Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0515100172005-05-31031 May 2005 Draft RAI on Response to Generic Letter 2004-02 Project stage: Draft RAI ML0515303042005-06-0303 June 2005 6/3/05, Calvert Cliffs - RAI Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603803582006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0609500512006-04-12012 April 2006 Approval of Extension Request for Completion of Corrective Actions in Response to Generic Letter 2004-02 Project stage: Other ML0618702222006-06-30030 June 2006 Calvert Cliffs, Units 1 & 2 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Basis Accidents at Pressurized Water Reactors Project stage: Other ML0626405472006-09-20020 September 2006 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML0633407022006-12-18018 December 2006 Unit No.1 - Approval of Extension Request for Completion of Corrective Action in Response to Generic Letter 2004-02 Project stage: Other ML0712703722007-05-0202 May 2007 Calvert Cliffs Revision to Generic Letter 2004-02 Response Project stage: Other ML0734504992007-12-10010 December 2007 Attachment (1) Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0734504982007-12-10010 December 2007 Request for Extension for Completion of Activities Related to Generic Letter 2004-02 Project stage: Request ML0811307392008-04-22022 April 2008 Revision to Generic Letter 2004-02 Response Project stage: Other ML0817101052008-06-18018 June 2008 Attachment 1, Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0827404972008-09-30030 September 2008 Calvert Cliffs Nuclear Plant, Attachment 2, ECCS and CS System Figures Project stage: Other ML0827404892008-09-30030 September 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Supplement ML0833003202008-12-0404 December 2008 Request for Additional Information Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors-Calvert Cliffs Unit 1 & 2 Project stage: RAI ML0906807672009-03-0404 March 2009 Request for Additional Information: Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement ML1009500782010-04-12012 April 2010 Request for Additional Information Generic Letter 2004-02 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2-(TAC Nos. MC4672 and MC4673) Project stage: RAI ML1011903842010-05-0606 May 2010 Notice of Forthcoming Conference Call with Calvert Cliffs to Discuss Supplemental Responses to Generic Ltr. 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Request ML1014708982010-06-0707 June 2010 Summary of Meeting with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss Supplement to Responses to Generic Letter 2004-02 Project stage: Meeting ML1028701002010-09-30030 September 2010 Catawba Units 1 & 2, Draft Responses to NRC Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents on Pressurized-Water.... Project stage: Request ML1029306502010-10-20020 October 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC Regarding McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2, Project stage: Other ML1030810242010-11-10010 November 2010 Summary of November 1, 2010, Meeting with Duke to Discuss Responses to Generic Letter (GL) 2004-02 (Tac Nos. MC4673, MC4674, MC4692, and MC4693) Project stage: Meeting ML1031903612010-11-10010 November 2010 Response to Request for Additional Information Regarding Generic Letter 2004-02 (TAC Nos. MC4672 and MC4673) Project stage: Response to RAI ML13086A5512013-01-24024 January 2013 MC4672 & MC4673 - CCNPP-CHLE-003, Rev 0c Chemical Effects Pirt Considerations Excerpts with Respect to GL2004-02, GSI-191 Project stage: Other ML13038A5432013-01-24024 January 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant (CCNPP-CHLE-002, Revision 0d) Project stage: Request ML13050A5112013-02-19019 February 2013 MC4672-3 Corrected Notice -Public Meeting on March 20, 2013 Re-GL2004-02 Project stage: Request ML13045A1822013-02-19019 February 2013 March 20, 2013, Notice of Forthcoming Teleconference with Calvert Cliffs and Nrc/Nrr Staff to Have Additional Discussions of Licensees'S Proposed Path for Resolution of Generic Letter 2004-02 Project stage: Meeting ML13086A5502013-03-0101 March 2013 MC4672 & MC4673, CCNPP-CHLE-002, Rev 0e Chemical Effects Experimental Protocol with Respect to GL2004-02, GSI-191. Project stage: Request ML13088A2202013-03-18018 March 2013 MC4672 & MC4673 - CCNPP-CHLE-005, Rev 1 Chemical Effects Autoclave Experimental Plan with Respect to GL2004-02, GSI-1 91 Project stage: Request ML13086A5492013-03-20020 