ML12271A444
ML12271A444 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 10/26/2011 |
From: | Weiss S S Ameren Services Co |
To: | Office of Nuclear Reactor Regulation, State of MO, Dept of Natural Resources |
References | |
ULNRC-05893, MO-0098001 | |
Download: ML12271A444 (17) | |
Text
W Ameren Ameren Services to oO oO , .. ** o o o o oo o o o 0 oo, o o o oo o o o **-o o o o o o.o oo o o oooo o oo -* o o
- o o o O* *
- o-o* o o-o o o 0 *!*
- o o o o oo oo o ** o o oo o o o oo o o o o o o Oo " o* I o o , .. o oo o-oo oO o 0 0 '0 0 0 ° 0 000 oo *0 oo 0 0° o 0 oo oo .. o o oo OO"t*O 0 o o-. 0 0 o o 0 0 o *0 °0 **O 0 0° oo o o 0 0 ** 00 ooo 0 0 ""t' o 0 oo oo 0 ° O*O 0 0 0 ° "' 0000 00 I *0 o 0 .... ' ...
..
...................
' ..............................................................
...............................
- -*-*****
....... *-***-' .............
.......................................... . October 2 ,. 2011 Department of Natural Resources Northeast Regional Office 1709 Prospect Drive Macon, Missouri 63552-2602 Re: Ameren Missouri Callaway Energy Center NPDES Permit No. M0-0098001 Third Quarter, 2011 NPDES Discharge Monitoring Reports (DMRs)
Dear Sir or Madam:
In accordance with requirements of the Union Electric Company, d/b/a Ameren Missouri Callaway Energy Center , NPDES Permit M0-0098001 , please find enclosed the DMRs for the Third Quarter 2011 (July, August, and September). Please call me at 314-554-3480 if you have any questions concerning the enclosed reports. StevenS. Weiss Environmental Scientist , NPDES DMR Coordinato r Environmental Services Ameren Services as Affiliated Agent for Ameren Missouri T 314.554.3480 F 314.554.4182 sweiss@ameren
.com Attachment
- ::::
- .: ;: ::: 19 0 1 Ch o uteau Avenue ********************************,.****************,.-**************;*******,.**********r**********************
.............
..............................................................................................
PO Box 66149, MC 602 :::::::::::::::::::::::::::::::
- ::::: :::::::::::: ::
- ::::::::::::::::
- ::::::::::::::::::::: St. Lou i s , MO 63166*6149 Ame r en.com DATE 7 12 14 19 22 26 SOURCE 6 7 6 7 6 7 AMEREN MISSOURI-CALLAWAY PLANT Page 1 of 5 FLOW (MGD) 0.089 0.085 0.076 0.080 0.064 0.084 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JULY 2011) ISSUE DATE 4/14/2009 BORON TSS pH (mg/1) (mg/1) (SU) 10 4 8.80 10 4 8.74 35 3 8.97 23 6 6.21 2 17 7.40 40 13 7.56 OUTFALL# 001 RADWASTE SYSTEM PARAMETER MONITORING FINAL EFFLUENT LIMITS (UNITS) MEAS SAMPLE DAILY WKLY MO FREQ. TYPE MAX AVE AVE FLOW(MGD)
DAILY(EB)
TOTAL * -* BORON (mgll) DAILY(EB)
GRAB * -* TSS (mgll) DAILY(EB)
GRAB 45 -30 O&G (mgll) MONTHLY GRAB 20 -15 BODs (mgll) MONTHLY GRAB * -* pH(SU) DAILY(EB)
GRAB 6.0-9.0 -6.0-9.0 TRC(mgll)
MONTHLY GRAB 0.2 -0.104 TEMP ( oC) (I) MONTHLY GRAB * -* *MONITORING REQUIREMENT ONLY (EB) EACH BATCH ( 1) TEMPERATURE TO BETAKEN AT TIME OF SAMPLE ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER 10CSR20-7.0I5 SOURCES WASTE MONITOR TANK A 2 WASTE MONITOR TANK B 3 STEAM GENERATOR SLOWDOWN 4 SEC. LIQ. WASTE MONITOR TANKA 5 SEC. LIQ. WASTE MONITOR TANKB 6 LIQ. RADW ASTE DISCHARGE TANK A 7 LIQ. RADW ASTE DISCHARGE TANK B DATE O&G (mg/1) BODs(mgll)
