Calvert Cliffs GSI-191 Program Analysis of Longitudinal Welds, Debris Generation Centroid Approach, and Response to NRC Questions September 1, 2016
Agenda
- Introductions
- Objectives for Meeting
- Analysis of Longitudinal Welds
- Debris Generation Centroid Approach
- Response to Requests for Information
- Staff Questions & Concerns
- Schedule for Future Periodic Meetings Calvert Cliffs Option 2b Refined Closure Plan 1
CCNPP Attendees
- John Haydin - M&CU Engineering Manager
- Andre Drake - Lead Responsible Engineer GSI-191
- Ken Greene - Licensing Engineer
- Craig Sellers - Project Manager GSI-191
- Eric Federline - Project Support Calvert Cliffs Option 2b Refined Closure Plan 2
Analysis of Longitudinal Welds
- Location of Longitudinal Welds in Containment
- Locating and Orienting ZOIs on Longitudinal Welds
- Analyzing ZOIs
- Example Results - Longitudinal Break adjacent to a DEGB
- Example Results - Max debris from main loop DEGBs and Longitudinal Welds Calvert Cliffs Option 2b Refined Closure Plan 3
Location of Longitudinal Welds
- Primary Coolant Piping Calvert Cliffs Option 2b Refined Closure Plan 4
Locating ZOIs
- Longitudinal Weld ZOI locations :
- Only model main loop longitudinal breaks in the SG Compartments
- Ignoring the reactor cavity
- Ignore longitudinal welds shorter than the pipe ID
- If the longitudinal weld (measured along the axis of the pipe) is longer than the pipe ID, divide into equal segments, where the number of segments equals (length of the weld/pipe ID) rounded up to the nearest whole number (example below)
- Pipe ID = 42
- Length = 105
- #Segments = (105/42) = 2.5
- Round up to 3 segments
- 2 ZOIs every 35 Calvert Cliffs Option 2b Refined Closure Plan 5
ZOIs on Longitudinal Welds (near side)
ZOIs on Longitudinal Welds (opposite side)
Analyzing ZOIs at Longitudinal Welds Full-size longitudinal ZOIs sized with a radius of (ZOI size) x (pipe ID) x 2 Partial break ZOIs sized normally: radius = (ZOI size) x (break size)
Longitudinal break ZOIs only allowed in the direction of the welds (see images)
Example Results Calvert Cliffs Option 2b Refined Closure Plan 6
ZOI on Longitudinal Weld (30-RC-5LU-A)
ZOI on Butt Weld (30-RC-12A-05)
Example Results - ZOIs Sized for Thermal Wrap Calvert Cliffs Option 2b Refined Closure Plan 7
Spherical ZOI on Butt Weld (30-RC-12A-05)
Hemispherical ZOI on Longitudinal Weld (30-RC-5LU-A)
Example Results Calvert Cliffs Option 2b Refined Closure Plan 8
Debris Generation Centroid Methodology
- Insulation debris size distribution centroid methodology
- Generic ENERCON calculation (GSI191-CALC-001) provides methodology for calculating debris size distribution as a function of the average distance of insulation in the ZOI from the break (i.e., the centroid distance) based on the methodology recommended in NEI 04-07 Volume 2
- This methodology was discussed with NRC staff on Vogtle project August 11, 2016 Calvert Cliffs Option 2b Refined Closure Plan 9
RAI from December 1, 2016 Meeting
- Provide head loss plots from strainer head loss tests
- Slides 11 through 17
- Maximum concentration of aluminum predicted by WCAP-16530
- Slide 18
- Provide justification that chemical precipitates will not form until after one CS pump is secured
- Slide 19
- Welds with degradation mechanisms additional to design and construction flaws
- Slide 20
- Discussion of non-piping LOCA initiators
- Slide 21
- Justify basis for fiber fines as fibrous debris performance criterion for strainer
- Slide 22
- Provide representative sequences leading to core damage in GSI-191 risk assessment
- Slide 23
- Confirm materials of construction in RCS piping
- Slide 20 Calvert Cliffs Option 2b Refined Closure Plan 10
Head Loss Plot - Test 1, Full Debris Load with small pieces Calvert Cliffs Option 2b Refined Closure Plan 11 0
0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0
1 2
3 4
5 6
0 10 20 30 40 50 Head Loss (ft-water)
Head Loss (in-water)
Test time (hours)
Chemical Head Loss Test 1 Non-Chemical Head Loss Chemical Effects Head Loss
Head Loss Plot - Test 2, Thin-Bed Test Calvert Cliffs Option 2b Refined Closure Plan 12 0
0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0
1 2
3 4
5 6
0 5
10 15 20 25 30 Head Loss (ft-water)
