PNO-76-076:indication of Separation or Voids in Concrete Dome of Reactor Bldg Were Noted During Preparation for Containment Structural Integrity Test.Inspectors Were Sent to Site to Visually Examine Problem
ML20249B322
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/20/1976
From: Gower G, Roy G, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-076, PNO-76-76, NUDOCS 9806220316
Download: ML20249B322 (1)


Text

$

h f91AA- &

fW ~C AWh y

we PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE April 20, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE --PN0 76 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance.

The informcrion presented is as initially received without verification or evaluation and is basically all that is known by OIE staff as of 4;00 p.m. on_

date of this notification.

IT SHOULD BE SPECIFICALLY NOTED THAT THIS_

IO NOTIFICATION MAY CONTAIN INF0_RMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUS SHEET) SUBSEQUENTLY WILL BE ISSUED IF WARRANTED.

Facility: Florida Power Corporation Crystal River 3 (DN-50-302)

Subject:

ABNORMALITIES IN THE CONTAINMENT DOME CONCRETE Indications of separation or voids in the concrete dome of the reactor building were noted during preparation for the containment structural integrity test, when an anchor bolt failed to hold.

Sonic sounding indicates a significant area of the dome is involved.

The affected area is believed to extend to at least five inches below the surface and into the rebar area.

The dome problem may impact on the July 31, 1976, fuel 1cading date.

Licensee plans have not been finalized for investigation of the concrete problem. Two inspectors were sent to the site on 4/19/76 to visually examine the problem and obtain preliminary information.

0 6

Media interest is expected, due to the probable impact on the completion date of construction. NRC is considering issuance of a press release.

.OIE received notification of this event from the Plant Superintendent on g

April 17, 1976.

j

Contact:

GCGower, IE x27261 GWRoy, IE x 27261 DThompson, IE x27541 Distribution:

Acting Chairman Rowden Commissioner Mason S. J. Chilk, SECY,

Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy i

L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA K. R. Chapman, NMSS H. K. Shapar, ELD t

MNBBN d; Luge Transmitted: P Bldg /

H St Y PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE

,4 9906220316 760420 PDR IEE PNG-76-076 PDR L