TRC(mgll)
TEMP. *. per 7/6/2011 8 1 0.02 27 COMMENTS File C170.0005 Page 1 of5 CA0320 02/04/11 DATE I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 FLOW (MGD) 5.8 6.0 6.0 5.8 5.9 5.8 6.6 5.9 5.7 4.7 7.6 7.9 5.6 6.1 7.0 6.0 5.7 5.6 5.2 6.8 7.7 7.1 6.8 8.8 6.7 8.6 7.5 6.9 7.8 7.1 7.6 AMEREN MISSOURI-CALLA WAY PLANT Page 2 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JULY 2011) ISSUE DATE 4/14/2009 TRC TEMP (mg/1) ('t') <0.05 35 <0.05 35 <0.05 35 <0.05 33 <0.05 33 <0.05 33 <0.05 32 <0.05 31 0.21 33 <0.05 35 <0.05 35 <0.05 35 <0.05 33 <0.05 33 <0.05 34 <0.05 35 <0.05 36 <0.05 35 <0.05 35 <0.05 35 <0.05 35 <0.05 35 <0.05 35 <0.05 35 <0.05 34 <0.05 35 <0.05 35 <0.05 35 <0.05 34 <0.05 34 <0.05 34 OUTFALL #002 COOLING TOWER BLOWDOWN PARAMETER MONITORING FINAL EFFLUENT LIMITS (UNITS) MEAS SAMPLE DAILY WKLY MONTHLY FREO. TYPE MAX AVE AVE FLOW(MGD)
DAILY 24HR *
- TOTAL -TSS (mgll) WEEKLY GRAB * -* TDS (mgll) WEEKLY GRAB * -* O&G(mgll)
QUARTERLY GRAB 20 -15 TRC (mgll) DAILY GRAB 0.2 -0.104 pH(SU) CONTINUOUS 24HR 6.0-9.0 6.0-9.0 RECORDED -TEMP(oC)0 l DAILY GRAB * -* QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER. ( 1) TEMPERATURE TO BETAKEN AT TIME OF SAMPLE
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER 10CSR20-7.015 DATE TSS TDS O&G (m!lll) (mJ!Il) (mJ!Il) 7/4/2011 28 2016 (not required) 414 2008 (not required) 7/11/2011 7/18/2011 69 2292 (not required) 7/25/2011 47 1656 (not required) .COMMENTS.
NO pH EXCURSIONS OCCURRED THIS MONTH The July 9, 20 11 TRC value is suspected to be due to sample contamination.
Details were provided to the MDNR Northeast Regional Office in a letter dated July 15, 2011. File C170.0005 Page 2 of5 CA0320 02/04/11 AMEREN MISSOURI-CALLA WAY PLANT Page 3 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JULY 2011) ISSUE DATE 4/14/2009 OUTFALL#003 DATE FLOW (MGD) NO DISCHARGE COMMENTS NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HEREIN ARE NOT DISCHARGED, AS THIS OUTFALL (#003) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. DATE FLOW OUTFALL #004 (INCLUDED UNDER OUTFALL #003) OUTFALL #007 BOD, I TSS I pH NH3 FC NO DISCHARGE O&G NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HEREIN ARE NOT DISCHARGED, AS THIS OUTFALL (#007) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. WATER TREATMENT PLANT MONITORING FINAL EFFLUENT LIMITS PARAMETER DAILY WKLY MONTH (UNITS) MEAS SAMPLE FREQ. TYPE MAX AVE AVE FLOW 24HR *
- WEEKLY -(MGD) TOTAL TSS (mg/1) MONTHLY GRAB 100 -30 O&G (mg/1) MONTHLY GRAB 20 -15 TRC (mg/1) MONTHLY GRAB 0.2 -0.104 pH (SU) MONTHLY GRAB 6.0-9.0 -6.0-9.0
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.015 DATE TSS O&G TRC pH (mf!l]) (mg!l) fmf!!D isw DEMINERALIZER SYSTEM SANITARY WASTE MONITORING FINAL EFFLUENT LIJI;fiTS
- ..
- PARAMETER DAlLY 1.* Wf(LY MJ)Nm* MEAS SAMPLE (UNITS) FREQ. TYPE MAX I.AVE AYE I FLOW 24HR *
- QUARTERLY
-(MGD) EST. BOD 5 (mg/1) QUARTERLY GRAB -65 45 TSS (mg/1) QUARTERLY GRAB -110 70 pH (SU) QUARTERLY GRAB 6.0-9.0 -6.0-9.0 NH3 asN QUARTERLY
- -* (mgfl) GRAB rEC""AL COLIFORM QUARTERLY GRAB * -* (Ctsll 00 ml) O&G (mg/1) QUARTERLY GRAB IS -10 QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER.
