Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0515100172005-05-31031 May 2005 Draft RAI on Response to Generic Letter 2004-02 Project stage: Draft RAI ML0515303042005-06-0303 June 2005 6/3/05, Calvert Cliffs - RAI Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors Project stage: RAI ML0603803582006-02-0909 February 2006 RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0609500512006-04-12012 April 2006 Approval of Extension Request for Completion of Corrective Actions in Response to Generic Letter 2004-02 Project stage: Other ML0618702222006-06-30030 June 2006 Calvert Cliffs, Units 1 & 2 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Basis Accidents at Pressurized Water Reactors Project stage: Other ML0626405472006-09-20020 September 2006 Update of Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML0633407022006-12-18018 December 2006 Unit No.1 - Approval of Extension Request for Completion of Corrective Action in Response to Generic Letter 2004-02 Project stage: Other ML0712703722007-05-0202 May 2007 Calvert Cliffs Revision to Generic Letter 2004-02 Response Project stage: Other ML0734504992007-12-10010 December 2007 Attachment (1) Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0734504982007-12-10010 December 2007 Request for Extension for Completion of Activities Related to Generic Letter 2004-02 Project stage: Request ML0811307392008-04-22022 April 2008 Revision to Generic Letter 2004-02 Response Project stage: Other ML0817101052008-06-18018 June 2008 Attachment 1, Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 Project stage: Request ML0827404972008-09-30030 September 2008 Calvert Cliffs Nuclear Plant, Attachment 2, ECCS and CS System Figures Project stage: Other ML0827404892008-09-30030 September 2008 Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. Project stage: Supplement ML0833003202008-12-0404 December 2008 Request for Additional Information Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors-Calvert Cliffs Unit 1 & 2 Project stage: RAI ML0906807672009-03-0404 March 2009 Request for Additional Information: Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Supplement ML1009500782010-04-12012 April 2010 Request for Additional Information Generic Letter 2004-02 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2-(TAC Nos. MC4672 and MC4673) Project stage: RAI ML1011903842010-05-0606 May 2010 Notice of Forthcoming Conference Call with Calvert Cliffs to Discuss Supplemental Responses to Generic Ltr. 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Request ML1014708982010-06-0707 June 2010 Summary of Meeting with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss Supplement to Responses to Generic Letter 2004-02 Project stage: Meeting ML1028701002010-09-30030 September 2010 Catawba Units 1 & 2, Draft Responses to NRC Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents on Pressurized-Water.... Project stage: Request ML1029306502010-10-20020 October 2010 Notice of Forthcoming Conference Call with Duke Energy Carolinas, LLC Regarding McGuire Nuclear Station, Units 1 and 2 and Catawba Nuclear Station, Units 1 and 2, Project stage: Other ML1030810242010-11-10010 November 2010 Summary of November 1, 2010, Meeting with Duke to Discuss Responses to Generic Letter (GL) 2004-02 (Tac Nos. MC4673, MC4674, MC4692, and MC4693) Project stage: Meeting ML1031903612010-11-10010 November 2010 Response to Request for Additional Information Regarding Generic Letter 2004-02 (TAC Nos. MC4672 and MC4673) Project stage: Response to RAI ML13086A5512013-01-24024 January 2013 MC4672 & MC4673 - CCNPP-CHLE-003, Rev 0c Chemical Effects Pirt Considerations Excerpts with Respect to GL2004-02, GSI-191 Project stage: Other ML13038A5432013-01-24024 January 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant (CCNPP-CHLE-002, Revision 0d) Project stage: Request ML13050A5112013-02-19019 February 2013 MC4672-3 Corrected Notice -Public Meeting on March 20, 2013 Re-GL2004-02 Project stage: Request ML13045A1822013-02-19019 February 2013 March 20, 2013, Notice of Forthcoming Teleconference with Calvert Cliffs and Nrc/Nrr Staff to Have Additional Discussions of Licensees'S Proposed Path for Resolution of Generic Letter 2004-02 Project stage: Meeting ML13086A5502013-03-0101 March 2013 MC4672 & MC4673, CCNPP-CHLE-002, Rev 0e Chemical Effects Experimental Protocol with Respect to GL2004-02, GSI-191. Project stage: Request ML13088A2202013-03-18018 March 2013 MC4672 & MC4673 - CCNPP-CHLE-005, Rev 1 Chemical Effects Autoclave Experimental Plan with Respect to GL2004-02, GSI-1 91 Project stage: Request ML13086A5492013-03-20020 March 2013 MC4672 & MC4673 - Licensee Presentation-Category 1, Public Meeting on March 20, 2013 with Respect to GL2004-02, GSI-191 Project stage: Meeting ML13091A0552013-04-10010 April 2013 Summary of Meeting on March 20, 2013, with Calvert Cliffs Nuclear Power Plant, LLC, to Discuss the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation D Project stage: Meeting ML13149A3942013-05-20020 May 2013 Chemical Effects Head Loss Experiment (Chle) Test Protocol for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-002, Revision 0 May 20, 2013 Project stage: Request ML13149A3992013-05-20020 May 2013 Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant CCNPP-CHLE-005, Revision 2, May 20, 2013 Project stage: Request ML13149A4052013-05-23023 May 2013 Metals