Pages that link to "05000254/LER-1983-001, Forwards LER 83-001/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000254/LER-1983-001, Forwards LER 83-001/03L-0:
Displayed 24 items.
- 05000265/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- ML20064L107 (redirect page) (← links)
- 05000254/LER-1983-001 (redirect page) (← links)
- 05000254/LER-2012-003 (← links)
- 05000254/LER-2014-001 (← links)
- 05000254/LER-2014-002 (← links)
- 05000254/LER-2014-003 (← links)
- 05000254/LER-2014-004 (← links)
- 05000254/LER-2014-005 (← links)
- 05000254/LER-2015-001 (← links)
- 05000254/LER-2015-002 (← links)
- 05000254/LER-2015-003 (← links)
- 05000254/LER-2015-004 (← links)
- 05000254/LER-2015-005 (← links)
- 05000254/LER-2015-006 (← links)
- 05000254/LER-2015-008 (← links)
- 05000254/LER-2012-001 (← links)
- 05000254/LER-2012-002 (← links)
- 05000254/LER-2012-004 (← links)
- 05000254/LER-2013-001 (← links)
- 05000254/LER-2013-002 (← links)
- 05000254/LER-2013-003 (← links)
- 05000254/LER-2016-002 (← links)
- 05000254/LER-2016-001 (← links)
- 05000254/LER-2015-010 (← links)
- 05000254/LER-2015-009 (← links)
- 05000254/LER-2015-007 (← links)
- 05000254/LER-2011-003 (← links)
- 05000254/LER-2011-002 (← links)
- 05000254/LER-2011-001 (← links)
- 05000254/LER-2010-002 (← links)
- 05000254/LER-2010-001 (← links)
- 05000254/LER-2009-004 (← links)
- 05000254/LER-2009-003 (← links)
- 05000254/LER-2009-002 (← links)
- 05000254/LER-2009-001 (← links)
- 05000254/LER-2008-001 (← links)
- 05000254/LER-2007-003 (← links)
- 05000254/LER-2007-002 (← links)
- 05000254/LER-2007-001 (← links)
- 05000254/LER-2006-004 (← links)
- 05000254/LER-2006-003 (← links)
- 05000254/LER-2006-002 (← links)
- 05000254/LER-2006-001 (← links)
- 05000254/LER-2005-003 (← links)
- 05000254/LER-2005-002 (← links)
- 05000254/LER-2005-001 (← links)
- 05000254/LER-2004-003 (← links)
- 05000254/LER-2004-002 (← links)
- 05000254/LER-2004-001 (← links)
- 05000254/LER-2003-002 (← links)
- 05000254/LER-2003-001 (← links)
- 05000254/LER-2002-002 (← links)
- 05000254/LER-2002-001 (← links)
- 05000254/LER-2017-004 (← links)
- 05000254/LER-2017-003 (← links)
- 05000254/LER-2017-002 (← links)
- 05000254/LER-2017-001 (← links)
- 05000254/LER-1993-013 (← links)
- 05000254/LER-1993-012 (← links)
- 05000254/LER-1993-010 (← links)
- 05000254/LER-1993-011 (← links)
- 05000254/LER-1993-008 (← links)
- 05000254/LER-1993-009 (← links)
- 05000254/LER-1990-013 (← links)
- 05000254/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000254/LER-1982-016, Forwards LER 82-016/03L-0 (← links)
- 05000254/LER-1982-010, Forwards LER 82-010/03L-0 (← links)
- 05000254/LER-1982-009, Forwards LER 82-009/03L-0 (← links)
- 05000254/LER-1994-005, Forwards LER 94-005-00.Suppl Rept Will Be Issued,Documenting Valves & Penetrations That Had Excessive Leakage,What Caused Leakage & Corrective Actions (← links)
- 05000254/LER-1982-028, Forwards LER 82-028/03L-0 (← links)
- 05000254/LER-1982-024, Forwards LER 82-024/03L-0 (← links)
- 05000254/LER-1982-023, Forwards LER 82-023/03L-0 (← links)
- 05000254/LER-1983-001, Forwards LER 83-001/03L-0 (← links)
- 05000254/LER-1994-003, Forwards LER 94-003,Rev 0 Re Not Establishing Continuous Firewatch Following Impairment of Safe Shutdown Path. Commitments Listed (← links)
- 05000254/LER-1982-025, Forwards LER 82-025/03L-0 (← links)
- 05000254/LER-1982-032, Forwards LER 82-032/03L-0 (← links)
- 05000254/LER-1982-027, Forwards LER 82-027/03L-0 (← links)
- 05000254/LER-1982-029, Forwards LER 82-029/01T-0 (← links)
- 05000254/LER-1982-031, Forwards LER 82-031/03L-0 (← links)
