ULNRC-05893, Callaway, Unit 1, Enclosure 9 to ULNRC-05893 - Discharge Monitoring Report - 2nd Quarter 2012

From kanterella
(Redirected from ML12271A448)
Jump to navigation Jump to search
Callaway, Unit 1, Enclosure 9 to ULNRC-05893 - Discharge Monitoring Report - 2nd Quarter 2012
ML12271A448
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/20/2012
From: Weiss S S
Ameren Services Co
To:
Office of Nuclear Reactor Regulation, State of MO, Dept of Natural Resources
References
ULNRC-05893, MO-0098001
Download: ML12271A448 (17)


Text

Ameren Services *** ***to roo 0 I *O ' ' * *******to*

                • >O oo*o**oooooooo**O oooO**o*oO*

OO*o*oo ** ,,.,,,,,,, 0'"

'''''''***o*o*oooH o ooooooooo o o*ooo>ooooo*ooOOoo oo*ooooo 00000 oOo .. o oooooOoOoo OooH OtOOO>OtOOOO O * ** * o o' oo o o o oo 'o 't' '* o 'o '0

  • o oo
  • o' * 'o o '**'
  • O*
  • oO o o o *I o _., * * ** ,., oo oo o.,
  • o o' '* o
  • oo o
  • o
  • o * 'o **' ** ** ** * * ** ** o *'
  • o o **
  • o
  • o ** o
  • o
  • o
  • o ooo *** o '"'"' ooo o
  • I'""' o *' '" ' ** ** **oo o o oo ** oo ro 0 o o " o oo o' o o' ooo o o o o oO ool J u ly 20 , 2012 Department of Natural Resources Northeast Regional Office 1709 Prospect Drive Macon, Missouri 63552-2602 Re: Ameren Missouri Callaway Energy Center NPDES Permit No. Mo-oo98001 Second Quarter, 2012 NPDES Discharge Monitoring Reports (DMRs)

Dear Sir or Madam:

In accordance with requirements of the Union Electric Company, d/b/a Ameren Missouri Callaway Energy Center, NPDES Permit M0-0098001, please find enclosed the DMRs for the Second Quarter 2012 (April, May, and June). Please call me at 314*554-3480 if you have any questions concerning the enclosed reports. Steven S. Weiss Environmental Scientist , NPDES DMR Coordinator Ameren Env i ronmental Services Ameren Services as Affiliated Agent for Ameren Missour i Enclosure

: : :: :::::.:
:::::: : ::: :;::: :::::::: :::; ::: :. :;: ::::::::.:::
. : .. :::::::::
:: :: :: :. ::: .
  • _*:.:_:_:_:_:_:_:_:, ** *:_:_:_:,:.:

.** *:.: .* :* .*** *: .** *: ........ *:.: ** :* *** :* *. :.=.* ** :.:_:,* ** :.: .* ::.:.:.:.:.:.:.:.:.*

    • : *** * *. *:.:_*.:.:
    • ::.* *. :.: __ :: ** ::_: ** : .* ": ... *:.: ** : ** *:.:-.::.:.:.*
      • :.::_:_: ** :::::;:_:,*_.::_:::

1901 Chouteau Avenue ............................................................................................................

PO Box 66149 , MC 602 St. LOUI S, MO 63166-6149 Am e ren.com DATE s 13 19 27 SQl!RCE 7 7 7 6 AMEREN MISSOURI -CALLAWAY PLANT Page I of 5 FLOW (MGD) 0.091 0.088 0.084 0.087 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERJOD (APRIL 2012) ISSUE DATE 411412009 BORON TSS pH (,.,tl) (lftg/1) (SU) s.o 3 7.38 3.4 s 8.88 22.35 4 8.92 o.s s 8.45 Ot.rrFALL#

001 RADWASTE SYSTEM PARAMETER MONITORING FINAL EFFLUENT Ultt1TS (UNITS) MEAS SAMPLE DAILY WXLY MQ FREO. TYl'E MAX A>>; FLOW(MGD}

OAILY(EB)

TOTAL *

GRAB *

  • TSS_im&fl)

DAILY(EB}

GRAB 45 -JO O&G(mi/1)

MONTHLY GRAB 20 -15 80D$(m&fl)

MONTHLY GRAB * -* pH{SU) DAILY(EB)

GRAB 6.0-9.0 60-90 TRC(mifl)

