IR 05000331/2018005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005)
ML18240A309
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/28/2018
From: Karla Stoedter
NRC/RGN-III
To: Dean Curtland
NextEra Energy Duane Arnold
References
IR 2018005
Download: ML18240A309 (6)


Text

ust 28, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005)

Dear Mr. Curtland:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to the baseline inspection, an inspection of TI-193, Reliable Hardened Containment Vents, is planned for the week of July 26, 2019. In addition, we plan to perform Inspection Procedure 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants, the week of February 3, 2020. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9731 with any questions you have regarding this letter.

Sincerely,

/RA/

Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure:

Inspection Plan cc: Distribution via LISTSERV