1) Each logic channel shall be tested in accordance with the Surveillance Frequency Control Program. The CHANNEL FUNCTION TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.

- - - - (2)

I

--- - Each train or logic channel- shall be tested in accordance with the Surveillance Frec!uencicaritroiProg ram.

(3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.

(4) If not performed in the previous 92 days.

(5) - NOT USED (6) Inputs from undervoltage, Vital Bus, shall be tested in accordance with the Surveillance Frequency Control Program. Inputs from Solid State Protection System, shall be tested in accordance with the Surveillance Frequency Control Program.

(7) Frequencies are specified in the Surveillance Frequency Control Program unless otherwise noted in the table.

(a) Except when all MSIVs are closed.

(b) Except when all main feedwater lines are isolated by (1) a closed and de-activated feedwater isolation valve, or (2) closed and de-activated feedwater regulating valve (FRV) and FRV bypass valves, or (3) a closed manual valve.

SALEM- UNIT 2 3/4 3-37 Amendment No. 282