Head Loss (in-water)
Test time (hours)
Chemical Head Loss Test 2 - Thin Bed Test Non-Chemical Head Loss Chemical Effects Head Loss
Head Loss Plot - Test 3, Fines Only Calvert Cliffs Option 2b Refined Closure Plan 13 0
0.5 1
1.5 2
2.5 3
3.5 4
0 4
8 12 16 20 24 28 32 36 40 44 48 8
12 16 20 24 28 32 Head Loss (ft-water)
Head Loss (in-water)
Test Time (hours)
Chemical Head Loss Test #3 Non-Chemical Head Loss Chemical Effects Head Loss
Head Loss Plot - Test 4, Fines Only Calvert Cliffs Option 2b Refined Closure Plan 14 0
0.125 0.25 0.375 0.5 0.625 0.75 0
1 2
3 4
5 6
7 8
9 0
10 20 30 40 50 60 70 Head Loss (ft-water)
Head Loss (in-water)
Test Time (hours)
Chemical Head Loss Test #4 Non-Chemical Head Loss Chemical Effects Head Loss
Head Loss Plot - Test 5, Fines Only Calvert Cliffs Option 2b Refined Closure Plan 15 0.00 0.25 0.50 0.75 1.00 1.25 1.50 0
2 4
6 8
10 12 14 16 18 0
10 20 30 40 50 60 Head Loss (ft-water)
Head Loss (in-water)
Test Time (hours)
Chemical Head Loss Test #5 Non-Chemical Head Loss Chemical Effects Head Loss
Head Loss Plot - Test 6, Rejected due to Improper Agitation Calvert Cliffs Option 2b Refined Closure Plan 16 0
0.5 1
1.5 2
2.5 3
3.5 4
0 4
8 12 16 20 24 28 32 36 40 44 48 5
10 15 20 25 30 35 40 45 Head Loss (ft-water)
Head Loss (in-water)
Test Time (hours)
Chemical Head Loss Test #6 Non-Chemical Head Loss Chemical Effects Head Loss
Head Loss Plot - Test 7 Calvert Cliffs Option 2b Refined Closure Plan 17 0
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
0 2
4 6
8 10 12 5
10 15 20 25 30 35 40 Head Loss (ft-water)
Head Loss (in-water)
Test Time (hours)
Chemical Head Loss Test #7 Non-Chemical Head Loss Chemical Effects Head Loss
Aluminum Concentration
- Largest Debris Load - Exceeds Strainer performance criteria
- Weld ISI 42-RC-11-W5 - DEGB at Hot Leg nozzle to SG11
- 626 ft3 Thermal Wrap
- 437 ft3 NUKON
- 137 ft3 Generic Fiberglass
- 31 ft3 Temp-Mat
- 6.5 ft3 Mineral Wool
- 0.2 ft3 Marinite
- WCAP-15650 Al 1.67 ppm
- Critical Break Debris Load - Smallest debris load that exceeds strainer performance criteria
- Weld ISI 30-RC-12A DEGB at lower elbow RCP suction from SG12
- 311 ft3 Thermal Wrap
- 210 ft3 NUKON
- 30 ft3 Generic Fiberglass
- 11.5 ft3 Temp-Mat
- 8.7 ft3 Mineral Wool
- 0.15 ft3 Marinite
- WCAP-15650 Al 1.66 ppm Calvert Cliffs Option 2b Refined Closure Plan 18
Chemical Precipitates & CS Pump Trip
- Chemical Precipitants remain soluble until sump fluid cools to 140°F.
- GOTHIC analysis of maximum containment cooldown conditions in process.
Calvert Cliffs Option 2b Refined Closure Plan 19
RCS Materials and Weld with Degradation Mechanisms
- Preliminary analysis shows critical break size is 30 cold leg break
- Butt and Longitudinal
- Only welds with degradation mechanisms in addition to design & construction flaws are the Dissimilar Metal welds at RCPs subject which are also subject to PWSCC Calvert Cliffs Option 2b Refined Closure Plan 20
Non-Piping LOCA Initiators
- Preliminary analysis shows critical break size is 30 cold leg break
- Single-sided break too small to generate sufficient debris to threaten strainer performance
- Valves, CEAs, and instrument lines even smaller.
Calvert Cliffs Option 2b Refined Closure Plan 21
Exclusion of Small Pieces of Debris
- Test #1 included fines and small pieces of fibrous debris
- Debris bed head loss was very low - 1.8 inches of water
- After addition if chemical precipitates
- Remaining tests used only fine fibers. Small pieces were omitted.
- All tests omitted RMI debris to avoid mixed bed with increased porosity.
Calvert Cliffs Option 2b Refined Closure Plan 22
Top Sequences Leading to GSI-191 Related Core Damage
- Large Break LOCA Event Tree is shown below.
- GSI-191 related failures result in loss of High-Pressure Recirculation (HPR)
- Single sequence related to GSI-191 failures Calvert Cliffs Option 2b Refined Closure Plan 23
Questions/Concerns
- Jointly Review Issues, Questions, and Concerns for Future Communication Calvert Cliffs Option 2b Refined Closure Plan 24
Next Steps
- Finalize Update of Calculations
- Present Formal Risk-Informed GSI-191 Analysis and Results
- Desire Next Meeting - 4Q 2016 Calvert Cliffs Option 2b Refined Closure Plan 25