MONTHYEARML0515100172005-05-31031 May 2005
[Table View]Draft RAI on Response to Generic Letter 2004-02 Project stage: Draft RAI ML0515303042005-06-0303 June 2005 6/3/05, Calvert Cliffs - RAI Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603803582006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0609500512006-04-12012 April 2006 Approval of Extension Request for Completion of Corrective Actions in Response to Generic Letter 2004-02 Project stage: Other ML0618702222006-06-30030 June 2006 Calvert Cliffs, Units 1 & 2 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Basis Accidents at Pressurized Water Reactors Project stage: Other ML0626405472006-09-20020 September 2006 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML0633407022006-12-18018 December 2006 Unit No.1 - Approval of Extension Request for Completion of Corrective Action in Response to Generic Letter 2004-02 Project stage: Other ML0712703722007-05-0202 May 2007 Calvert Cliffs Revision to Generic Letter 2004-02 Response Project stage: Other ML0734504992007-12-10010 December 2007 Attachment (1) Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0734504982007-12-10010 December 2007 Request for Extension for Completion of Activities Related to Generic Letter 2004-02 Project stage: Request ML0811307392008-04-22022 April 2008 Revision to Generic Letter 2004-02 Response Project stage: Other ML0817101052008-06-18018 June 2008 Attachment 1, Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0827404972008-09-30030 September 2008 Calvert Cliffs Nuclear Plant, Attachment 2, ECCS and CS System Figures Project stage: Other ML0827404892008-09-30030 September 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Supplement ML0833003202008-12-0404 December 2008 Request for Additional Information Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors-Calvert Cliffs Unit 1 & 2 Project stage: RAI ML0906807672009-03-0404 March 2009 Request for Additional Information: Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement ML1009500782010-04-12012 April 2010 Request for Additional Information Generic Letter 2004-02 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2-(TAC Nos. MC4672 and MC4673) Project stage: RAI ML1011903842010-05-0606 May 2010 Notice of Forthcoming Conference Call with Calvert Cliffs to Discuss Supplemental Responses to Generic Ltr. 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Request ML1014708982010-06-0707 June 2010 Summary of Meeting with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss Supplement to Responses to Generic Letter 2004-02 Project stage: Meeting ML1028701002010-09-30030 September 2010 Catawba Units 1 & 2, Draft Responses to NRC Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents on Pressurized-Water.... Project stage: Request ML1029306502010-10-20020 October 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC Regarding McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2, Project stage: Other ML1030810242010-11-10010 November 2010 Summary of November 1, 2010, Meeting with Duke to Discuss Responses to Generic Letter (GL) 2004-02 (Tac Nos. MC4673, MC4674, MC4692, and MC4693) Project stage: Meeting ML1031903612010-11-10010 November 2010 Response to Request for Additional Information Regarding Generic Letter 2004-02 (TAC Nos. MC4672 and MC4673) Project stage: Response to RAI ML13086A5512013-01-24024 January 2013 MC4672 & MC4673 - CCNPP-CHLE-003, Rev 0c Chemical Effects Pirt Considerations Excerpts with Respect to GL2004-02, GSI-191 Project stage: Other ML13038A5432013-01-24024 January 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant (CCNPP-CHLE-002, Revision 0d) Project stage: Request ML13050A5112013-02-19019 February 2013 MC4672-3 Corrected Notice -Public Meeting on March 20, 2013 Re-GL2004-02 Project stage: Request ML13045A1822013-02-19019 February 2013 March 20, 2013, Notice of Forthcoming Teleconference with Calvert Cliffs and Nrc/Nrr Staff to Have Additional Discussions of Licensees'S Proposed Path for Resolution of Generic Letter 2004-02 Project stage: Meeting ML13086A5502013-03-0101 March 2013 MC4672 & MC4673, CCNPP-CHLE-002, Rev 0e Chemical Effects Experimental Protocol with Respect to GL2004-02, GSI-191. Project stage: Request ML13088A2202013-03-18018 March 2013 MC4672 & MC4673 - CCNPP-CHLE-005, Rev 1 Chemical Effects Autoclave Experimental Plan with Respect to GL2004-02, GSI-1 91 Project stage: Request ML13086A5492013-03-20020 March 2013 MC4672 & MC4673 - Licensee Presentation-Category 1, Public Meeting on March 20, 2013 with Respect to GL2004-02, GSI-191 Project stage: Meeting ML13091A0552013-04-10010 April 2013 Summary of Meeting on March 20, 2013, with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation D Project stage: Meeting ML13149A3942013-05-20020 May 