ML051530304

From kanterella
Jump to navigation Jump to search

6/3/05, Calvert Cliffs - RAI Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors
ML051530304
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/03/2005
From: Richard Guzman
NRC/NRR/DLPM/LPD1
To: Vanderheyden G
Calvert Cliffs
Guzman R, NRR/DLPM 415-1030
References
GL-04-002, TAC MC4672, TAC MC4673
Download: ML051530304 (5)


Text

June 3, 2005 Mr. George Vanderheyden, Vice President Calvert Cliffs Nuclear Power Plant, Inc.

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS (TAC NOS. MC4672 AND MC4673)

Dear Mr. Vanderheyden:

By letter dated March 3, 2005, Constellation Energy (the licensee) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The GL requested the licensee perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL.

The NRC staff has completed its preliminary review of your response and has determined it needs additional information requested in the enclosure to complete our review.

This RAI requests additional information about your overall plans and schedules and not any information on detailed plans or extensive analyses. In light of this, please provide the additional information requested in the enclosure within 45 days of receipt of this letter.

In addition, on page 3 of your GL 2004-02 response, you requested an extension of the completion date for the Unit 1 corrective action to May 31, 2008. Paragraph 2(b) of the Required Information section of GL 2004-02 states that if all corrective actions will not be completed by December 31, 2007, licensees are to describe how the regulatory requirements discussed in the Applicable Regulatory Requirements section of the GL will be met until the corrective actions are completed. Given that information is not required to be provided until September 1, 2005, the staff will not be able to act on your request for an extension until that information is provided.

Mr. George Vanderheyden If you have any questions, please call me at (301) 415-1030.

Sincerely,

/RA/

Richard V. Guzman, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Request for Additional Information cc w/encl: See next page

Mr. George Vanderheyden June 3, 2005 If you have any questions, please call me at (301) 415-1030.

Sincerely,

/RA/

Richard V. Guzman, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC PDI-1 R/F RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDlpmLpdi1 (RLaufer) RidsNrrPMRGuzman RidsNrrLADBaxley RidsRgnIMailCenter DCullison/DSolorio RidsNrrDlpmDpr RidsNrrDssaDpr MWebb RidsNrrLASLittle Accession No.: ML051530304 *RAI input from SPLB without any major change OFFICE PDIV-1/PM PDIV-1/LA DSSA/SPLB/SP PDI-1/PM PDIV-1/SC PDIII-2/PM PDIII-2/SC NAME MWebb/JHopkins DBaxley DCullison/DSolorio* RGuzman DTerao/

GSuh DATE 6/2/2005 6/2/05 5/23/05 6/3/05 6/3/05 OFFICIAL RECORD COPY

Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 cc:

President Mr. Loren F. Donatell Calvert County Board of NRC Technical Training Center Commissioners 5700 Brainerd Road 175 Main Street Chattanooga, TN 37411-4017 Prince Frederick, MD 20678 Carey Fleming, Esquire Sr. Counsel - Nuclear Generation Constellation Generation Group, LLC 750 East Pratt Street, 17th floor Baltimore, MD 21202 Lou Larragoite Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. R. I. McLean, Administrator Radioecology Environ Impact Prog Department of Natural Resources Nuclear Evaluations 580 Taylor Avenue Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Kristen A. Burger, Esquire Maryland People's Counsel 6 St. Paul Centre Suite 2102 Baltimore, MD 21202-1631 Patricia T. Birnie, Esquire Co-Director Maryland Safe Energy Coalition P.O. Box 33111 Baltimore, MD 21218

REQUEST FOR ADDITIONAL INFORMATION REGARDING GENERIC LETTER 2004-02, POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY SUMP RECIRCULATION AT PRESSURIZED-WATER REACTORS CONSTELLATION ENERGY CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 By letter dated March 3, 2005, Constellation Energy (the licensee) provided the 90-day response to U. S. Nuclear Regulatory Commission (NRC) Generic Letter (GL) 2004-02 for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The GL requested that addressees perform an evaluation of the emergency core cooling system and containment spray system recirculation functions in light of the information provided in the GL and, if appropriate, take additional actions to ensure system function. Additionally, addressees were requested to submit to the NRC the information specified in the GL. The staff has completed its preliminary review of your response and has determined it needs the following additional information to complete our review:

1. On page 2 of your GL 2004-02 response, you stated the susceptibility of the Unit 1 emergency core cooling system and containment spray system recirculation functions to the adverse effects identified in GL 2004-02 was analyzed using the guidance in NEI 04-07. You did not provide a description of the methodology to be used for the Unit 2 analyses. As requested in GL 2004-02, please provide a description of methodology to be used in the Unit 2 analyses and the planned completion date.
2. In addition, your response did not provide a discussion of your plans or schedule for addressing chemical and downstream effects. Although the GL did not specifically request that the evaluation of these effects be discussed in the 90-day response, please discuss your plans and schedule for evaluating chemical and downstream effects and verify whether your September 1, 2005, response will include an evaluation of these effects.

ENCLOSURE