- 05000254/LER-1982-030, Forwards LER 82-030/03L-0 (← links)
- 05000254/LER-1982-021, Forwards LER 82-021/03L-0 (← links)
- 05000254/LER-1982-012, Forwards LER 82-012/01T-0 (← links)
- 05000254/LER-1982-018, Forwards LER 82-018/03L-0 (← links)
- 05000254/LER-1982-019, Forwards LER 82-019/03L-0 (← links)
- 05000254/LER-1982-013, Forwards LER 82-013/03L-0 (← links)
- 05000254/LER-1982-014, Forwards LER 82-014/03L-0 (← links)
- 05000254/LER-1982-015, Forwards LER 82-015/03L-0 (← links)
- 05000254/LER-1978-027, Forwards LER 78-027/03L-0 (← links)
- 05000254/LER-1983-006, Forwards LER 83-006/03L-0 (← links)
- 05000254/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000254/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000254/LER-1983-003, Forwards LER 83-003/03L-0 (← links)
- 05000254/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- 05000254/LER-1983-015, Forwards LER 83-015/03L-0 (← links)
- 05000254/LER-1983-014, Forwards LER 83-014/03L-0 (← links)
- 05000254/LER-1983-013, Forwards LER 83-013/03L-0 (← links)
- 05000254/LER-1982-022, Supplemental LER 82-022/03L-1:on 820816,maint Outage for 1/2B Diesel Fire Pump Exceeded 7-day Limit.Cause Not Stated. Diesel Pump Wear Rings Replaced (← links)
- 05000254/LER-1982-020, Forwards LER 82-020/03L-0 (← links)
- 05000254/LER-1983-011, Forwards LER 83-011/03L-0 (← links)
- 05000254/LER-1983-007, Forwards LER 83-007/03L-0 (← links)
- 05000254/LER-1982-035, Forwards LER 82-035/03L-0 (← links)
- 05000254/LER-1982-034, Forwards LER 82-034/03L-0 (← links)
- 05000254/LER-1976-002, Updated LER 76-002/03L Re Excessive Leakage from Double Gasketed Seal X-4.Initially Reported on 760202.Caused by Equipment Failure & Insufficient Compression.Hatch Bolts Tightened (← links)
- 05000254/LER-1982-039, Forwards LER 82-039/03L-0 (← links)
- 05000254/LER-1995-004, Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories (← links)
- 05000254/LER-1994-016, Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed (← links)
- 05000254/LER-1994-015, Forwards LER 94-015-00:on 941002,single Loop Operation in Unanalyzed Condition Occurred (← links)
- 05000254/LER-1983-019, Forwards LER 83-019/03L-0 (← links)
- 05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure (← links)
- 05000254/LER-1994-004, Submits Reproduction of Original Text of LER 94-004 & Suppl Info (← links)
- 05000254/LER-1995-001, Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 0 (← links)
- 05000254/LER-1984-018, :on 840922 & 24,reactor Bldg Fuel Pool Channel B Area Radiation Monitor 1705-16B Spiked High, Tripping Ventilation.Cause Unknown.Corrective Actions for Both Events Will Be Documented in Suppl to LER 84-018 (← links)
- 05000254/LER-1996-013, Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1996-012, Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 970301 (← links)
- 05000254/LER-1996-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated (← links)
- 05000254/LER-1996-015, Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 961231 (← links)
- 05000254/LER-1996-008, Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels (← links)
- 05000254/LER-1991-003, Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F41 (← links)
- 05000254/LER-1983-012, Forwards LER 83-012/01T-0 (← links)
- 05000254/LER-1983-010, Forwards LER 83-010/03L-0 (← links)
- 05000254/LER-1982-026, Forwards Revised LER 82-026/03L-2 (← links)
- 05000254/LER-1983-008, Forwards LER 83-008/03L-0 (← links)
- 05000254/LER-1996-022, Submits Corrective Action Plan for LER 96-022-00 Re Inoperable Control Room Emergency Ventilation Sys (← links)