(1)
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR20-7.015 File Cl70.0005 Page 3 of5 CA0320 02/04/11 AMEREN MISSOURI-CALLAWAY PLANT Page 4 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JULY 2011) ISSUE DATE 4/14/2009 OUTFALL#009 DATE FLOW TSS BOD pH (MGD) (mg/1) (mg/1) (SUJ NO DISCHARGE COMMENTS SYSTEM IS NOT IN OPERATION OUTFALLS #010-#015 (MONITORING REPORTS SHALL NOT BE SUMITTED.
THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.)
OUTFALL #016 . "DATE FLOW TSS O&G TRC TEMP (MGDJ '"(mi!/1) (mg/J) (mi!/1) ("CJ NOT REQUIRED UNTIL AUGUST COMMENTS INTAKE HEATER BLOWDOWN MONITORING FINAL EFFLUENT LIMITS PARAMETER (UNITS) MEAS SAMPLE "DAILY WKLY MONTH FREQ. TYPE MAX AVE AVE FLOW 24HR (MGD) WEEKLY(!)
- -* TOTAL TSS (mg/1) WEEKLY(!)
GRAB 100 -30 O&G (mg/1) WEEKLY (I) GRAB 20 -15 pH (SU) WEEKLY (I) GRAB 6.0-9.0 -6.0-9.0
- MONITORING REQUIREMENT ONLY (I) SAMPLE WEEKLY WHEN DISCHARGE OCCURS ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.0I5 STORM WATER RUNOFF PONDS STORM WATER RUNOFF IS MONITORED UNDER THE CALLAWAY STORM WATER POLLUTION PREVENTION PLAN COOLING TOWER BYPASS FLOW MEAS FREQ. (MGD) QUARTERLY TSS (mg/1) QUARTERLY O&G (mg/1) QUARTERLY TRC (mg/1) QUARTERLY pH (SU) QUARTERLY TEMP ('C) QUARTERLY .SAMPLE TYPE 24HR EST. GRAB GRAB GRAB GRAB GRAB
- 100 20 0.2 6.0-9.0 *
- 30 15 0.104 6.0-9.0
- QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER.
- --!-----
- --*-*---*-*----
- --*--*-* **--------*-MONI'I'ORING..REQIJIREMEN'I'QNL-Y----
-
ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.0I5 OUTFALL #017 (THERE SHALL BE NO DISCHARGE OF WASTEWATER FROM THIS OUTFALL TO WATERS OF THE STATE OF MISSOURI)
File C170.0005 Page 4 of5 ULTIMATE HEAT SINK CA0320 02/04/11 AMEREN MISSOURI-CALLA WAY PLANT Page 5 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JULY 2011) ISSUE DATE 4114/2009 "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
Preparer/PIN Page 5 of5 Approved Plant Manager/PIN CA0320 02/04111
.-------------------------------------------
DATE 2 8 10 12 17 23 30 SOURCE 6 7 6 7 6 7 6 AMEREN MISSOURI-CALLAWAY PLANT Page 1 of 5 FLOW (MGD) 0.076 0.071 0.069 0.074 0.077 0.086 0.089 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (AUGUST 2011) ISSUE DATE 4/14/2009 BORON TSS pH (mg/1) (mg/1) (SU) 32.7 27 8.01 3.5 12 8.61 25 15 8.41 38 3 6.56 56 5 8.11 49 I 8.12 42 4 8.81 OUTFALL# 001 RADWASTE SYSTEM PARAMETER MONITORJNG FINAL EFFLUENT LIMITS (UNITS) MEAS SAMPLE DAILY WKLY MO FREQ. TYPE MAX AVE AVE FLOW(MGD)
DAILY(EB)
TOTAL * -* BORON (mg/1) DAILY (EB) GRAB * -* TSS (mg/1) DAILY(EB)
GRAB 45 -30 O&G(mg/1)
MONTHLY GRAB 20 -15 BOD 5 (mg/1) MONTHLY GRAB * -* pH(SU) DAILY (EB) GRAB 6.0-9.0 -6.0-9.0 TRC (mg/1) MONTHLY GRAB 0.2 -0.104 TEMP(oC)(1)