March 2013 MC4672 & MC4673 - Licensee Presentation-Category 1, Public Meeting on March 20, 2013 with Respect to GL2004-02, GSI-191 Project stage: Meeting ML13091A0552013-04-10010 April 2013 Summary of Meeting on March 20, 2013, with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation D Project stage: Meeting ML13149A3942013-05-20020 May 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-002, Revision 0 May 20, 2013 Project stage: Request ML13149A3992013-05-20020 May 2013 Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant CCNPP-CHLE-005, Revision 2, May 20, 2013 Project stage: Request ML13149A4052013-05-23023 May 2013 Metals BENCH-TOP Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-006, Revision 0, May 23, 2013 Project stage: Request ML13148A3962013-05-29029 May 2013 Forthcoming Meeting with Calvert Cliffs Nuclear Power Plant, LLC to Discuss Licensee'S Proposed Plan for Resolution of GL 2004-02 Project stage: Meeting ML13179A3132013-07-11011 July 2013 June 12, 2013 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculati Project stage: Meeting ML13224A0942013-08-0606 August 2013 Chemical Effects Pirt Considerations for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-003, Revision 0c Project stage: Request ML13224A1032013-08-0808 August 2013 CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. Project stage: Request ML13226A0902013-08-14014 August 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC Project stage: Meeting ML13304B4032013-11-0101 November 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC, Project stage: Meeting ML13319A9392013-11-13013 November 2013 Ri GSI-191 November 2013 Meeting with NRC Rev 0 Project stage: Request ML13310B9292013-12-0606 December 2013 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During ... Project stage: Meeting ML14014A0392014-01-29029 January 2014 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During.. Project stage: Meeting ML14206B0012014-02-14014 February 2014 Long-Term Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNP-CHLE-011, Revision 2 Project stage: Request ML14142A3232014-05-22022 May 2014 NRR E-mail Capture - Calvert Cliffs May 21, 2014 Public Meeting Presentation Project stage: Request ML14206A9932014-07-25025 July 2014 Conrete Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNPP-CHLE-010, Revision 1 Project stage: Request ML14206B1442014-11-0606 November 2014 May 21, 2014 Summary of Meeting with Exelon Generation Company, LLC, to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02 Project stage: Meeting ML14206A2062014-11-0707 November 2014 July 2, 2014 Summary of Meeting with Exelon Generation Company, LLC to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02 Project stage: Meeting ML15154B5572015-06-17017 June 2015 May 19, 2015 Summary of Meeting with Exelon Generation Company, LLC, on Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Chemical Effects Testing for Resolution of Generic Letter 2004-02 (TAC Nos. MC4672 & MC4673) Project stage: Meeting ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach Project stage: Request 2013-11-01
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) ML22124A1482022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update ML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16242A1782016-09-0101 September 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16198A0012016-07-18018 July 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L ML14230A9112014-08-18018 August 2014 Enclosure - Example AMP - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 ML14230A9102014-08-18018 August 2014 Enclosure - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 ML14230A9092014-08-18018 August 2014 Enclosure - Generic Concrete AMP CC ISFSI - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 ML14230A9082014-08-18018 August 2014 Enclosure - Elements of an AMP CC ISFSI - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 2024-01-30
[Table view] |
Text
CalvertCliffsCalvert CliffsChemical Effects in k fd Ris k-In f orme d GSI-191ResolutionResolution SihDiiWihNRCSff Si xt h Di scuss i on Wi t h NRC S ta ffNovember 13, 2013 AgendaIntroductions ObjectivesforMeetingObjectives for MeetingDiscuss Preliminary Autoclave Test ResultsDiscussion of Chemical Effects PIRT Items Discussion of Alkyds Autoclave Test PlanDiscussion of Integrated Chemical Effects Testing Topics
-Zinc and Marinite Debris
-Chemical Effects Head Loss Loop DesignDiscussionofSmall