- 05000254/LER-1997-009, Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr (← links)
- 05000254/LER-1997-014, Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr (← links)
- 05000254/LER-1997-020, Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-013, Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-011, Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-010, Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted (← links)
- 05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments (← links)
- 05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2 (← links)
- 05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1997-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes (← links)
- 05000254/LER-1997-006, Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER (← links)
- 05000254/LER-1996-021, Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made (← links)
- 05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values (← links)
- 05000254/LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated (← links)
- 05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed (← links)
- 05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items (← links)
- 05000254/LER-1996-019, Forwards LER 96-019 IAW Requirements of 10CFR50.73(a)(2)(ii)(B) & Discusses Listed Commitments (← links)
- 05000254/LER-1996-018, Forwards Supplemental Info Re LER 96-018-00,correcting Editorial Error (← links)
- 05000254/LER-1996-020, Forwards LER 96-020-00.Commitments Included in LER & Submitted (← links)
- 05000254/LER-1998-019, Forwards LER 98-019-00,IAW 10CFR50.73(a)(2)(v)(B).Any Other Actions Described in Submittal Represent Intended or Planned Actions by Util.No Commitments Made (← links)
- 05000254/LER-1998-021, Forwards LER 98-021-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made by Util Are Listed (← links)
- 05000254/LER-1998-020, Forwards LER 98-020-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Listed (← links)
- 05000254/LER-1988-001, Sanitized Version of LER 88-001-00:on 880114,records Review Found Two Apparent Overexposures of Contractor Personnel During Fourth Quarter 1980.Caused by Inaccurate Secondary &/ or Primary Dosimetry.Dosimetry Sys Upgraded (← links)
- 05000254/LER-1998-024, Forwards LER 98-024-00 Per 10CFR50.73(a)(2)(i)(B).List of Commitments Made by Util,Provided (← links)
- 05000254/LER-1998-023, Forwards LER 98-023-00 Per 10CFR50.73(a)(2)(v)(D).List of Licensee Commitments,Provided (← links)
- 05000254/LER-1998-022, Forwards LER 98-022-00 for Quad Cities Nuclear Power Station,Unit 1,per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-003, Forwards LER 98-003-00,which Describes Condition Prohibited by Plant Ts.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-026, Forwards LER 97-026-01,re Event That Took Place at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr, Listed (← links)
- 05000254/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B),stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Ts.Commitment Made by Ltr Provided (← links)
- 05000254/LER-1997-022, Forwards LER 97-022-00,per 10CFR50.73(a)(2)(v)(D).Commitment Stating That Qcos 5750-04 Will Be Enhanced by Adding Precautions for Opening of Bypass Valve & Verification That Relief Valve Has Not Lifted & Failed to Reseat,Listed (← links)
- 05000254/LER-1994-002, Forwards LER 94-002-01 Re B CR HVAC Inoperable,Due to Failure of Compressor Motor Contactor.Listed Commitments Made by Ltr (← links)
- 05000254/LER-1997-027, Forwards LER 97-027-00,per 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-029, Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr Listed (← links)
