IR 05000702/2008001

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 850702-0801
ML20137F276
Person / Time
Site: Byron, 05000702 Constellation icon.png
Issue date: 08/20/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20137F265 List:
References
50-454-85-30, NUDOCS 8508260183
Download: ML20137F276 (2)


Text

.-

,

.

i Appendix NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-454 As a result of the inspection conducted on July 2 through August 1, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified:

Technical Specification 6.8.1.a requires that written procedures shall be established, implemented, and maintained for procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 197 Appendix A to Regulatory Guide 1.33, Revision 2, February 1978 states, in part: " Instructions for....startup, shutdown and changing modes of opera-tion should be prepared....for the.... Emergency Core Cooling System".

Byron Operating Procedures BOP SI-17, " Placing the Refueling Water Storage Tank Heating Pump and Heater in Service" and 80P SI-18, " Removing the Refueling Water Storage Tank Heating Pump and Heater from Service,"

implement this requirement. BOP SI-18, Paragraph F.1 states: "Stopgthe RWST Heating Pump (SIO3P) if the RWST temperature is greater than 52 F."

Appendix A to Regulatory Guide 1.33, Revision 2, February 1978, requires that administrative procedures for " Bypass of Safety Functions" and

" Authorities and Responsibilities for Safe Operation and Shutdown" should be covered by written procedure Byron Administrative Procedure, BAP 300-22, " Conduct of Operations,"

implements this requirement. Paragraph C.2.4.b states: "The following shall be considered mandatory.... Interlocks and other safety equipment shall be properly maintained, tested at regular intervals, and kept in-service at all times." Paragraph C.4.3.c mandatorily requires that equipment shall not be operated in a manner to intentionally avoid the proper functioning of its protective equipmen B0P SI-17, Paragraph F.1 requires that the control switches for the RWST Heating Pump and Heater be verified or placed in AUTO to start the syste Contrary to the above: On June 16, 1985, whilein. Mode 2,theRWSTHeatiggPumpwasnot secured when RWST temperature was greater than 52 F.

l

. On June 16, 1985, while in Mode 1, the RWST Heating Pump was operated in manual mode with the high temperature trip defeated.

t l This is a Severity Level IV violation (Supplement I) (454/85030-01(DRP))

8508260183 850820 PDR ADOCK 05 % 4 G

. _ , - - - _ . - - . -._-- - __-_- _ _ _ - . _ _

_. . _ _ ..

'

I

.

-

.

l

- ,

Appendix 2 Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) corrective action

. taRen and the results achieved; (2) corrective action to.be taken to avoid further violation; and (3) the date when full compliance will be achieve Consideration may be given to extending your response time for good cause show AUG 201985 Dated g..harnick,ChiefVidauude Reactor Projects Branch 1

-, ns-- - . - - - - - - - - - , - - - - . - - , - . , - - , - - - - . - . , - - . .