MONTHLY GRAB 0.2 -0 104 TEMI' (oC) (I) MONTHLY GRAB * -*

  • MONITORING REQUIREMENT ONLY (EB) EACH BATCH (!)TEMPERATURE TO BE TAKEN AT TIME OF SAMPLE ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USTNG METHODS SPECIFIED UNDER lOCSR20-70IS SOURCES I
  • WASTE MONITOR TANK A 2
  • WASTE MONITOR TANK B 3
  • SEC LIQ. WASTE MONITOR TANK A 5
  • SEC LIQ. WASTE MONITOR TANK B 6
  • UQ. RADWASTE DISCHARGE TANK A 7 UQ. RADWASTE DISCHARGE TANK B DATE 0&0 (mg/1) BODJ (mg/1) TRC(mgll) 4/512012 2.4 5 006 COMMENTS TEMP (oC) 19 File Cl70.0005 Page 1 of5 CA0320 02/04111 DATE I 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 FLOW (MGD) 4.9 4.6 5.5 2.2 6.3 59 .5 . .5 6.1 5.8 3.8 1.7 4.8 6.4 4.2 43 4.7 4.9 5.0 3.6 2.4 4.7 4.5 4.7 3.9 4.7 6.2 5.8 6.2 5.3 5.1 AMEREN MISSOURI -CALLAWAY PLANT Page 2 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (APRIL 2012) ISSUE DATE 4114/2009 nc TEMP

('t) <OOS 29 <0.05 30 <0.05 29 <0.05 29 <0.05 23 <005 22 <0.0.5 24 <0.05 23 <0.05 24 <0.05 22 <0.05 21 <O.OS 22 <0.05 23 <O.OS 26 <0.05 27 <0.05 24 <0.05 25 <0.05 25 <0.05 27 <0.05 24 <0.05 22 <0.05 22 <0.05 22 <0.05 26 <0.05 31 <0.0.5 29 <0.05 27 <O.OS 29 <0.0.5 27 <0.05 27 OUTFALL #002 COOLING TOWER BLOWDOWN PARAMETER MQNITOIUNG FINAL EFFLUENT UMITS (UNITS) M£4$ SAMPLE DAILY W.UY MONTHLY TYPE MAX AilE AJ-1i' FLOW(MGD)

DAILY 24HR .

  • TOTAL TSS(mgtl)

WEEKLY GRAB *

  • TDS (mJII) WEEKLY' GRAS * .
  • O&O(m&fl)

QUARTERLY GRAB 20 . 15 TRC(mg/1)

DAILY GRi\.9 0.2 0.104 pH (SU) CONTINUOUS 24 HR. 60.9.0 6.0*90 RECORDED . TEMP (.C) (IJ DAILY GRAB *

  • QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER. (I) TEMPERA nJRE TO BE TAKEN AT TIME OF SAMPLE
  • MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMER.ENUE CALLAWAY PLANT OPERA T!ONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20*7.015 DATB TSS TDS 04G {1116/1) (llfll/1) (l#f(/]) 41212012 47 1660 ---4/912012 32 ---1968 4/1612012 156 2064 ------412312012 124 1250 ---4/3012012 36 1924 COMMENTS NO pH EXCURSIONS OCCURRED THIS MONTH File Cl70.0005 Page 2 of5 CA0320 02/04/11 AMEREN MISSOURI -CALLAWAY PLANT NPDES MONITORING REPORT REPORTING PERIOD (APRIL 2012) Page 3 of 5 PERMIT NO. M0..0098001 ISSUE DATE 4/1412009 ouTr ML 11903 DATE FLOW (MGD) NO DISCHARGE COMMENTS NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND TilE FLOWS REPORTED HEREIN ARE NOT DISCHARGED, .AS THIS OUTFALL (#003) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. DATE FLOW OllfFALL 1#004 (INCWDED UNDER OUTFALL #003) OliTf'ALl..

!017 aoo, I TSS I pH NHJ I'C NO DISCHARGE COMMENTS O&G 6SO gallons of treated effluent !Tom the 3-celllagoon overflowed a lift station due 10 pump fa1lure on 4/lS/2012 Dclails of this condition were sent to the MDNR Nonheast Regional office on 4/1912012.

Due to the five day incubation period for BOD, the rc$ult was not included.