- 05000254/LER-1997-012, Forwards LER 97-012-01,re Issue That It Is Physically Possible for Units 1 & 2 Refuel Bridge Monorail Auxiliary Hoists to Perform Core Alterations.Commitments Made in Rept, Listed (← links)
- 05000254/LER-1997-024, Forwards LER 97-024-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-025, Forwards LER 97-025-00 Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Listed (← links)
- 05000254/LER-1998-007, Forwards LER 98-007-00,re Condition That Was Outside Design Basis of Plant,Per 10CFR50.73(a)(2)(ii)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-004, Forwards LER 98-004-00 for Quad Cities Nuclear Power Station.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-023, Forwards LER 97-023-00,which Documents Event That Occurred at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1998-025, Forwards LER 98-025-00,IAW 10CFR50.73(a)(2)(v)(D). Commitments Made by Util,Listed (← links)
- 05000254/LER-1999-001, Forwards LER 99-001-00 for Quad Cities Nuclear Power Station.Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tech Specs.Util Committing to Listed Actions (← links)
- 05000254/LER-1998-011, Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-006, Forwards LER 98-006-01,re RB Post LOCA Temps.Actions Listed Are Required for Closure of Issue But Are Not Required Prior to Startup (← links)
- 05000254/LER-1998-012, Forwards LER 98-012-01,which Describes Unit 1 Reactor Bottom Head Drain Line Developed Leak.No New Commitments Made within Submittal (← links)
- 05000254/LER-1987-025, Forwards Addl Info Re Control Room Habitability to Support Narrative Contained in LER 87-025 (Rev 1),including Control Room Habitability Study,Updated FSAR (Rev 88),inplace Charcoal Absorber Leak Rate Testing & Calculations (← links)
- 05000254/LER-1997-015, Informs NRC of Change of Committed Due Date Contained in LER 97-015,dtd 970812.Station Changing Due Date of Commitment to 990528 (← links)
- 05000254/LER-1998-015, Forwards LER 98-015-00 Re CREVS Declared Inoperable.Listed Commitments Being Made by Ltr (← links)
- 05000254/LER-1989-009, Effluent & Waste Disposal Semiannual Rept,Jan-June 1989.Unit 1 Svc Water Gross Activity Monitor Out of Svc for Total of 77 Days During Reporting Period.One Unplanned Liquid Release Documented in LER 89-009 (← links)
- 05000254/LER-1998-018, Forwards LER 98-018-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1998-017, Forwards LER 98-017-00 for Quad Cities Nuclear Power Station.Rept Submitted IAW Requirements of Code of Federal Regulations,Title 10CFR50.73(a)(2)(v)(D).QCOS 5750-02 Will Be Revised to Clarify Sequence & Preference by 980825 (← links)
- 05000254/LER-1997-030, Forwards LER 97-030-01 Re Instrument Line Excess Flow Valves Testing Performed at Less than Nominal Reactor Pressure Due to Inadequate Procedures.Ler Provides Addl Info Re Root Cause Analysis.Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-001, Informs of Change of Committed Due Date Re Rev to Logic Test Procedures as Stated in LER 98-001,dtd 980202.Due Date Is Now 980626 to Allow Station Necessary Time to Perform Appropriate Addl Reviews of Revised Procedures (← links)
- 05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action (← links)
- 05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee (← links)