BENCH-TOP Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-006, Revision 0, May 23, 2013 Project stage: Request ML13148A3962013-05-29029 May 2013 Forthcoming Meeting with Calvert Cliffs Nuclear Power Plant, LLC to Discuss Licensee'S Proposed Plan for Resolution of GL 2004-02 Project stage: Meeting ML13179A3132013-07-11011 July 2013 June 12, 2013 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculati Project stage: Meeting ML13224A0942013-08-0606 August 2013 Chemical Effects Pirt Considerations for Calvert Cliffs Nuclear Power Plant, CCNPP-CHLE-003, Revision 0c Project stage: Request ML13224A1032013-08-0808 August 2013 CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. Project stage: Request ML13226A0902013-08-14014 August 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC Project stage: Meeting ML13304B4032013-11-0101 November 2013 Notice of Forthcoming Meeting with Constellation Energy Nuclear Group, LLC, Project stage: Meeting ML13319A9392013-11-13013 November 2013 Ri GSI-191 November 2013 Meeting with NRC Rev 0 Project stage: Request ML13310B9292013-12-0606 December 2013 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During ... Project stage: Meeting ML14014A0392014-01-29029 January 2014 Summary of Meeting with Constellation Energy Group, Inc., to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During.. Project stage: Meeting ML14206B0012014-02-14014 February 2014 Long-Term Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNP-CHLE-011, Revision 2 Project stage: Request ML14142A3232014-05-22022 May 2014 NRR E-mail Capture - Calvert Cliffs May 21, 2014 Public Meeting Presentation Project stage: Request ML14206A9932014-07-25025 July 2014 Conrete Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNPP-CHLE-010, Revision 1 Project stage: Request ML14206B1442014-11-0606 November 2014 May 21, 2014 Summary of Meeting with Exelon Generation Company, LLC, to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02 Project stage: Meeting ML14206A2062014-11-0707 November 2014 July 2, 2014 Summary of Meeting with Exelon Generation Company, LLC to Continue Discussions on the Proposed Risk-Informed Approach to the Resolution of Generic Letter 2004-02 Project stage: Meeting ML15154B5572015-06-17017 June 2015 May 19, 2015 Summary of Meeting with Exelon Generation Company, LLC, on Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Chemical Effects Testing for Resolution of Generic Letter 2004-02 (TAC Nos. MC4672 & MC4673) Project stage: Meeting ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach Project stage: Request 2013-11-01
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18190A3922018-06-14014 June 2018 Licensee Presentation Material for June 14, 2018 Public Meeting ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18096A0222018-04-0404 April 2018 Annual Assessment Meeting 04/04/2018 Handouts ML18096A9902018-03-12012 March 2018 NRC Pre-Submittal Call Briefing Notes, Calvert Cliffs Emergency Planning Future Licensing Actions ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17143A1612017-05-23023 May 2017 Annual Assessment Meeting Handout and Sign in Sheet ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request 2024-05-16
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24310A0672024-11-0505 November 2024 Constellation NRC Pre-Submittal Meeting Slides - Proposed Alternative for Reactor Vessel Closure Stud Exam Optimization ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) ML22124A1482022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update ML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16242A1782016-09-0101 September 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16198A0012016-07-18018 July 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L 2024-05-16
[Table view] |
Text
CENGSM a joint venture of Energy, Constellation 'eDF Calvert Cliffs Chemical Effects in Risk-Inform ed GSI-191 Resolution Third Discussion With NRC Staff March 20, 2013
Agenda
" Introductions
" GSI-191 Resolution Plan
- Detailed review of CCNPP Chemical Effects PIRT Items
- Overview of CCNPP Integrated Chemical Effects Test Program Plan & Test Protocol a Open Items from January 8, 2013 Conference Call
- Schedule for future periodic meetings CENG-2
CCNPP Attendees
" Elliott Flick- General Manager Fleet Engineering
" Tom Konerth - Supervisor Mechanical Design
- Ken Greene - Licensing Engineer
- John Swailes - Project Manager GSI-191
" Craig Sellers - Project Manager RI GSI-191
" Andrew Henni - Lead Design Engineer RI GSI-191
- Steve Kinsey- Chemical Effects
" Josh Wargo - Chemical Effects & Testing
" Robert Peterson - Independent Oversight RI GSI-191 CENG ajoin, ventureo 0D
Primary Objectives of Meeting m Review & Work Towards Agreement on Phenomena Identification and Ranking Table (PIRT) Items m Review Test Protocol m Work Towards Agreement on Plans & Protocols
- Prefer to Divide Time Between PIRT & Protocol Discussion CENG-ajoin venture of 0~~o~w 4
CCNPP GSI-191 Resolution Plan SECY-12-0093 Option 2 Plant Modifications
- Aluminum Minimization
" Mineral Wool & Other Insulation Replacement
" Scissor Lift Removal
- NPSH Assurance
" Refueling Cavity Drain Enlargement
" Recirculation Suction Header Temperature Instrumentation
- Other Operational Considerations
" Secure Containment Sprays
- Reduce Recirculation Flow
" Additional Input to PAMs for Facilitate Post-RAS Operation
" Large Scale Fiber Insulation Replacement CENG.