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-002, Revision 0 May 20, 2013 Project stage: Request ML13149A3992013-05-20020 May 2013 Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant CCNPP-CHLE-005, Revision 2, May 20, 2013 Project stage: Request ML13149A4052013-05-23023 May 2013 Metals BENCH-TOP Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-006, Revision 0, May 23, 2013 Project stage: Request ML13148A3962013-05-29029 May 2013 Forthcoming Meeting with Calvert Cliffs Nuclear Power Plant, LLC to Discuss Licensee'S Proposed Plan for Resolution of GL 2004-02 Project stage: Meeting ML13179A3132013-07-11011 July 2013 June 12, 2013 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculati Project stage: Meeting ML13224A0942013-08-0606 August 2013 Chemical Effects Pirt Considerations for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-003, Revision 0c Project stage: Request ML13224A1032013-08-0808 August 2013 CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. Project stage: Request ML13226A0902013-08-14014 August 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC Project stage: Meeting ML13304B4032013-11-0101 November 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC, Project stage: Meeting ML13319A9392013-11-13013 November 2013 Ri GSI-191 November 2013 Meeting with NRC Rev 0 Project stage: Request ML13310B9292013-12-0606 December 2013 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During ... Project stage: Meeting ML14014A0392014-01-29029 January 2014 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During.. Project stage: Meeting ML14206B0012014-02-14014 February 2014 Long-Term Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNP-CHLE-011, Revision 2 Project stage: Request ML14142A3232014-05-22022 May 2014 NRR E-mail Capture - Calvert Cliffs May 21, 2014 Public Meeting Presentation Project stage: Request ML14206A9932014-07-25025 July 2014 Conrete Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNPP-CHLE-010, Revision 1 Project stage: Request ML14206B1442014-11-0606 November 2014 May 21, 2014 Summary of Meeting with Exelon Generation Company, LLC, to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02 Project stage: Meeting ML14206A2062014-11-0707 November 2014 July 2, 2014 Summary of Meeting with Exelon Generation Company, LLC to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02 Project stage: Meeting ML15154B5572015-06-17017 June 2015 May 19, 2015 Summary of Meeting with Exelon Generation Company, LLC, on Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Chemical Effects Testing for Resolution of Generic Letter 2004-02 (TAC Nos. MC4672 & MC4673) Project stage: Meeting ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach Project stage: Request 2013-11-01 |
ML082740497 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs ![]() |
Issue date: | 09/30/2008 |
From: | Calvert Cliffs, Constellation Energy Group, Nuclear Generation Group |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML082740493 | List: |
References | |
GL-04-002, TAC MC4672, TAC MC4673 | |
Download: ML082740497 (3) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Report
MONTHYEARML23055A2842023-02-24024 February 2023
[Table view]Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits ML22178A1722022-06-27027 June 2022 Long Term Coupon Surveillance Program ML22147A1782022-05-27027 May 2022 Owner'S Activity Report (Form OAR-1) for the Calvert Cliffs Nuclear Power Plant Unit 1 Spring 2022 Refueling Outage ML21263A1862021-09-20020 September 2021 Proposed Alternative Concerning Pressure Testing of ASME Section XI Class 2 Portions of the Auxiliary Feedwater System RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21210A3252021-07-30030 July 2021 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld2021-05-12012 May 2021 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld ML21077A1802021-03-18018 March 2021 10 CFR 50.46 Annual Report and 30-day Report for Framatome'S Protect Enhanced Accident Tolerant Fuel (Eatf) Lead Test Assembly (LTA) ML21013A5302021-01-13013 January 2021 Reactor Vessel Level Monitoring System Special Report RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20280A5082020-10-0606 October 2020 Submittal of Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20034E3462020-02-0707 February 2020 Review of the Spring 2019 Steam Generator Tube Inspection Report ML19347A7792019-12-12012 December 2019 License Amendment Request to Utilize Accident Tolerant Fuel Lead Test Assemblies ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML19072A0962019-03-11011 March 2019 Information Regarding Dissimilar Metal Weld 2-CV-2005-30 Flaw Characteristic and Repair Weld Overlay ML17324B3692017-12-20020 December 2017 Flood Hazard Mitigation Strategies Assessment RS-16-181, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-11-0909 