ML16356A262
ML16356A262 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 12/05/2016 |
From: | Welsch J M Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML16356A255 | List: |
References | |
DCL-16-126 | |
Download: ML16356A262 (3) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024
[Table view]Letter to CA SHPO Regarding DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 2024-09-09 Category:Technical Specification MONTHYEARDCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024
[Table view]License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-03-10010 March 2022 License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections DCL-21-075, Technical Specification Bases, Revision 132021-10-13013 October 2021 Technical Specification Bases, Revision 13 DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-04-0101 April 2021 Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-20-076, Technical Specification Bases2020-09-10010 September 2020 Technical Specification Bases DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications2020-08-31031 August 2020 Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications DCL-18-070, Technical Specification Bases, Revision 112018-09-11011 September 2018 Technical Specification Bases, Revision 11 DCL-17-076, Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01)2017-09-28028 September 2017 Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01) DCL-16-126, Revision 10 to Technical Specification Bases2016-12-30030 December 2016 Revision 10 to Technical Specification Bases ML16356A2622016-12-0505 December 2016 Submittal of Revision 10 to Technical Specification Bases DCL-16-126, Diablo Canyon, Units 1 and 2 - Submittal of Revision 10 to Technical Specification Bases2016-12-0505 December 2016 Diablo Canyon, Units 1 and 2 - Submittal of Revision 10 to Technical Specification Bases DCL-16-104, Technical Specification Changes for License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1....2016-10-27027 October 2016 Technical Specification Changes for License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1.... ML16004A3562015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-15-087, Revision to TS 3.4.15 for License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294)2015-08-0606 August 2015 Revision to TS 3.4.15 for License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) DCL-15-059, Technical Specification Bases, Revision 92015-05-0505 May 2015 Technical Specification Bases, Revision 9 ML14209B0752014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294). Part 1 ML14209B0792014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294). Part 2 DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)2014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) DCL-13-092, Technical Specification Bases, Revision 82013-09-16016 September 2013 Technical Specification Bases, Revision 8 DCL-11-018, License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)2011-02-17017 February 2011 License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) DCL-09-032, License Amendment Request 09-03, License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-05-0505 May 2009 License Amendment Request 09-03, License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. DCL-08-008, License Amendment Request 08-01, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program2008-02-0101 February 2008 License Amendment Request 08-01, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program ML0732400082008-01-0808 January 2008 Units, 1 and 2, Tech Spec Pages for Amendment Nos. 198 and 199, Revise Technical Specification (TS) 3.3.2, TS 5.5.9, and TS 5.6.10 to Support Replacement of Steam Generators ML0728400492007-10-0202 October 2007 License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank DCL-07-093, Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank2007-10-0202 October 2007 Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank ML0701900942007-01-11011 January 2007 License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement ML0632600252006-11-21021 November 2006 Tech Spec Pages for Amendment 191 Technical Specification 5.6.5, Core Operating Limits Report (COLR) DCL-06-061, License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449)2006-05-30030 May 2006 License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449) ML0606803142006-03-0707 March 2006 Issuance of Technical Specification Pages Re LCO Applicability 3.0 - Limiting Condition for Operation (LCO) Applicability ML0602300522006-01-13013 January 2006 License Amendment Request 06-02 Revision to Technical Specification 5.6.5, Core Operating Limits Report (Colr). ML0532601052005-11-21021 November 2005 8 TS Pages - Diablo Canyon Unit 1 and 2, Issuance of Amendments 183/185 Revision to Technical Specifications 3.7.17 and 4.3 for a Temporary Cask Pit Spent Fuel Storage Rack for Cycles 14 to 16 DCL-05-120, License Amendment Request 05-05 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2005-10-19019 October 2005 License Amendment Request 05-05 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process DCL-05-068, Changes to Technical Specification Bases2005-06-0303 June 2005 Changes to Technical Specification Bases ML0508703962005-03-22022 March 2005 Technical Specification Pages Re Reporting Requirements DCL-05-018, License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria.2005-03-11011 March 2005 License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria. ML0507502632005-03-11011 March 2005 1) TS Page - Diablo Canyon, Correction to Page Issued in Amendment Nos 179 and 181, Respectively DCL-04-089, Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10.2004-07-30030 July 2004 Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10. DCL-04-037, Exigent License Amendment Request 04-02 Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.2004-04-0202 April 2004 Exigent License Amendment Request 04-02 Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. ML0407803802004-03-11011 March 2004 Supplement to License Amendment Request 03-19 Revision to Technical Specifications 3.3.3 Post Accident Monitoring (PAM) Instrumentation and 3.6.8 Hydrogen Recombiners DCL-04-013, License Amendment Request 03-17, Common Stars Amendment, Implementation of WCAP-14333 and WCAP-15376, RTS and ESFAS Test Times, Completion Times, and Surveillance Test Intervals2004-02-13013 February 2004 License Amendment Request 03-17, Common Stars Amendment, Implementation of WCAP-14333 and WCAP-15376, RTS and ESFAS Test Times, Completion Times, and Surveillance Test Intervals DCL-04-008, Response to NRC Request for Additional Information Regarding License Amendment Request 03-02, Response Time Testing Elimination and Revision to Technical Specification 3.3.1. 