The BOD was 25 mg/1. NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HEREIN ARE NOT DISCHARGED, AS THIS OUTFALL (#007) IS RECYCLED TO THE HEAD OF rnE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. WATER TREATMENT PLANT MONITOR.ING FINAL EFFLUENT UMITS I'AR.AMETiiR D.fll.f wnr MONTH MIUS SAMI'L£ (UNITS) FREQ. TYPE MAX AilE AilE FLOW WEEKLY 24HR * . (MGD) TOTAL TSS (mgll) MONTHLY GRAB 100 30 O&.G (m&fl} MONTHLY GRAB 20 . tS TRC(m&fl)

MONTHLY GRAB 0.2 0.104 pH(SU) MONTHLY GRAB 60-9.0 -6.0-9.0

  • MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMeRENUECALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR W-7.015 DATE TSS O.AG TRC pH ftu/1) (m_L/11.. {Sl!) DEMINERALIZER SYSTEM SANITARY WASTE MONITOIUNG FINAL EFnUENT UMJTS DMLY WXLY MONTH MEAS SMII'LE (UNITS) FREQ. TYPE MAX AilE FLOW 24HR *
  • QUARTI!Rl.

Y . (MGD) esT. BOO, (mw'l) QUARTEJU.Y GRAB 65 4S TSS (m&'J) QUARTERLY ORAB -110 70 pH (SU) QUARTERLY ORAD 60-9.0 6.0-9.0 NH3asN QUARTERLY GRAB .

  • tRIWJ) FECAL COLifORM QUARTERLY GRAB . . * (CUIIOOml)

O&.G QUARTERLY GRAB 15 10 QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF RBRUARY, MAY, AUGUST, AND NOVEMBER. (I)

  • MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20* 7.015 File CI70.0005 Page 3 of5 CA0320 02/04/11 AMEREN MISSOURI -CALLAWAY .PLANT Page 4 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (APRIL 2012) ISSUEDATE 411412009 OU[fALL fQ99 DATE FLOW TSS BOD pH (MGDJ (1811/1) (.u/1) (SUJ NO DISCHARGE COMMENTS SYSTEM IS NOT IN OPERATION Oll'IJU I I $ 1#919 * !\101 5 (MON11'0RJNG REPORTS SHALL NOT BE SUMITIED.

THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTiiER THAN TRACE AMOUNTS.)

OUTfALL 11016 DA'I!: = 1$$ o*G TJIC T£MP 1)1 1-./11 ,,.111/1 rallllJ (OCJ COMMENTS Quarterly sample not required for April. OUTFALL 11017 (THERE SHALL BE NO DISCHARGE OF WASTEWATER FROM THIS OUTfALL TO WATERS OF TiiE STATE OF MISSOURI)

INTAKE HI:ATER BLOWDOWN MONITOMNG FINAL EFFLUENT UMITS P141UMETBR (VNITS) MEAS SA.MJ>LE IMILY WKLY MONTH FRE(l. TYPE MAX A fiE A fiE FLOW 24HR (MGD) WEBKLY(I)

  • TOTAL TSS (m&'l) WEEKLY(!)

GRAB 100 30 O&.G (m&'i) WEEKLY(!)

GRAB 20 15 pH(SU) WEEKLY (I) GRAB 60-9.0 60-9.0

  • MONITORING REQUIREMENT ONLY (I) SAMPLE WEEKLY WHEN DISCHARGE OCCURS ALl SAMPLES ANALYZED BY AMERENUE CALlAW .... Y PlANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER 10CSR20-7.015 STQRM WAJER RliNOf7 PQNDS STORM WATER RUNOfF IS MONITORED UNDER THE CALLAWAY STORM WATER POLLUTION PREVENTION PLAN COOLING JOW£8 BvPA§S MONlTOJtlNG FINAL EFFLUENT UMITS PARAMETER (UNITS) MBA$ s.4MPLE IMJLY WKLY MONTH YRE(l. TY'E MAX A fiE AJ1'! FLOW 24HR (MOD) QUARTERLY
  • -* EST. TSS (m&il) QUARTERLY GRAB 100 -30 O&G (m&il) QUARTCIU.Y GRAB 20 IS TRqlll&'l)

QUARTERLY GRAB 0.2 . 0.104 pH(SU) QUARTI!JU.V GRAB 6.0-9.0 6.0 *9.0 TEMPfOC) QUARTERLY GRAB *

  • QUARTERLY SAMPLES SHALL BE TAKEN DURJNG THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER.
  • MONITORlNG REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.01S ULTIMATI HEAT SINK File Cl70.0005 Page 4 of5 CA0320 02/04/11