November 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16061A0162016-02-26026 February 2016 ISFSI - Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72-48 ML16057A0022016-02-25025 February 2016 Report Concerning Dissimilar Metal Weld Flaw in Pressurizer Safety Relief Nozzle-to-Safe-End Weld ML16076A3522016-02-24024 February 2016 Plants, Units 1 and 2 - E-mail Re. Draft Report Concerning Dissimilar Metal Weld Indication on Pressurizer Safety Relief Nozzel to Safe End Weld ML15350A1082016-01-19019 January 2016 Review of the 2015 Steam Generator Tube Inspections ML15281A2182015-10-21021 October 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation RS-15-095, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-04-30030 April 2015 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML15077A1032015-04-16016 April 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15075A3392015-03-10010 March 2015 NUH32PHB-0101, Revision 4, Design Criteria Document (DCD) for the Nuhoms 32PHB System for Storage ML15062A0432015-02-27027 February 2015 Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 ML15042A1372015-02-0303 February 2015 Gesc, NAC International, Atlanta Corporate Headquarters, 655 Engineering Drive, Norcross, Georgia (Engineering Report #NS3-020, Effects of 1300F on Unfilled NS-3, While Bisco Products, Inc., 11/84), Enclosure 4 L-14-036, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-17017 December 2014 Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14212A3072014-07-25025 July 2014 NUH32PHB.0101, Rev. 2, Design Criteria Document (DCD) for Nuhoms 32PHB System for Storage. ML14212A3082014-07-25025 July 2014 NUH32PHB-011, Rev 3, Design Report for 32PHB Dsc. ML14170B0222014-06-26026 June 2014 Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Accident ML14206B0072014-05-19019 May 2014 Considerations for Using Marinite in Refined GSI-191 Chemical Effects Testing. CCNPP-CHLE-009, Revision 4 ML14206B0092014-05-12012 May 2014 Considerations for Using Zinc in Refined GSI-191 Chemical Effects Testing. CCNPP-CHLE-008, Revision 4 ML14099A1962014-03-31031 March 2014 Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML13225A5662013-12-17017 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049(Mitigation Strategies) ML13338A6462013-12-0909 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, TAC Nos.: MF1142 and MF1143 ML13319B0802013-11-14014 November 2013 Proposed 10 CFR 50.55a Request for Repair of Saltwater Piping Leak (RR-ISI-04-09) ML13319A9322013-11-11011 November 2013 CCNPP-BPPlan-002, Rev 0E, Small Scale Debris Bypass-Penetration Test Plan for Calvert Cliffs Nuclear Power Plant. ML13319A6792013-10-31031 October 2013 CCNPP-CHLE-007, Appendix 1, Alkyd Coatings in Refined GSI-191 Chemical Effects Testing. ML13319A6702013-10-18018 October 2013 CCNPP-CHLE-007, Rev. G, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. ML13319A6212013-10-0404 October 2013 CCNPP-CHLE-003, Rev. 0d Chemical Effects Pirt Considerations for Calvert Cliffs Nuclear Power Plant. ML13301A6742013-09-24024 September 2013 Enclosure 1 - Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML13224A1032013-08-0808 August 2013 CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. ML13224A0942013-08-0606 August 2013 Chemical Effects Pirt Considerations for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-003, Revision 0c ML13149A4052013-05-23023 May 2013 Metals BENCH-TOP Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-006, Revision 0, May 23, 2013 ML13149A3992013-05-20020 May 2013 Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant CCNPP-CHLE-005, Revision 2, May 20, 2013 2023-02-24 Category:Miscellaneous MONTHYEARML21263A1862021-09-20020 September 2021
[Table view]Proposed Alternative Concerning Pressure Testing of ASME Section XI Class 2 Portions of the Auxiliary Feedwater System ML21013A5302021-01-13013 January 2021 Reactor Vessel Level Monitoring System Special Report ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML17324B3692017-12-20020 December 2017 Flood Hazard Mitigation Strategies Assessment RS-16-181, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-11-0909 November 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16061A0162016-02-26026 February 2016 ISFSI - Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72-48 ML16057A0022016-02-25025 February 2016 Report Concerning Dissimilar Metal Weld Flaw in Pressurizer Safety Relief Nozzle-to-Safe-End Weld ML16076A3522016-02-24024 February 2016 Plants, Units 1 and 2 - E-mail Re. Draft Report Concerning Dissimilar Metal Weld Indication on Pressurizer Safety Relief Nozzel to Safe End Weld ML15350A1082016-01-19019 January 2016 Review of the 2015 Steam Generator Tube Inspections ML15281A2182015-10-21021 October 2015 Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation RS-15-095, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-04-30030 April 2015 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML15062A0432015-02-27027 February 2015 Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 L-14-036, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-17017 December 2014 Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14170B0222014-06-26026 June 2014 Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Accident ML14206B0092014-05-12012 May 2014 Considerations for Using Zinc in Refined GSI-191 Chemical Effects Testing. CCNPP-CHLE-008, Revision 4 ML14099A1962014-03-31031 March 2014 Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. ML13225A5662013-12-17017 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049(Mitigation Strategies) ML13224A1032013-08-0808 August 2013 CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. ML13078A0102013-03-12012 March 2013 Flood Hazard Reevaluation Report ML13066A1712013-02-28028 February 2013 R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events ML12055A0482012-02-22022 February 2012 Independent Spent Fuel Storage Installation, Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 ML12027A0122012-01-24024 January 2012 Core Operating Limits Report for Unit 1, Cycle 20 ML1109400392011-03-31031 March 2011 10 CFR 50.46 30-day Report for Changes to the Emergency Core Cooling System Performance Analysis ML1024302022010-08-27027 August 2010 Reactor Vessel Water Level Monitoring System Special Report ML0935205402009-11-25025 November 2009 Submittal of Updated List of Facility Emission Inventory Registration ML0911901582009-04-24024 April 2009 Post-Accident Monitoring Report ML12220A1012008-11-24024 November 2008 Constellation Energy Group, Inc. Definitive Proxy Statement Schedule 14A ML0827602832008-10-0101 October 2008 Attachments 1 & 2, Calvert Cliffs Nuclear Power Plant Inc., Proposed Alternative ISI-020, and Proposed Alternative ISI-021 ML0827404972008-09-30030 September 2008 Calvert Cliffs Nuclear Plant, Attachment 2, ECCS and CS System Figures ML0827404952008-09-30030 September 2008 Calvert Cliffs Nuclear Plant, Attachment 1, Supplemental Response to Generic Letter 2004-02 ML0807402272008-03-12012 March 2008 Response to Request for Additional Information Control Room Habitability ML0805004452008-02-14014 February 2008 Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 ML0709305152007-03-27027 March 2007 Core Operating Limits Report for Unit 2, Cycle 17, Revision 0 ML0703201272007-01-30030 January 2007 Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds ML0625600382006-09-0707 September 2006 Special Report: Technical Specification 4.1, Appendix B, Unusual Fish Kill IR 05000317/20040082006-06-0101 June 2006 Final Precursor Analysis - Calvert Cliffs 2, LER 318/04-001-00; IR 05000317-04-008 and 05000318-04-008 - Excessive Steam Demand - Reactor Trip Due to Low Steam Generator Water Level After Feed Pump Trip ML0611101802006-04-21021 April 2006 Enclosure 1 - Report ORNL/NRC/LTR-05/22, Results of Probabilistic Fracture Mechanics Analyses of Pressurized Thermal Shock Transients for Calvert Cliffs Nuclear Power Plant Using Favor 04.1 ML0611704292006-04-11011 April 2006 Core Operating Limits Report for Unit 1, Cycle 18, Revision 2 ML0606100812006-02-27027 February 2006 2005 Steam Generator Tube Inspection Results Report ML0513701102005-05-12012 May 2005 Days After Plant Restart Report - First Revised NRC Order EA-03-009, Interim Inspection Requirement for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0421501542004-07-28028 July 2004 Special Report: Mortality of a Species Protected by the Endangered Species Act of 1973 ML0318909502003-07-10010 July 2003 Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-duty Enhancements for Nuclear Security Force Personnel for Calvert Cliffs, ML0313301332003-05-0707 May 2003 Emergency Response Data System ML0306202372003-02-26026 February 2003 Report of Changes, Tests, & Experiments - 10 CFR 50.59 ML0306202432003-02-21021 February 2003 Reactor Vessel Water Level Monitoring System Special Report ML0300805942003-01-0303 January 2003 Report of Changes, Tests, & Experiments - 10 CFR 50.59 ML0223203592002-08-13013 August 2002 Special Report Re National Pollution Discharge Elimination System Permit No. 99-DP-0187 Violation from Calvert Cliffs Units 1 & 2 ML0220001132002-07-15015 July 2002 Emergency Response Data System ML0215503102002-05-29029 May 2002 Submittal of Emergency Core Cooling System Codes and Methods Report 2021-09-20 |
Text
Calvert Cliffs Nuclear Power Plant, Inc.
September 30, 2008 ATTACHMENT (2)
Revision 37 FIGURE 6-1 SAFETY INJECTION AND CONTAINMENT SPRAY - UNIT 1
Revision 39 FIGURE 6-10 SAFETY INJECTION AND CONTAINMENT SPRAY - UNIT 2