MONTHLY GRAB * -*
- MONITORING REQUIREMENT ONLY (EB) EACH BATCH (I) TEMPERATURE TO BE TAKEN AT TIME OF SAMPLE ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.015 SOURCES WASTE MONITOR TANK A 2 WASTE MONITOR TANKB 3 STEAM GENERA TOR SLOWDOWN 4 SEC. LIQ. WASTE MONITOR TANKA 5 SEC. LIQ. WASTE MONITOR TANK B 6 LIQ. RADWASTE DISCHARGE TANK A 7 LIQ. RADW ASTE DISCHARGE TANK B DATE O&G (mgll) BOD5 (mg!l) TRC (mgll) TEMP (oC} 8/2120I I 16 209 .01 26 COMMENTS File Cl70.0005 Page 1 of5 CA0320 02/04/11
...-----------------------------
DATE 1 2 3 4 5 6 7 8 9 10 II 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 FLOW (MGD) 6.7 8.7 6.8 7.1 6.1 6.6 6.7 8.3 7.3 7.8 5.8 8.4 7.6 7.4 7.2 8.0 9.9 5.7 7.3 7.4 7.7 7.6 8.4 4.7 7.0 7.2 7.8 7.6 7.1 8.3 7.1 AMEREN MISSOURI-CALLAWAY PLANT Page 2 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (AUGUST 2011) ISSUE DATE 4/14/2009 TRC TEMP (mg/1) ('t:') <0.05 35 <0.05 36 <0.05 35 <0.05 34 0.08 34 <0.05 34 <0.05 34 <0.05 32 <0.05 31 0.06 31 <0.05 31 <0.05 32 <0.05 33 <0.05 31 <0.05 31 <0.05 31 <0.05 33 <0.05 34 <0.05 33 <0.05 33 <0.05 32 <0.05 33 <0.05 34 <0.05 35 <0.05 31 <0.05 32 0.07 34 0.07 31 <0.05 31 <0.05 32 <0.05 33 OUTFALL#002 COOLING TOWER BLOWDOWN PARAMETER MONITORING FINAL EFFLUENT LIMITS (UNITS) MEAS SAMPLE DAILY WKLY MONTHLY FREQ. TYPE MAX AVE AVE FLOW(MGD)
DAILY 24HR *
- TOTAL -TSS (mg/1) WEEKLY GRAB * -* TDS (mg/1) WEEKLY GRAB * -* O&G(mg/1)
QUARTERLY GRAB 20 -IS TRC (mg/1) DAILY GRAB 0.2 -0.104 pH (SU) CONTfNUOUS 24HR 6.0-9.0 6.0-9.0 RECORDED -TEMP (oC) (ll DAILY GRAB * -* QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER. (I) TEMPERATURE TO BE TAKEN AT TIME OF SAMPLE
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER 10CSR 20-7.015 DATE TSS TDS O&G (mf!/1) (ml(/1) (mf!/1) 8/1/2011 50 1916 4.7 8/8/2011 59 2080 8/15/2011 87 1692 8/22/2011 32 1848 8/29/2011 45 1852 COMMENTS NO pH EXCURSIONS OCCURRED THIS MONTH File C 170.0005 Page 2 of5 CA0320 02/04111 AMEREN MISSOU NPDESMONI RI -CALLAWAY PLANT TORING REPORT RIOD (AUGUST 2011) REPORTING PE Page 3 of 5 PERMIT NO. M0-0098001 ISSUE DATE 4/14/2009 OUTFALL #003 DA.TE FLOW (MGD) NO DISCHARGE COMMENTS NOTE THAT THE DISCHARGE FROM THE CO NVERTED REIN ARE 003)1S EATMENT REUSE. WETLAND AND THE FLOWS REPORTED HE NOT DISCHARGED, AS THIS OUTFALL(#
RECYCLED TO THE HEAD OF THE WATER TR PLANT FOR FURTHER TREATMENT AND OUTFALL #004 (INCLUDED UNDER OUTFALL #0 03) OUTFALL #007 DATE FLOW BOD 5 TSS .pH NH3 FC O&G NO DISCHARGE COMMENTS NOTE THAT THE DISCHARGE FROM THE CON VERTED WETLAND AND THE FLOWS REPORTED HERE IN ARE NOT CYCLED TO NT FOR DISCHARGED, AS THIS OUTFALL (#007) IS RE THE HEAD OF THE WATER TREATMENT PLA FURTHER TREATMENT AND REUSE. WATER TREATMENT PLANT MONITORING FINAL EFFLUENT LIMITS PARAMETER MEAS SAMPLE DAILY WKLY MONTH (UNITS) FREQ. TYPE MAX AVE AVE FLOW 24HR *