'Reactor Trip System (RTS) Instrumentation'.2004-01-23023 January 2004 Response to NRC Request for Additional Information Regarding License Amendment Request 03-02, Response Time Testing Elimination and Revision to Technical Specification 3.3.1. 'Reactor Trip System (RTS) Instrumentation'. DCL-03-173, License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners2003-12-30030 December 2003 License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners DCL-03-122, Changes to Technical Specifications Bases, Revision 22003-09-26026 September 2003 Changes to Technical Specifications Bases, Revision 2 DCL-03-111, License Amendment Request 03-12 Revision to Technical Specifications 3.3.1, RTS Instrumentation, and 3.3.2, ESFAS Instrumentation, Enclosures 1 - 42003-09-12012 September 2003 License Amendment Request 03-12 Revision to Technical Specifications 3.3.1, RTS Instrumentation, and 3.3.2, ESFAS Instrumentation, Enclosures 1 - 4 DCL-03-067, License Amendment Request 03-08 Revision to Technical Specification 3.5.1, Emergency Core Cooling Systems/Accumulator.2003-06-0505 June 2003 License Amendment Request 03-08 Revision to Technical Specification 3.5.1, Emergency Core Cooling Systems/Accumulator. DCL-02-097, License Amendment Request 02-05, Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, & Revised Reactor Coolant System Flow Measurement2002-08-27027 August 2002 License Amendment Request 02-05, Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, & Revised Reactor Coolant System Flow Measurement DCL-02-038, License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions2002-04-10010 April 2002 License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions 2024-07-31 Category:Bases Change MONTHYEARDCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024
[Table view]License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-21-075, Technical Specification Bases, Revision 132021-10-13013 October 2021 Technical Specification Bases, Revision 13 DCL-20-076, Technical Specification Bases2020-09-10010 September 2020 Technical Specification Bases DCL-18-070, Technical Specification Bases, Revision 112018-09-11011 September 2018 Technical Specification Bases, Revision 11 DCL-16-126, Revision 10 to Technical Specification Bases2016-12-30030 December 2016 Revision 10 to Technical Specification Bases DCL-16-126, Diablo Canyon, Units 1 and 2 - Submittal of Revision 10 to Technical Specification Bases2016-12-0505 December 2016 Diablo Canyon, Units 1 and 2 - Submittal of Revision 10 to Technical Specification Bases ML16356A2622016-12-0505 December 2016 Submittal of Revision 10 to Technical Specification Bases DCL-16-104, Technical Specification Changes for License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1....2016-10-27027 October 2016 Technical Specification Changes for License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1.... ML16004A3562015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-15-059, Technical Specification Bases, Revision 92015-05-0505 May 2015 Technical Specification Bases, Revision 9 ML14209B0792014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294). Part 2 DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)2014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) ML14209B0752014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294). Part 1 DCL-13-092, Technical Specification Bases, Revision 82013-09-16016 September 2013 Technical Specification Bases, Revision 8 DCL-11-018, License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)2011-02-17017 February 2011 License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) DCL-05-120, License Amendment Request 05-05 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2005-10-19019 October 2005 License Amendment Request 05-05 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process DCL-05-068, Changes to Technical Specification Bases2005-06-0303 June 2005 Changes to Technical Specification Bases ML0407803802004-03-11011 March 2004 Supplement to License Amendment Request 03-19 Revision to Technical Specifications 3.3.3 Post Accident Monitoring (PAM) Instrumentation and 3.6.8 Hydrogen Recombiners DCL-03-122, Changes to Technical Specifications Bases, Revision 22003-09-26026 September 2003 Changes to Technical Specifications Bases, Revision 2 DCL-02-038, License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions2002-04-10010 April 2002 License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions 2024-07-31 |
Text
James M. Welsch ..
Pacific Gas and Electric Company Vice President, Nuclear Generation Diablci Canyon Power Plant Mail Code 104/6 December 5, 2016 PG&E Letter DCL-16-126 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units t and 2 Technical Specification Bases. Revision 10
Dear Commissior:
iers and Staff: P. 0. Box 56 Avila Beach, CA 93424 80 5. 545. 3242 Internal:
691.3242 Fax: 805. 545.4884 10 CFR 50.71(e) Pursuant to Diablo Canyon Power Plant (DCPP) Unit 1 and-Unit 2 Technical Specification (TS) 5.5.14, "Technical Specifications (TS) Bases Control Program," Pacific Gas and Electric Company (PG&E) hereby submits Revision 1 O of the DCPP TS Bases. DCPP TS Bases, Revision 10, includes changes made to the DCPP TS *Bases from May 1, 2015, through November 8, 2016, and replaces Revision 9 .in its entirety.
Changes are noted by revision bars in the right margin of the affected TS Bases. PG&E is submitting the DCPP TS Bases, Revision 10, on the enclosed compact disc (CD), labeled "Diablo Canyon Power Plant Technical Specification Bases, Revision 10," dated December 2016. The contents are in Adobe Acrobat portable document format. A copy of this CD is being provided to the NRC Region IV Administrator, the DCPP NRC Senior Project Manager, and the DCPP NRC Senior Resident Inspector. , The CD contains the following file: File Name DCPPTSBasesR 1 O.pdf File Size 2.48 Megabytes PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. * ' If you have any questions regarding this submittal, please contact Mr. Hossein Hamzehee at (805) 545-4720.
- A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek Document Control Desk December 5, 2016 Page2 E 1 d7 /4418/50708777 Enclosure Diablo Distribution PG&E Letter DCL-16-126 cc: cc/encl: Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek i I : H 1-* 1.t II I I, t l* ,!' r 'I H d \Ii *fl ,\(\! Diablo Canyon -Units 1 and 2
- Technical Specification Bases Revisi?n 10, December 2016 PG&E Letter DCL-16-126 Enclosure (Revision 10 replaces Revision 9 in its entirety)