.. AMEREN MISSOURI -CALLAWAY PLANT Page 5 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (APRIL 2012) ISSUE DATE 411412009 "I certify under penalty of law that this Qo<:ument and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Page 5 of5 APProved Plant Manager/PIN CA0320 02/04111 DATE 4 8 16 25 31 SOURCE 7 6 7 6 7 A MER EN MISSOURI -CALLAWAY PLANT NPDES MONITORING REPORT REPORTING PERIOD (MAY lOll) Page 1 of 5 PERMIT NO. M0-0098001 ISSUE DATE 4/14/2009 FLOW BOltON TSS pH (MOD) (m6fl) (mg!J) (SU} 0.089 37 4 8.55 0.091 76 4 7.78 0.092 1.9 5 8.84 0.075 0.5 4 8.85 0.087 3 4 8.85 OUTFALL# 001 RADWASTE SYSTEM PARAMETER MONITORING FINAL EFFLUENT UMITS (UNITS) MEAS SAMPLE DAILY WKLY MO TYPE MAX AJ-lS AJ-lS FLOW(MGD)

DAILY(EB)

TOTAl. * . . BORON (mg/1)

GRAB * .

  • TSS (m&fl) DAILY(EB)

GRAB 45 30 O&O(mWJ) MONTHI..Y GRAB 20 IS BODs(mgll)

MONTHLY GRAB * . pH(SU) DAILY(EB)

GRAB 6.0*9.1) 6.0*9.0 TRC (mg/1) MONTHLY GRAB 0.2 . 0104 TEMP (oC) (I) MONTHI..Y GRAB * *

  • MONITORING REQUIREMENT ONLY (EB) EACH BATCH (!)TEMPERATURE TOBE TAKEN AT TIME OF SAMPLE ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USTNG METHODS SPECIFIED UNDER IOCSR 20-7015 SOURCES = WASTE MONITOR TANK A
  • WASTE MONITOR T ANX B 3
  • SEC. LIQ. WASTE MONITOR TANK A 5 = SEC. UQ. WASTE MONITOR TANK B 6
  • LIQ. RADWASTE DISCHARGE TANK A 7
  • LIQ. RADWASTE DISCHARGE TANK B DATE Ot!cO (m&fi) BODs{mg/1)

TRC(m&'l) 514f2012 1.7 3 0.01 COMMENTS TEMP (*CJ 24 File C 170.0005 Page I of5 CA0320 02/04/11 DATE I 2 3 4 -5 6 7 8 9 10 II 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 now (MGD) 5.5 5.9 5.1 5.0 1.4 96 53 6.7 S.S S.8 4.8 5.8 SJ 2.4 B 5.7 4.8 4.4 4.2 4.5 4.7 5.7 s.s 6.1 7.2 7.2 68 6.0 5.9 AMEREN MISSOURI

  • CALLAWAY PLANT Page 2 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (MA \' 2012) ISSUE DATE 4/1412009 TRC TEMP (ltlf/1) ('Q <<O.OS 31 <<0.05 33 <0.05 32 <O.OS 33 <0.05 33 <0.05 33 <0.05 30 <0.05 28 <O.OS 26 <<0.05 27 <0.05 28 <O.OS 28 <O.OS 27 <<0 OS 27 <0.05 27 <0.05 27 <<0.05 27 <0.05 28 <0.05 3 I <0.05 31 <0.05 30 <0.05 27 <0.05 28 <0.05 28 <0.05 27 <0.05 28 <0.05 29 <0.05 29 <0.05 29 0.1 29 0.1 28 OUTFALL #002 COOLING TOWER BLOWDOWN Plll/AMETEit MONITORING FINAL EFFLUENT LIMITS (UNITS) MEAS SAMPLE DAILY WKLY MONTHLY FREQ Tl'PE MAX oii"E FLOW (t.-1{)0)

DAILY 24HR. * . TOTAL TSS (mg/1) WEEKLY GRAB * .

  • TDS WEEKLY GRAB . -. O&G(mg/1)

QUARTERLY GRAB 20 IS TRC(mJ!l)

DAII.Y GRAB 02 0.104 pH(SU) CONTrNUOUS 24HR 6.0*9.0 60-9.0 RECOitDSD TEMP (*C) 111 DAILY GRAB *

  • QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MA \',AUGUST, AND NOVEMBER.

