Email - Subject: FW: 2009 Nov 23 - Containment Unfolded Graphics_Ir Mosaic.Pptx Attachments: 2009 Nov 23 - Containment Unfolded Graphics_Ir Mosaic.Pptx
ML102920179
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/24/2009
From: Lake L F
NRC/RGN-II
To: Carrion R P, Masters A D, Naus D J, George Thomas
NRC/RGN-II, Oak Ridge
References
FOIA/PA-2010-0116
Download: ML102920179 (3)


Text

Masters, Anthony~4 2 fI) ~From: Sent: To: Cc:

Subject:

Attachments:

Categories:

Lake, Louis Tuesday, November 24, 2009 9:23 AM Carrion, Robert; Thomas, George; Masters, Anthony; Dan naus Franke, Mark FW: 2009 Nov 23 -Containment Unfolded GraphicsIR Mosaic.pptx 2009 Nov 23 -Containment Unfolded GraphicsjIR Mosaic.pptx Perform Review FYI. Attached is a foldout showing NDT completed.

From: Souther, Martin [1]

Sent: Tuesday, November 24, 2009 8:06 AM To: Lake, Louis Cc: Fagan, Paul; Miller, Garry

Subject:

2009 Nov 23 -Containment Unfolded GraphicsIR Mosaic.pptx The attached file reflects the adjoining building IR scans that are now complete.

The IR scan data files were used to graphically represent the areas scanned.Martin E. Souther CR3 Containment Root Cause Team 240-1009 352-795-6486, ext. 1009 S>20 o f Containment "Unfolded" -Buttress 2 to 5 Updated Nov 2 3 rd (Mosaic IR Overlay scale is approximate)

Buttress #2 Buttress #3 Buttress #4 Buttress #5-.. .. .-EL 250'IR scans completed per PT-407T: Blue = no delaminatio U Actual IR scan output data: Blue = no delaminatioi Yellow= transition Red = delaminated Drawing scale is not exact Final locations of IR scans inside the buildings and associated scanning dimensions were reconciled with actual data sheets on Nov 23rd 2009 Containment "Unfolded" -Buttress 5 to 2 Updated Nov 2 3 rd 2009 Buttress #5 Buttress #6 Buttress #1 Buttress #2 I' 11 ~B C A 1B C A B C D E F G H I J K L M N 0-I ......IR scans completed per PT 407T: Blue = no delamination E Actual IR scan output data: Blue = no delamination Yellow= transition Red = delaminated Drawing scale is not exact 2 P Q R Fuel Transfer Bldg Roof @ EL 200' 4" 16'D E F G H I J K L M N 0 P Q R S T U V W X Y Z AA AB AC AD D E F G H I J K L M N 0 P Q R S T U V W X Y Z AA AB AC AD X 8' EL 182'38'X 12'-- EL 250'Pour 16----------

EL 240'Pour 15----------

EL 230'Pour 14-- EL 220'Pour 13-EL 210'Pour 12----------

EL 200'Pour 11--EL 190'Pour 10--EL 180'Pour 9----------

EL 170'Pour 8--EL 160'Pour 7-----------

EL 150'Pour 6----------

EL 140'Pour 5-----------

EL 130'Pour 4----------

EL 120'Pour 3-----------

EL 110'Pour 2-----------

EL 100'14' x 34'8'4' x 8'7'x 10'x 8'EL 160'4' x 26'10' x60'EL 143'Intermediate Bldg Roof EL 149' 0" Intermediate Bldg Roof EL 149' 0" 20'X 9' 12'x 9'EL 119'11' x 7'EL 95'20' x12'EL 119'12' x12'EL 95'Pour 1-- EL 90'I Progress Energy W Final locations of IR scans inside the buildings and associated scanning dimensions were reconciled with actual data sheets on Nov 2 3 rd 2009