-ScaleDebrisBypass/PenetrationTestPlan Discussion of SmallScale Debris Bypass/Penetration Test PlanSchedule for future periodic meetings CCNPP AttendeesTom Konerth -Supervisor Mechanical DesignKenGreeneLicensingEngineerKen Greene -Licensing EngineerJohn Swailes -Project Manager GSI-191CraiSellersProjetManaerRIGSI 191Crai g Sellers -Proje c t Mana g er RI GSI-191Steve Kinsey -Chemical Effects TestingJhWChilEffTiJ os h Wargo -Ch em i ca l Eff ects Test i ngJon Cavallo -Coatings Consultant Objectives of MeetingDiscuss Preliminary Autoclave Test ResultsContinue to Work Towards Agreement on Chemical Effects PIRTI CCNPP CHLE 003PIRT I ssues -CCNPP-CHLE-003Review & Work Towards Agreement on Chemical Effects Testing TopicsAlkdAlTPl CCNPP CHLE 007-Alk y d Autoc lave Test Pl an -CCNPP-CHLE-007-Considerations for Zinc -CCNPP-CHLE-008
-Considerations for Marinite -CCNPP-CHLE-009IntegratedChemicalEffectsHeadLossLoopDesign
-Integrated Chemical Effects Head Loss Loop DesignReview & Work Towards Agreement on Small-Scale Strainer Bypass Test Plan -CCNPP-BPPlan-002PresentProposedScheduleforFutureMeetingsPresent Proposed Schedule for Future MeetingsCapture Staff Issues and Concerns Preliminary Autoclave Test ResultsCCNPP-CHLE-006 -Metals
-Insignificant Concentrations
-Very High Ca Concentration
- Influenced Revised MariniteScaling Methodology
-Very High Zn Concentration
- Pure Zinc >> Galvanized Steel
- Influenced Revised Zinc Modeling Methodology
-Preliminary Data Insufficient for Additional InsightsCCNPP-CHLE-005-HighTemperature CCNPP CHLE 005 High Temperature
-No Results to Date Chemical Effects PIRT IssuesPIRT Item 2.5 Additional Debris Bed Chemical Reactions
-Fiberglass & Metals Insensitive
-Irradiation is not expected to have a chemical effects impact on coatingsPIRT Item 3.9 Concrete Material Aging
-Using concrete from Original Plant Construction
-All Original Concrete Made On-Site with Same MaterialsPIRT Item 6.4 Coatin gs Dissolution and Leachin g gg-Epoxy Coatings Not Sensitive
-Zinc Coatings Used in Tests
-AlkydCoatingstobeaddressedinAutoclaveTestAlkyd Coatings to be addressed in Autoclave TestOthers Alkyds Autoclave Test Plan -CCNPP-CHLE-007Investigate Chemical Effects from Alkyd Coatings
-Apply Alkyd Coatings to SS Coupons
-Include LOCA Debris and Exposed Reactive Materials
-Submerge in Borated Water
-DissolveBufferat195
°FDissolve Buffer at 195 F-Expose to LOCA Temperature Profile for 7 Days
-Vacuum Filtration for Head Loss Implicationslfb/-Visua l Examination f or De b ris / Precipitates
-Chemical Analysis for Potential Precipitants & OrganicsSection-by Section Review Zinc Considerations -CCNPP-CHLE-008Failed Inorganic Zinc Coatings Historically Treated as 10 µm S pheres for H ydraulic CharacteristicsµpyModeling as such in Chemical Effects Testing Results in Very Large Surface Area of Surrogate MaterialCalvert Cliffs Proposed Approach
-IOZ in ZOI and Unqualified Zinc-Rich Coatings Tested using SmoothZincPlateSurrogatewithSameSurfaceAreaas10 Smooth Zinc Plate Surrogate with Same Surface Area as 10 µm Spheres
-Degraded Qualified IOZ Tested using Cured/Aged IOZ CoatedCoponsith2SrfaceAreaofDegradedCoated Co u pons w ith 2 x S urface Area of Degraded Coatings Marinite Considerations -CCNPP-CHLE-009Marinite Fines Debris Historically Treated as 10 µm SpheresforHydraulicCharacteristicsSpheres for Hydraulic CharacteristicsModeling as such in Chemical Effects Testing Results in V e r y L a r ge Su rf ace Ar ea o f So li d M a rini teeyageSuaceeaoSodateCalvert Cliffs Proposed Approach
-Marinite Fine Debris Tested usin g 1/2" Thick Marinite Board gwith 25% of the Surface Area as 44 µm Spheres
-Marinite non-Fines Tested using 1/2" Thick Marinite Board ithPtltdSfASbdSd w ith P os t u l a t e d S ur f ace Area S u bmerge d or Spraye d Integrated Chemical Effects Head Loss Test LoopVertical Head Loss Column Primary Reaction Chamber(Showing Clearance for Coupons)Heat Exchanger Loop Initial Preparation ChamberLoop Heating & Cooling Small-Scale Bypass Test Plan-CCNPP-BPPlan-002Sensitivity TestsWaterChemistry
-Water Chemistry-Water Temperature
-Fiber MixtureRunFiber TypeWater ChemistryTemperature°°Prototypical Strainer
-Fabricated from Similar °°°°Perforated PlateContinuous Filtration°°°°Section-by Section Review Schedule for Future Periodic MeetingJanuary 2014
-ChemicalEffectsBench
-TopTestResultsChemical Effects BenchTop Test Results-Final Chemical Effects Screening Test Protocol