(1) TEMPERATURE TO BE TAKEN AT TIME OF SAMPLE

  • MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CAlLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.01S DATE TSS TDS O&G (1116f/) (mg/1) (lltflll) 5/4/2012 <50 51712012 36 1632 5/l4/2012 33 1588 512112012 36 2444 512812012 36 2256 COMMENTS NO pH EXCURSfONS OCCURRED THIS MONTH File C170.0005 Page 2 of 5 CA0320 02/04/11 AMEREN MISSOURI -CALLAWAY PLANT Page 3 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (MAY 2012) ISSUE DATE 4/1412009 OUTFALL IIOOJ DATE FLOW (MGD) NO DISCHARGE COMMENTS NOTE THAT THE DISCHARGE FROM THE CONVERTED I WETI..AND AND THE FLOWS REPORTED HEREIN ARE ! NOT DISCHARGED, AS THIS OUTFALL {11003) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TRf.A TMENT AND REUSE. DATE FLOW OUTFALL N004 (INCLUDED UNDER OUTFALL11003)

OUTfALL 11007 aoo, 1 rss pH NHJ FC NO DISCHARGE COMMENTS O&G NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HEREIN ARE NOT DISCHARGED, AS THIS OUTFALL {1007) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE WATER TREATMENT PLANT MONITORJNG FINAL EFFLUENT LIMITS PARAMETER lM/Lr Wl(LY MONTH MEAS SAMPLE (UNITS) FltEQ. TYPE MAX AYE A.YE FLOW WEEKLY 24 HI!. . . !MGDJ TOTAL TSS (mr/1) MONT!il.Y GRAB 100 30 O&G (mgll) MONTiii..Y GRAB 20 -IS TRC (mg/1) MONT!il.Y GRAB 02 0.104 pH(SUl MONTHLY GRAB 6.0. 9.0 -6.0-9.0

  • MONITORING REQUlREMENT ONLY ALL SAMPlES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LA BORA TORY USING METHODS SPECIFIED UNDER I OCSR 20-7 0 I 5 DATE TSS 06.G TRC !1!n (11111111 (mR/1) _{lllgiJl_

-DEMINERALIZER SYSTEM SANITARY WASTE MONTTOIUNG FINAL EFFLUENT UM/'1$ PARAMETER DAILY JVK/.f MON77J (VNJT$) MILfS SAMI'LE FREQ,. TYPE MltX AYE AJ'E FLOW QUARTERLY 24HR * * (MOD) -EST. BOD,(mWJ)

QUARTERLY GRAB 65 45 TSS(mgll)

QUARTERLY GRAB liO 70 pH (SU) QUARTERLY GRAB 6.0 *9.0 -6.0 *9.0 NH3asN QUARTERLY GRAB * -* {tll&ll) FECAL COLIFORM QUARTERLY GRAB * -* _iCts/100 m.!l O&G (mWJ) QUARTERLY GRAB 15 -10 QUARTERLY SAMPlES SHALL BET AJ<EN DURJNG THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER. (l)

  • MONITORING REQUIREMENT ONLY ALL SAMPLES ANAL VZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USINO MeTHODS SPECIFIED UNDER JOCSR 20*7.01S File Cl70.0005 Page 3 of5 CA0320 02/04111 AMEREN MISSOURI-CALLAWAY PLANT Page 4 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (MAY 1012) ISSUE DATE 4114/2009 OUTfALL 1100? DATE FLOW TSS BOD (MGDJ (MR/1) (mflll) NO DISCHARGE COMMENTS SYSTEM IS NOT IN OPERATION OUTfALL$ IIOJI
  • N015 (MONITORlNO REPORTS SHALL NOT BE SUMITTED THERE SHALL BE NO DISCHARGE OF FLOATING SOI.IDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.)

OUTfALl. IIQ!6 DATE FLOW TSS O&C pH TRC TEMP {!t!Jj/)) (MBJ) (IJfll/1) (slf) r.wJl (OCJ 512/12 2.2 20 7.91 <0.05 20 5/9112 <S COMMENTS OVIfALLH!7 (THERE SHALL BE NO DISCHARGE OF WASTEWATER FROM THIS OUTFALL TO WATERS OF THE STATE OF MISSOURI)

INTAKE HEATER BLOW DOWN MONTTOJUNG FINAL EFFLVENT UMITS PARAMETER (UNITS) MEAS SAMPLE DA.ILY WKLY MONTH FREQ. TYPE MAX AV.Z: AilE FLOW 24Hit * * (MOO) WEI!KLY(I)

TOTAL. . TSS (mi/1) WEEKLY(!)