aIont enture of
,Am =ýi 0
CCNPP GSI-191 Resolution Plan (continued)
SECY-12-0093 Option 2
" Testing
- Integrated Chemical Effects Testing
- Strainer Bypass (Penetration) Testing
- Strainer Head Loss Testing, as Required
" Industry Activities
- Partner in STP RI GSI-191 Resolution Project
- Participant in PWROG Comprehensive Analysis and Test Programs OENG- --
CCNPP Chemical Effects PIRT Items
[Calvert Cliffs PIRT Item Summary]
- 1. Addressed in Tests similar to STP
- NRC staff agreed with STP approach.
- Discussion as Needed.
- 2. Addressed in Tests similar to STP
- NRC staff has yet to agree with STP approach.
- Require Detailed Discussion with the NRC Staff.
- 3. PIRT items Not Planning to Address in Tests
- Require Detailed Discussion with the NRC Staff.
- 4. Resolved PIRT
- NRC has previously agreed.
- May not be addressed in testing. Discussion as Needed.
CENG-
Page-by-Page Review of PIRT Report
[CCN PP-CH LE-003]
avf
-~id~u &maimsbe address"d in realisuc cheimical affcti tsmag nisfmtsse "Itormicrato a momfrissuets &hatmawt be addressed inramlsisc chmial M -t tasbm xk sudcam an-sm u mb U- ircaea f Items,~~~e~ F~WM x ineca imM A noananonte mb - .E.A-ircamclafe Pm*~P=frein 3.e underliugtCoemalnmim Peel dleistry 4.0 Soldpcies ftwciotttmm 1.1 RCM cooLman cbemanirtz coudfes at break 1.3 By*m p l som n 4.1 P -mei-al b- .sx X 4.2 Han m w m"smod ec oas mdmati M.4 Coalm simy COi s*x* *- an cd o air mhaug. 4.3 Reactor core:-edptonprecipi md 1S EC c* dboron .4 Particulate shus siten s
I j4 2.0 Eadlaleica Coesidraftems 4.5 Copreclptanion L.0 AMlmeratean and Sottia diamical Elfects 2.Radiological effecis. corrosion reo Chanps 5.1 Inargmani gomneration 2.3 fdyirolisl 2.4 CouversiofNztmfhNOi 5.2 Deposition mnd seeding x t
2.5 AdditmWndebrits bed chmniad racioans 5.3 Q~uescaut settling ofyremqutate 30 ysl C*l mmicaLsaed eleocal Debnts Sea.ce Tesns SA4 Transpoct pbenme precipatad-ionlcpredv4 -
6.0 Orgamics and Coating 3.1 Crud release 6.1 BA reak omily to Orgmmc sources 3.2 Jetmplagemet 3.3 Debris asixpm'del/liber rateo 6.2 Oramc agglollmerationt 3.4 mmects oftdissolived sillca froms RCS ad RWIST 6.3 Organic complertin-h 3.5 Coautminmemtsaytrospert 6.4 Co*-atnugdsouonadlchg A.6 hu" debris dissol*utio 7A Clenaical Effects an Domustmam Systemn Performance 3.7 3.2 3.9 Subsuujd source ormsi lead (Pb) shielding Sehmwjpd source tarms copper (Cu)
Couceem MO1 A~icytg efets at"amo a &ng 7.1 7.2 7.3 ECCS pump: seal abrasion and ewosion/corrosion Beat exchangert dapositim ndcogging Reactor coam; fuel deposition and precipitaton I
7A4 Reactor core: diminished beat tanssiir 3.1 Advanced metalli corrosion undaersading 7.5 Reactor cr:blocking offkow passages 3.12 Simbmmariit so-c t-m- biological grwt .n debris beds 3.13 Eaacter Cair fuel deposition spaling 7.6 Reactor core: particulate, settling CENG.