- 05000254/LER-1998-010, Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000254/LER-1998-008, Forwards LER 98-008-00,re Event Which Took Place at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1998-014, Forwards LER 98-014-00,stating That Licensee Shall Rept Any Operation or Condition Prohibited by Plant Tss.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-019, Forwards LER 97-019-00 Re Event That Occurred at Plant,Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1997-016, Forwards LER 97-016-00 Re DG Cw IST Requirements Not Being Completed When Inaccurate Predefined Work Request Was Implemented (← links)
- 05000254/LER-1998-005, Forwards LER 98-005-00 Re Event Which Occurred at Quad Cities Nuclear Power Station.Commitments Made within Ltr, Listed (← links)
- 05000254/LER-1986-007, Responds to NRC Re Violations Noted in Insp Repts 50-254/87-09 & 50-265/87-09 on 870407-09.Corrective Actions: LER 86-007-00 for Unit 2 Will Be Supplemented to Describe More Fully Root Cause,Investigation & Corrective Actions (← links)
- 05000254/LER-1997-021, Forwards LER 97-021-00 IAW 10CFR50.73(a)(2)(v)(A). Commitments Made by Util,Listed (← links)
- 05000254/LER-1997-017, Forwards LER 97-017-00.Commitment Made by Ltr,Listed (← links)
- 05000254/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73(a)(2)(iv).Rev Includes Cause Codes & Energy Industry Identification Sys Identifiers Which Were Erroneously Omitted in Original Ler.Commitments Listed (← links)
- 05000254/LER-1986-001, Responds to NRC Re Violations Noted in Insp Repts 50-254/86-06 & 50-265/86-06.Corrective Actions:Response to Repetitive Local Leak Rate Failures Provided in Encl Rev 1 to LER 86-001 (← links)
- 05000254/LER-2022-003, Both Trains of Standby Gas Treatment Inoperable Due to Blockage in the Common Discharge Line (← links)
- 05000254/LER-2022-002, Low Pressure Coolant Injection Manually Isolated Due to Valve Test Equipment Issue (← links)
- 05000254/LER-2022-001, Regarding High Pressure Coolant Injection System Inoperable Due to Gland Seal System Malfunction (← links)
- 05000254/LER-1983-006, Forwards LER 83-006/03L-0 (← links)
- 05000254/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000254/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000265/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000265/LER-1983-003, Forwards LER 83-003/03L-0 (← links)
- 05000254/LER-1983-003, Forwards LER 83-003/03L-0 (← links)
- 05000254/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- 05000254/LER-1983-015, Forwards LER 83-015/03L-0 (← links)
- 05000254/LER-1983-014, Forwards LER 83-014/03L-0 (← links)
- 05000254/LER-1983-013, Forwards LER 83-013/03L-0 (← links)
- 05000254/LER-1983-011, Forwards LER 83-011/03L-0 (← links)
- 05000254/LER-1983-007, Forwards LER 83-007/03L-0 (← links)
- 05000265/LER-1983-021, Revised LER 83-021/01T-5:on 831028,ultrasonic Exams of Large Bore Stainless Steel Pipe Welds Identified 11 Welds W/Crack Indications.Caused by Intergranular Stress Corrosion Cracking.Weld Overlay Performed (← links)
- 05000265/LER-1983-018, Revised LER 83-018/01T-1:on 831011,discovered 1-1/4 Inch long,20% through-wall Linear Indication in Weld 12S-S27. Caused by Intergranular Stress Corrosion Cracking.New Welds & Elbow Installed (← links)
- 05000265/LER-1983-001, Forwards LER 83-001/03L-0 (← links)
- 05000265/LER-1983-020, Revised LER 83-020/01T-1:on 831028,weld 02B-S9,22-inch Pipe to Cap,Weld 02BS-S12,28-inch Elbow to Pipe & Weld 02BS-F14, 28-inch Pipe to Elbow Weld Had Circumferential Linear Indications (← links)
- 05000254/LER-1983-019, Forwards LER 83-019/03L-0 (← links)
- 05000265/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000254/LER-1983-012, Forwards LER 83-012/01T-0 (← links)
- 05000254/LER-1983-010, Forwards LER 83-010/03L-0 (← links)
- 05000254/LER-1983-008, Forwards LER 83-008/03L-0 (← links)