GRAB 100 . 30 O&.G (mg/1) WEEKLY(!)

GRAB 20 . IS pH (SU) WEEKLY (I) GRAB 6.0-90 6.0 *9.0

  • MONITORING REQUIREMENT ONLY (I) SAMPLE WEEKLY WHEN DISCHARGE OCCURS ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERA TJONS LA BORA TORY USlNO METHODS SPECIFIED IJNDER IOCSR 20-7 0!5 STQRM W t\T£R RUNOFf PONDS STORM WATER RUNOFF IS MONITORED UNDER THE CALLAWAY STORM WATER POLI..UTION PREVENTION PLAN COOLING TOWER B'YPASS MONITORING FINAL EFFLUENT UMITS PARAMETER (UNITS) MEAS SA.MPU! DAILY WILY MONTH FRE{}, TYPE MAX AVE AilE FLOW 24 HJI. * (MGD) QUARTERLY
  • EST TSS {mg/1) QUARTERLY GRAB 100 30 O&.G (mg/1) QUARTERLY GRAB 10 15 TRC{mg/1)

QUARTERLY GRAB 0.2 . 0.104 pH(SU) QUARTEIU.Y GRAB 6.0-9.0 . 6.Q.I}.0 TEMP("C} QUARTERLY GRAB * .

  • QUARTERLY SAMPLES SHALL BET A.KEN DURING THE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER.
  • MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LA BORA TORY USING METHODS SPECIFIED IJNDER JOCSR 2D-1015 ULTIMATE HEAT SINK File Cl70.0005 Page 4 of5 CA0320 02/04/1 I r AMEREN MISSOURI -CALLAWAY PLANT NPDES MONITORING REPORT REPORTING PERIOD (MAY 2012) Page 5 of 5 j PERMIT NO. M0-0098001 I ISSUE OA TE 4/1412009 "I certify under penalty of law that this docurnent and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

a;)!J Preparer/PIN Reviewer/PIN Page 5 of 5 /t].p*&/ 6 5 tB Appr ed Plant Manager/PIN CA0320 02/04/ll DATE 5 12 19 26 SOURCE 6 7 6 7 AMEREN MISSOURI-CALLA WAY PLANT Page l of 5 FLOW (MGD) 0.090 0.077 0.084 0.086 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JUNE 2012) ISSUE DATE 4/1412009 BORON 1SS pH (mg/l) (IHifl) (S(J) 0.5 :J 8.&1 0.5 2 7.56 o.s 4 8.86 0.5 4 8.75 OUTFALL# 001 RADWASTE SYSTEM I' ABA METER MONITORING FINAL EFFLVENT UMITS (UNITS) MEAS SAMI'LE DAILY WKLY MO FBEO, TYI'E MAX AYE AYE FLOW(MGD)

DAILY(EB)

TOTAL * -* BORON (mrll) DAILY(ES)

GRAB . -* TSS(mwl} DAILY(EB)

GRAB 45 -JO O&.G<mwtl MONTHLY GRAB 20 -IS BOO,(m&fl)

MONTHLY GRAB * -* pH(SU) DAILY(EB)

GRAB 6.0-9.0 -6.0-9.0 TRC(mg/1}

MONTHLY GRAB 0.2 -0.104 TEMP (*C) (I) MONTHLY GRAB * -*

  • MONITORING REQUIREMENT ONLY (EB) EACH BATCH (!)TEMPERATURE TO BETAKEN ATTIMEOFSAMPLE ALL SAMPLES ANALYZED BY AMERENUE CAlLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 20-7.015 SOURCES I WASTEMONITORTANKA 2 = WASTE MONITOR TANK B 3 STEAMGENERATORBLOWOOWN 4 SEC. LIQ. WASTE MONITOR TANK A 5 = SEC.LIQ. WASTE MONITOR TANKB 6 UQ. RADWASTE DISCHARGE TANK A 7 a UQ. RADWASTE DISCHARGE TANK B DATE O&G (mgll) BODs(mg/l)