aja~ntventure of O0- -;D 8
Overview of Chemical Effects Test Program
" Objective
- Identify Chemical Effects Head Loss on "Detector" Debris Bed
- Determine Time and/or Temperature at Which Chemical Effects Head Loss Occurs
" Approach
- Long-Term (-~30 Day) Integrated Chemical Effects Tests
- Circulate Flow Through Repeatable "Detector" Debris Bed
- Similar to STP CHLE Test Program CENG.
a~~
j ew J
Overview of Test Plan CCNPP-CHLE-O01
" Begin with Design Basis Tests
- DEGB LBLOCA Conditions
- Multiple Plant Configurations
" First Stage Aluminum Removal
" Second Stage Insulation Replacement
" Potential Negligible Chemical Effects Outcome
- Discuss Regulatory Response
- Medium & Small Breaks
- Consistent with STP RI Approach CENGt a 0,n e
=e.reo OW=T &winD *V
Overview of Integrated Test Protocol CCNPP-CHLE-002
- Use CCNPP-Specific Chemistry Conditions
- Use CCNPP-Specific Materials
- Insulation
- Fire Barrier Material
- Coatings
- Lead Blanket Shielding
- Exposed Concrete
- Metallic Materials
° Aluminum
" Galvanized Steel
" Copper
- Lead CENG-a joint venture of 0~ WeotL
Overview of Integrated Test Protocol (cont.)
" Simulate Bounding 30-Day Sump Temperature
- Considering Pressurized Facility for >212°F
- Planning Autoclave Tests to Investigate Impact of Short Duration High Temperature Conditions
- Sump Chemistry & Scaled Materials
- Compare Relative Elemental Concentrations in Fluid
" Stepwise Reduce Temperature Day 31
- Developing Basis for Temperature Plateau Durations A-o i CENGI.
en mi a L 12
Detector Debris Bed m Developed in late 2008
- Used for Earlier CCNPP Testing
- Reviewed with NRC n Also used in Indian Point & Vogtle Testing
" Very Sensitive
" Composition: Sustne untt (ngrm NUKON 16 +/- 0.1 Silicon carbide 80 +/- 0.1 CENG-a joint venture of-0onW&Lo .Em I ,ON I 13
Detector Debris Bed Repeatability
- Repeatability 2.5 I I I t
Demonstrated in 10-ppm Al 2
Multiple Test Programs '4
- Calvert Cliffs 1.5
- Indian Point 0 Al r75-ppm
- Vogtle
-ppm AJ Multiple Temperatures and Flow Rates 0 I I 0 10 20 30 40 50 60 70 80 Time [hr]
CENG,-
a joint venture of 0 "em 14
Detector Debris Bed Sensitivity
- Sensitivity Verified by use of WCAP-16530 '-- 4 Surrogate NAS 8 Temperature 0
- 135FOF
- 0.028 ft/sec velocity _ I
- 1ppm NAS 4 80 WCAP chemical debris 2 added to loop 60
- >40x Increase in Debris 0 - 40 Bed DP 0 1 2Time [hr]
CENG
&,J
Page by Page Review of Test Protocol CCNPP-CHLE-002 I I I1 I1 4 S I1 4 I1 I a ~
2 3 4 1 5 4 I II I*T* "rw* ArT *n u*v*w I a ISTOP THINK ACT AND REVIEW REACTION CHA8-iE INTIAL S(JLuJTIoN PREPARA*ION CHAM'BER A
!Li iv - ý I I fAO LOSS EFFECTS CI(YAL4 EXPEDIENT ICIHL1 KAY 1 F F I I 2 1 5 6 7 1 t1 I CENG-a jin, ventureltf of 0~r 16
Possible Results
" Large Chemical Effects Head Loss
- Not Anticipated
- <140 OF
" Small Chemical Effects Head Loss
- Possible
- <140 OF
" Negligible Chemical Effects Head Loss
- Possible CENG a joint venture of 0
17
Open Items- January 8, 2013 Call
- 1" & /" DP Instrument Piping/Tubing
- 3/4" Pressure & Level Instrument Piping/Tubing
- 3/4" Reactor Head Vent Piping
- NRC concerned that STP Methods not Approved
- CCNPP not considering Time-Dependent Transport for Strainer Head Loss or Chemical Effects
- May use Time-Dependent Transport for In-Vessel Effects
- 100% Particulate Latent Debris
- Current Approach is 85% Particulate 15% Fiber
- Consistent with NEI 04-07
-~~~
hiGENGu join~ ~:;
Schedule for Future Periodic Meeting
" CCNPP-Specific Meetings
- Request Monthly Until Testing Complete
- Quarterly After Testing Complete
" STP-Specific Meetings
- CCNPP Will Participate
- STP Participant-Specific Meetings
- CCNPP Will Participate CENG.
a jon, venture of 0~ ~o 19