- WEEKLY -(MGD) TOTAL TSS (mg/1) MONTHLY GRAB 100 -30 O&G (mg/1) MONTHLY GRAB 20 -15 TRC (mg/1) MONTHLY GRAB 0.2 -0.104 pH(SU) MONTHLY GRAB 6.0-9.0 -6.0-9.0
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERA liONS LABORATORY USING METHODS SPECIFIED UNDER 10CSR20-7.015 DATE TSS O&G TRC pH (mJ!/J) (mJ!/1) fml!f]) isw DEMINERALIZER SYSTEM SANITARY WASTE MONITORING FINAL EFFLUENT LIMITS PARAMETER DAILY WKLY MONTH (UNITS) MEAS SAMPLE FREQ. TYPE MAX AVE AVE FLOW 24HR *
- QUARTERLY
-(MGD) EST. BODs(mg/1)
QUARTERLY GRAB -65 45 TSS (mg/1) QUARTERLY GRAB -110 70 pH (SU) QUARTERLY GRAB 6.0-9.0 -6.0-9.0 NH3asN (mg/1) QUARTERLY GRAB * -* FECAL COLIFORM QUARTERLY GRAB * -* (Cts/100 ml} O&G (mg/1} QUARTERLY GRAB 15 -10 QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER. (I)
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR20-7.015 File C 170.0005 Page 3 of5 CA0320 02/04/11 ----
AMEREN MISSOURI-CALLAWAY PLANT Page 4 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (AUGUST 2011) ISSUE DATE 4/14/2009 OUTFALL #009 DATE FLOW TSS BOD pi{ (MGD) (mf!/1) (mf!IJ) fSUJ NO DISCHARGE COMMENTS SYSTEM IS NOT IN OPERATION OUTFALLS #010-#015 (MONITORING REPORTS SHALL NOT BE SUMITTED.
THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.)
OUTFALL #016 DATE FLOW TSS O&G pH TRC TEMP (MGD) (mg/1) (mg/1) (SU) (mf!!]) f"CJ 8125 1.2 7 6 7.98 <0.05 *26.1 COMMENTS OUTFALL#017 (THERE SHALL BE NO DISCHARGE OF WASTEWATER FROM THIS OUTFALL TO WATERS OF THE STATE OF MISSOURI)
INTAKE HEATER BLOWDOWN MONITORING FINAL EFFLUENT LIMITS PARAMETER (UNITS) MEAS SAMPLE DAILY WKLY MONTH FREQ. TYPE MAX AVE AVE FLOW 24HR WEEKLY(!)
- -* (MGD) TOTAL TSS (mg/1) WEEKLY(!)
GRAB IOO -30 O&G (mg/1) WEEKLY(!)
GRAB 20 -15 pH (SU) WEEKLY(!)
GRAB 6.0-9.0 -6.0-9.0
- MONITORING REQUIREMENT ONLY (I) SAMPLE WEEKLY WHEN DISCHARGE OCCURS ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LA BORA TORY USING METHODS SPECIFIED UNDER 1 OCSR 20-7.015 STORM WATER RUNOFF PONDS STORM WATER RUNOFF IS MONITORED UNDER THE CALLAWAY STORM WATER POLLUTION PREVENTION PLAN COOUNG TOWER BYPASS MONITORING FINAL EFFLUENT LIMITS PARAMETER (UNITS) MEAS SAMPLE DAILY WKLY MONTH FREQ. TYPE . MAX AVE AVE FLOW 24HR (MGD) QUARTERLY
- -* EST. TSS (mg/1) QUARTERLY GRAB 100 -30 O&G (mg/1) QUARTERLY GRAB 20 -15 TRC (mg/1) QUARTERLY GRAB 0.2 -0.104 pH (SU) QUARTERLY GRAB 6.0-9.0 -6.0-9.0 TEMP (0 C) QUARTERLY GRAB * -* QUARTERLY SAMPLES SHALL BETAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER.