TRC(mg/1) 6/1212012 0 7 0.02 COMMENTS TEMP (*C) 2$ File Cl70.0005 Page 1 of5 CA0320 02/04/ll DATE l 2 3 4 5 6 1 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 2S 26 27 28 29 30 FLOW (MGD) 4.1 5.3 5.4 6.1 u 7.0 4.0 6.2 5.4 5.6 6.1 6.3 S.7 5.1 5.8 6.0 7.6 7.8 7.6 s.a 6.1 6.8 7.0 7.1 5.7 7.7 7.9 5.1 7.5 s.s AMEREN MISSOURI-CALLAWAY PLANT Page 2 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JUNE 2012) ISSUE DATE411412009 TRC TEMP ("C) <0.05 26 <0.05 28 <0.05 30 <0.05 32 <0.05 30 <O.OS 29 <1).05 3() <0.05 28 <0.05 27 <0.05 28 <0.05 28 <0.05 21 <0.05 27 . <0.05 28 <0.05 29 <0.05 30 <0.05 29 <0.05 29 <O.OS 30 <0.05 30 <0.05 29 <0.05 28 <0.05 29 <0.05 29 <0.05 30 <0.05 28 <0.05 29 <0.05 30 <0.05 32 <0.05 35 . OUTFALL #OQZ COOLING TOWER BLOWDOWN PtiR.4METEil MONITORING FINAL EFFLUENT UMITS (IJTVITS)

MI!AS SAMPLE DAILY WKLY MONTHI.Y FREQ. TYPE MAX AVE AVE fl0W(M00)

DAILY 24HR * .. TOTAL . TSS (mg/1) WEEKLY GRAB .. .

  • TOS{mW!) WEEKLY GRAB * . " O&.O(mg/1)

QUARTERLY GRAB 20 -IS TRC(mdl) DAILY ORAB 0.2 . 0.104 pH (SU) CONTINUOUS 24 HR. 6.0-9.0 6.0*9.0 RECORDED TEMP{-Q 111 DAILY GRAB * .

  • QUARTERLY SAMPLES SHALL BE TAKEN DURING 1liE MONTHS OF FEBRUARY, MAY, AUGUST, AND NOVEMBER. (I) TEMPERATURE TO BETAKEN AT TIME OF SAMPLE
  • MONITORING REQUIREMENT ONLY ALL SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR. 20-7.01 S DATE TS.S TDS o&G fiiiP/1) {111611) (m!lll) 614/2012 38 2S40 611112012 27 1257 6/1812012 54 2216 612512012 34 2104 COMMENTS NO pH EXCURSIONS OCCURRED THIS MON1ll File C170.0005 Page 2 of5 CA0320 02104111

REPORTING PERIOD (JUNE 2012) *----Page 3 of 5 PERMIT NO. M0-0098001 ISSUE DATE 4114!20QL.

___ ---...J OJJ'J'FALL 11003 DATE FLOW J_MGD) NO DISCHARGE COMMENTS NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HEREIN ARE NOT DISCHARGED, AS THIS OUTFALL (IIOO.l) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. DATE FLOW OUTfALL ti004 (INCWDED UNDER OUTFALl #003) OUTfALLtmiJ JOD I 7SS' I pH NHJ FC NO DISCHARGE co O.tG NOTE THAT THE DISCHARGE FROM THE CONVERTED WETLAND AND THE FLOWS REPORTED HEREIN ARE NOT DISCHARGED.

AS THIS OUTFALL (#007) IS RECYCLED TO THE HEAD OF THE WATER TREATMENT PLANT FOR FURTHER TREATMENT AND REUSE. WATER TREATMENT PLANT MONITORING FINAL EFFLUENT UM/TS I'ARAMET£11 DAlLY WKLY MONTH (UNITS} MEAS SAMfLE FREQ. TYPE MAX AI'E AYE FLOW WEEKLY 24HR * . * (MOD) TOTAl MONTHLY GRAB 100 . 30 o&G (mtfl) MONTHLY GRAB 20 . IS TRC(ma/1l MONTHLY GRAB 0.2 . 0.104 pR(SU) MONTHLY GRAS 6.0-9.0 . 6.0-9.0

  • MONITORING REQUIREMI:'NT ONL V ALL SAMPLES ANALVZID BY AMER&'NUE CALlAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECtF!ED UNDER IOCSR 20-7.015 DATE TSS O&.G TRC pH rmeiJ _(m6/1J JJJtflll) isUJ ORMINERALJUR SYSTEM SANITARY WASTE MONITORING FiNAL BFFLUENT UMITS PARAMETER DAILY WXLY MONTH (UNITS) MEtfS SAMfLE FltEfl. TYPE MAX AYE AJIE FLOW QUARTERLY 24HR * .. (MOD) EST.
  • BOO, {mgfl) QUAlUERLY GRAB -65 45 QUAll.TERLY GRAB . 110 70 pH (SU) QUARTERLY GRAB 6.0-9.0 6.0-9.0 NHlasN QUARTERLY GRAEI .. . * (m..Jt!l.

