Pages that link to "PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures"
Jump to navigation
Jump to search
The following pages link to PNO-II-85-086, on 850826,Natl Weather Svc Upgraded Tropical Storm Elena to Hurricane.Utils Contacted Re Implementation of Hurricane Procedures:
Displayed 50 items.
- PNO-II-85-114, on 851203,during Operation at 93% Power, Power Loss to Two of Four Reactor Coolant Pumps Occurred Causing Reactor Trip.Caused by Short Circuited Lead from Potential Transformer.Main Feedwater Pumps Secured (← links)
- PNO-II-85-087, on 850818 & 21,1-1/2 Inch Steam Chest Drain Line Ruptured During Startup Operations After Refueling & Maint Outage.On 850905,main High Pressure Turbine Developed Steam Leak in Steam Chest (← links)
- ML20137M189 (redirect page) (← links)
- PNO-II-85-086 (redirect page) (← links)
- PNO-II-86-001, on 860101,reactor Tripped from High Flux to Flow Resulting in Actuation of Emergency Feedwater Initiation.Caused by Sheared Shaft on One of Four Reactor Coolant Pumps.Feedwater Flow Secured (← links)
- PNO-II-85-108, on 851107,emergency Diesel Generator Overspeed Occurred.Util & Tdi Disassembling & Inspecting for Damage. Cause Under Review.Link Pin Bushing & Main Bearing Cracked (← links)
- PNO-II-85-106, on 851105,design Engineer Fell Approx 40 Ft Inside Cooling Tower.Victim Transferred to Hosp (← links)
- PNO-II-85-082, Westinghouse Turbine Reults Indicate Resonance Vibration in High Pressure End of Turbine.Caused by Mod to Governor Valves.Governor Valves Will Be Replaced (← links)
- PNO-II-97-007, on 970130,kV step-up Transformer Caught Fire & Exploded at Crystal River.Explosion Lifted Transformer Off of Base & Toppled on Side.Offsite Help Requested & Received by Derosa Volunteer Fire Dept (← links)
- ML20134A975 (← links)
- PNO-II-85-102, crack-like Indications Discovered on Surface of Cross Assembly Which Ties 24-inch Discharge Piping of Recirculation Pump to Jet Pump 16-inch Ring Supply Header. Util & Nutech Performing Evaluation (← links)
- PNO-II-85-064, on 850701,demonstrators Protested Impact of Plant Const Cost on Util Rates.Security at All Site Entrances Increased.Traffic in & Out of Plant & Plant Operation Unaffected (← links)
- PNO-II-85-062, on 850618,licensee Investigated Alleged Offsite Drug Use by Nonsupervisory Members of Contract Guard Force.Urinalysis Tests on 15 Samples Showed Negative Results in All But Three Samples.Investigation Continuing (← links)
- PNO-II-80-044, on 800319,site Ambulance,En Route to Hosp W/Laborer,Heart Attack Victim,Involved in Accident.Three of Four Occupants Killed.Status of Laborer Unknown (← links)
- PNO-II-80-036, on 800306,NRC Immediate Action Ltr to Util Confirmed That Facility Will Not Return to Power W/O Prior NRC Concurrence Based on Licensee Responses to NRC Verbal Requests & Technical Discussions Re Corrective Actions (← links)
- PNO-II-80-035, on 800229,group of Antinuclear Demonstrators Assembled for 2-h at Util Winter Park District Ofc.No Demonstration Expected at Plant.Extra Security Guard Will Be Posted at Entrance to Site Access Road for Weekend (← links)
- PNO-II-80-037, investigation of 800226 Transient Revealed Power Failure Caused by Mismated Set of Connector Pins on Printed Circuit Board Between Electrical Cabinet & Solid State Subsys in Control & Indicator Circuits (← links)
- PNO-II-86-015, on 860212,unusual Event Declared After RCS Leakage Increased to 5.9 Gpm.Reactor Tripped from 11% Power on Low Reactor Water Level Following Opening of Condensate Booster Pump Recirculation Valve (← links)
- ML20151X916 (← links)
- ML20151X472 (← links)
- ML20151V198 (← links)
- ML20151U633 (← links)
- PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley (← links)
- PNO-II-97-039, on 970718,response Was Made to Hurricane Danny.Region II State Liason Officer Has Been in Contact W/Fema & State of Al.Plant Staff Taking Precautionary Measures in Preparation for High Wind Conditions (← links)
- PNO-II-88-069, on 881129,spurious Actuation of 19 Out of 30 Alert & Notification Sirens Occurred.Preliminary Info Indicated That Spurious False Activation Caused by Old Activation Sys Decommissioned Later on Same Day (← links)
- PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities (← links)
- PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 (← links)
- PNO-II-97-059, on 971118,established Vacuum in Main Condenser & Steam Bubble in Pressurizer.Completed Work on Planned Upgrades for B Edg.Resident & regional-based Inspectors Are Closely Monitoring Subject Activities (← links)
- PNO-IV-99-005, on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed (← links)
- PNO-II-98-003, on 980120,licensee Placed Two Reactor Coolant Pumps in Operation to Add Heat to Rcs.Licensee Has Not Yet Requested Release from Cal.Licensee Issued Press Release (← links)
- PNO-II-84-061, on 840916,plant,Unit 1 Shut Down Due to Steam Leak Inside Turbine Bldg.Region II Dispatched Insp & Failed Assembly Being Sent off-site for Independent Verification (← links)
- PNO-II-89-078, on 891205,male Individual Called Dept of Corrections,State of Alabama & Requested to Talk to Dept Commissioner.Commissioner Not in & Individual Left Name, Phone Number & Message Threatening to Blow Up Farley NPP (← links)
- PNO-II-89-035, on 890511,B Recirc Pump Experienced High Vibrations.Control Rods Were Inserted to Reduce Power & Recirc Pumps Were Shifted to Slow Speed (← links)
- PNO-II-86-006, on 860110 Two Divers Drowned During Attempt to Clean Intake Structure Area.Probably Caused by Divers Sucked Into Operating Svc Water Intake Pump Pit a (← links)
- PNO-II-80-157, insp Indicated Questionable Fire Damper Installation Integrity in HVAC Sys for Control Room & Other safety-related Areas.Welding Instructions Inadequate.Item Generic.Stop Work Order Issued (← links)
- PNO-II-97-063, on 971218,Crystal River Unit 3 Achieved Significant Milestone by Declaring a EDG Operable & Thus Making Both EDGs Operable for Mode 5.Licensee Does Not Plan to Issue Press Release.State of Fl Notified (← links)
- PNO-II-93-004, on 930130,facility Began Reactor Shutdown to Replace Leaking Pressurizer Code Safety Valve 2B. Leak Reached Max Rate of 20-28 Gpm Prior to Shutdown.Facility in Cold Shutdown on 930131.State of AL Informed (← links)
- PNO-II-93-075, on 931221,Unit 2 Shutdown Due to Turbine Virbrations.Unit 2 Planned to Be Shutdown for Approx Six Days to Implement Repairs on Secondary Side (← links)
- PNO-II-92-019, on 920327,plant Automatically Tripped Due to Partial Loss of Offsite Power.Licensee Plans to Keep Unit Shutdown for 2-3 Days to Repair Faulty Rod Position Indication.State of Fl Was Not Notified (← links)
- PNO-II-91-014, on 910329,as Result of Severe Weather & Heavy Rains,Bridge Located on Highway 61 Approx 7-8 Miles North of Grand Gulf Was Washed Out.State of Mississippi Have Been Notified (← links)
- PNO-II-86-027, on 860407,reactor Manually Scrammed After Safety Relief Valves Opened & Could Not Be Closed within 2 Minutes,Per Tech Specs.Valves Closed After Scram.Util Will Keep Unit Shut Down to Repair Recirculation Pump Seals (← links)
- PNO-II-86-060, on 860828,unscheduled Shutdown Which Began on 860825 to Correct Inadequate Cooling Water Flow to Several Room Coolers,Exceeded 48 H.Condition Found When Tests Performed After Review of Standby Svc Water Sys Mod (← links)
- PNO-II-86-089, on 861121 & 22,plant Taken Out of Svc to Replace Letdown Sys Trains.On 861121,cooler a Determined to Be Leaking When Radiation Monitor Alarmed When Preparing for Startup.On 861122,RCS Leak Rate Exceeded Tech Spec Limits (← links)
- PNO-III-86-085, on 861105,Pacific Scientific,Inc Informed Util That One of 68 Mechanical Snubbers Found Radioactively Contaminated W/Levels as High as 30 M/H.Util Suspended Unconditional Release of Matl (← links)
- PNO-II-87-080, on 871209,plant Unit 2 Manually Shut Down from 33% Power to Repair Leak Believed to Be in 6 Inch Pipe to Elbow Weld.Plant Being Placed in Cold Shutdown for Repair. Licensee Anticipates 5 to 10 Day Outage (← links)
- PNO-II-89-042, on 890602,util Notified That Decision Made to Cancel Unit 2.Util Will Not Request Cancellation of CP Until Approval Received from PSC of Arkansas,Mississippi,Louisiana & City of New Orleans (← links)
- PNO-II-89-030, on 890405,diver from Nuclear Util Const Co Caused Alarm of Portal Monitor When Entering Site.Caused by Clothing Being Contaminated from Working at Plant in Spain. Individual Showed No Internal Activity (← links)
- ML20249B565 (← links)
- ML20249B496 (← links)
- ML20249B322 (← links)