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LA BORA TORY USING METHODS SPECIFIED UNDER I OCSR 20-7.0 I 5 ULTIMATE HEAT SINK File C 170.0005 Page 4 of5 CA0320 02/04111 AMEREN MISSOURI-CALLAWAY PLANT Page 5 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (AUGUST 2011) ISSUE DATE 4/14/2009 "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Q. 6'63'15 ,) "' .. . Preparer/PIN Page 5 of5 Approved Plant Manager/PIN CA0320 02/04/11 -------------------------------------------------------------------------------
- .
'*
2 7 12 13 14 15 16 19 20 21 23 28 30 . "' *. .. ', *-*.: 7 6 7 6 7 6 7 6 7 6 7 7 6 AMEREN MISSOURI-CALLAWAY PLANT Page 1 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (SEPTEMBER 2011) ISSUE DATE 4/14/2009
- . BOROJi. .pH . .
- *:s : .. .
0.077 30 4 8.34 0.089 21 2 8.79 0.089 24 4 8.54 0.093 25 4 7.82 0.093 26 6 6.58 0.071 24 3 6.71 0.093 15 5 7.88 0.092 17 15 7.23 0.092 13 8 8.00 0.092 37 4 8.2 0.050 21 12 7.2 0.091 17 7 7.7 0.093 5 4 8.34 OUTFALL# 001 RADWASTE SYSTEM * .. ' _MONird/wiG MEAS. SAMP_LE
,,C:!ofO .* ** :FREQ. TYPE-* MAX* ... *:AVEs!,:
-::.AVE-FLOW(MGD)
DAILY(EB)
TOTAL * -* BORON (mgll) DAILY (EB) GRAB * -* TSS (mgll) DAILY(EB)
GRAB 45 -30 O&G (mgll) MONTHLY GRAB 20 -15 BOD 5 (mgll) MONTHLY GRAB * -.. pH(SU) DAILY(EB)
GRAB 6.0-9.0 -6.0-9.0 TRC (mgll) MONTHLY GRAB 0.2 -0.104 TEMP (*C) {I) MONTHLY GRAB * -*
- MONITORING REQUIREMENT ONLY (EB) EACH BATCH (I) TEMPERATURE TO BE TAKEN AT TIME OF SAMPLE ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR20-7.015 SOURCES WASTE MONITOR TANKA 2 WASTE MONITOR TANK B 3 STEAM GENERATOR SLOWDOWN 4 SEC. LIQ. WASTE MONITOR TANKA 5 SEC. LIQ: WASTE MONITOR TANKB 6 LIQ. RADW ASTE DISCHARGE TANK A 7 LIQ. RADWASTE DISCHARGE TANK B ... TEMP* . DATE O&G.(mgll)
BODj(mgll)
TRC(m II). ., ' g' . * ' (oC)'; ;'/ 9/1/2011 2.9 3 0.02 30 File C170.0005 Page 1 of5 CA0320 02/04/11
,DATc_E'r
- --,------:r'if:---
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ..
4.7 5.3 5.7 4.0 4.7 4.2 7.8 6.2 4.8 5.5 4.9 7.1 4.3 9.5 4.6 8.2 6.4 4.0 5.3 5.5 7.1 4.5 4.8 5.1 5.0 3.7 3.6 7.0 4.9 6.5 ----------
AMEREN MISSOURI-CALLA WAY PLANT Page 2 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (SEPTEMBER 2011) ISSUE DATE 4/14/2009 , .. TEMP,: f'9cl-< <0.05 35 <0.05 34 0.36(l) 34 <0.05 31 <0.05 28 <0.05 27 <0.05 27 <0.05 28 <0.05 28 <0.05 29 <0.05 29 <0.05 30 <0.05 31 <0.05 27 <0.05 24 <0.05 25 <0.05 26 <0.05 28 <0.05 29 <0.05 28 <0.05 28 <0.05 26 <0.05 26 <0.05 26 <0.05 25 <0.05 26 <0.05 27 <0.05 26 <0.05 28 <0.05 28 OUTFALL #002 COOLING TOWER BLOWDOWN ,':. ' MO!Vi_Tpljl/'f/j::;J
- >., ,
- **":ipyA£!ffF:u!ENT,J:IMiis.
- .i 'tJ; !,,'fR-1-l!fETER
- *,, 7W:<(UNITS)
--* MEAS, :: *-:
';'DAILY
- WirL_f 'MONTHLY'* ,o ' FREQ.-.-:.**ifl>E-
- ;i* Ai.U, .
- t:AVE.*. .W<" AVE.