FECAL COUFORM QUARTERLY GRAB * .

  • CCtsfiOO ml} 0&.0 (mWJ) QUARTERLY GRAB IS . 10 QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS Of FEBRUARY.MAY.AUGUST.ANDNOVEMBER.(I)
  • MONITORING REQUIREMENT ONLY ALL SAMPLES 1\NALYZID BY AMERENUECAU.AWAV PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR20-7.01S File C170.0005 Page3 of5 CA0320 02/04/J I AMEREN MISSOURl*

CALLAWAY PLANT Page 4 of 5 NPDES MONITORING REPORT PERMIT NO. M0-0098001 REPORTING PERIOD (JUNE lOU) ISSUE DATE4/1412009 OUTfALL lim DATE FLOW BOD pH IMGD} fmlfll) fmw/IJ ism NO DISCHARGE COMMENTS SYSTEM IS NOT IN OPERATION OUTFAI.I,S NQIO-Ntll$ (MONITORING REPORTS SHALL NOT BE SUMmED. THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS.)

OUTFALL i#Ol6 f) AT£ FLOW TSS OI.G !slfn TRC TEMP fMGDJ f**IIJ (llfflll} (Nitlfl} t"CJ NO SAMPUNO ltEOUIRED FOR JUNE COMMENTS OUTfALL #017 (THERE SHALL BE NO DISCHARGE OF WASTEWATER FROM THIS OUTFALL TO WATERS OF THE STATE OF MISSOURI)

INTAKE IlEA TER SLOWDOWN MONITORING FINAL EFFLUENT UMITS PAIWIIETER DATI.Y WKLT MONTH (UNITS) MEIIS SAMPLE FREt}. TYPE MAX AJIE AYE FLOW 24HR * * (MOO) W££l(I.,Y(I)

TOTAL -. TSS(mw'J)

WEEKLY (I) GRAB 100 30 O&G(mW'I)

WEEKI..Y(l}

GRAB 20 . 15 pH(SU} WEPJCLY(I)

GRAB 6.0-9.0 -6.0-9.0

  • MONITORING REQUIREMENT ONLY (I) SAMPLE WEEKLY WHEN DISCHARGE OCCURS AU. SAMPLES ANALYZED BY AMERENUE CALLAWAY PLANT OPERATIONS LABORATORY USING METHODS SPECIFIED UNDER IOCSR 2().7.0 IS SIQRM WATER RUNQFF PQNDS STORM WATER RUNOFF IS MONITORED UNDER THE CALLAWAY STORM WATER POLLUTION PREVENTION PLAN COOLING TOWIR BYPASS MONITORING FINAL EFFLUENT LIMITS PARAMETER (UNJ13) MBA$ SAMPLE DATLY WKLY MONnl FRE(?. TYPE MAX AilE AYE FLOW 2411R * * (MOD) QUARTERLY EST. . TSS(mWJ) QUARTERLY GRAB 100 . 30 0&0 (mg/1) QUAiln:RLY GRAB 20 . IS TRC(tnw'J)

QUARTERLY GRAB 0.2 . 0.104 pH(SU) QUARTERLY GRAB 6.0-9.0 -6.0-9.0 TEMP("CJ QUARTERLY ORAB * .

  • QUARTERLY SAMPLES SHALL BE TAKEN DURING THE MONTHS OF FEBRUARY, MAY,AUCUST, AND NOVEMBER.
  • MONI'roRING REQUIREMENT ONLY AU. SAMPlES ANALYZED BY AMERENUE CALLA WAY PLANT OPERATIONS I.ABORA TORY USING METHODS SPECIFIED UNDER I OCSR 20-7.015 ULTIMATE HEAT SINK File Cl70.0005 Page4 ofS CA0320 02/04/1 I r l _____________ , --"-**---

AMEREN MISSOURI-CALLA WAY PLANT Page 5 of S NPDES MONITORING REPORT PERMIT NO. M0-009S001 REPORTING PERIOD {JUNE 2012) _____

__ .-l "I certify under penalty of Jaw that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure 'that qualified persolUlel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Reviewer/PIN Page 5 of5 Approved Plant Manager/PIN CA0320 02/04/11 bee: D. Maschler I File Ci 70.0005 (CA-460) JCP I GPG I SSW WQ3.1.2.1