.. FLOW(MGD)
DAILY 24HR TOTAL * -* TSS (mg/1) WEEKLY GRAB * -* IDS (mgll) WEEKLY GRAB * -* O&G (mg/1) QUARTERLY GRAB 20 -15 TRC (mg/1) DAILY GRAB 0.2 -0.104 pH (SU) CONTINUOUS 24HR 6.0-9.0 6.0-9.0 RECORDED -TEMP (oC) (ll DAILY GRAB * -* QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER. (I) TEMPERATURE TO BE TAKEN AT TIME OF SAMPLE
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR20-7.015 9/5/2011 41 2460 9/12/2011 55 2172 9/19/2011 157 1944 9126/201 I 55 2356 *cOMMENTS'
' '-----** -* ..
NO pH EXCURSIONS OCCURRED THIS MONTH (2) The TRC exceedance on 9/3 was due to changes in chlorine demand resulting from a molluscicide treatment.
Bleach addition rates have been adjusted.
An NPDES Exception Report detailing the TRC exceedance was submitted to MDNR NERO on 9n /201 1. File C170.0005 Page 2 of5 CA0320 02/04/11 AMEREN MISSOURI-CALLA WAY PLANT Page 3 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (SEPTEMBER 2011) ISSUE DATE 4/14/2009 OUTFALL #003 NO DISCHARGE . ' * ,I., NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HERE!N ARE NOT DISCHARGED, AS THIS OUTFALL (#003) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. OUTFALL #004 (lNCLUDED UNDER OUTFALL #003) OUTFALL #007 NO DISCHARGE NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HEREIN ARE NOT DISCHARGED, AS THIS OUTFALL (#007) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. WATER TREATMENT PLANT FLOW (MGD) TSS (mg/1) O&G (mg/1) TRC {mg/1) pH (SU) WEEKLY MONTHLY MONTHLY MONTHLY MONTHLY 24HR TOTAL GRAB GRAB GRAB GRAB
- MONITOR!NG REQUIREMENT ONLY
- 100 20 0.2 6.0-9.0
- 30 15 0.104 6.0-9.0 ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY US!NG METHODS SPECIFIED UNDER IOCSR 20-7.0 IS DATE DEMINERALIZER SYSTEM SANITARY WASTE PARAMETER (UNITS) MEAS FREQ. FLOW 24HR (MGD) QUARTERLY EST. *
- BODs (mg/1) QUARTERLY GRAB 65 45 TSS (mg/1) QUARTERLY GRAB 110 70 pH (SU) QUARTERLY GRAB 6.0-9.0 6.0-9.0 NH3 as N QUARTERLY GRAB *
- QUARTERLY GRAB
- QUARTERLY GRAB 15 10 QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER.
(1)
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.015 File C170.0005 Page 3 of5 CA0320 02/04/11 I AMEREN MISSOURI-CALLA WAY PLANT NPDES MONITORING REPORT REPORTING PERIOD (SEPTEMBER 2011) Page 4 of 5 PERMIT NO. M0-0098001 ISSUE DATE 4/I4/2009 OUTFALL #009 tDATE NO DISCHARGE SYSTEM IS NOT IN OPERATION OUTFALLS #010-#015 (MONITORING REPORTS SHALL NOT BE SUMITTED.
THERE *SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.) ., . OUTFALL #017 (THERE SHALL BE NO DISCHARGE OF WASTEWATER FROM THIS OUTFALL TO WATERS OF THE STATE OF MISSOURI)
INTAKE HEATER BLOWDOWN
- MONITORING REQUIREMENT ONLY (I) SAMPLE WEEKLY WHEN DISCHARGE OCCURS ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.015 STORM WATER RUNOFF PONDS STORM WATER RUNOFF IS MONITORED UNDER THE CALLAWAY STORM WATER POLLUTION PREVENTION PLAN QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER.
- MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERA T!ONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.015 ULTIMATE HEAT SINK File C170.0005 Page 4 of5 CA0320 02/04/11 AMEREN MISSOURI-CALLA WAY PLANT NPDES MONITORING REPORT REPORTING PERIOD (SEPTEMBER 2011) Page 5 of 5 PERMIT NO. M0-0098001 ISSUE DATE 4/14/2009 "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
Preparer/PIN Page 5 of5 5t/6f Approved Plant Manager/PIN CA0320 02/04/11 bee: D. Maschler I File C170.0005 (CA-460) JCP I GPG I SSW WQ3.1.2.1