Letter Sequence Other |
---|
TAC:ME2609, Control Room Habitability, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) TAC:ME2610, Control Room Habitability, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) |
Results
Other: L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5, L-PI-11-060, Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology, L-PI-11-079, Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology, L-PI-13-111, Notification of Alternative Source Term (AST) Implementation and Unit 2 Steam Generator Replacement, ML102300296, ML102300297, ML102300298, ML111822669
|
MONTHYEARL-PI-09-114, License Amendment Request to Adopt the Alternative Source Term Methodology2009-10-27027 October 2009 License Amendment Request to Adopt the Alternative Source Term Methodology Project stage: Request ML0935704512009-12-23023 December 2009 Acceptance Review of LAR to Adopt Alternative Source Term Methodology (TAC Nos. ME2609 & ME2610) Project stage: Acceptance Review L-PI-10-041, Response to Requests for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology2010-04-29029 April 2010 Response to Requests for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology Project stage: Response to RAI L-PI-10-046, Response to Requests for Additional Lnformation License Amendment Request to Adopt the Alternative Source Term Methodology2010-05-25025 May 2010 Response to Requests for Additional Lnformation License Amendment Request to Adopt the Alternative Source Term Methodology Project stage: Request L-PI-10-054, Response to Requests for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology2010-06-23023 June 2010 Response to Requests for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology Project stage: Response to RAI L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 52010-07-23023 July 2010 Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5 Project stage: Other ML1023002982010-07-23023 July 2010 Calculation No. GEN-PI-082, Revision 1, Control Rod Ejection Accident - AST, Attachment 4 Project stage: Other ML1023002972010-07-23023 July 2010 Calculation No. GEN-PI-081, Revision 1, Eab, LPZ, and CR Doses Due to Steam Generator Tube Rupture Accident - AST, Attachment 3 Project stage: Other ML1023002962010-07-23023 July 2010 Calculation No. GEN-PI-078, Revision 1, Main Steam Line Break (MSLB) Accident Analysis Using AST, Attachment 2 Project stage: Other ML1022200872010-08-10010 August 2010 Forthcoming Meeting with Northern States Power Company - Minnesota (Nspm), to Discuss the Prairie Island Nuclear Generating Plant Steam Generator Margin-to-Overfill Analysis as It Relates to Pingp'S License Amendment Request to Adopt... Project stage: Meeting ML1023002952010-08-12012 August 2010 Response to Requests for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology Project stage: Response to RAI ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant Project stage: Request ML1025903972010-09-23023 September 2010 Prairie Island, Summary of Meeting with Northern States Power Company to Discuss the Alternative Source Term License Amendment Request Project stage: Meeting ML1032205572010-11-15015 November 2010 Draft RAI Concerning AST SGTR Mto Analysis Project stage: Draft RAI ML1032205552010-11-15015 November 2010 Draft RAI Concerning AST SGTR Mto Analysis Project stage: Draft RAI L-PI-10-112, Prairie Lsland Nuclear Generating Plant Units 1 and 2, Response to Request for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology (TAC Nos. ME2609 and ME26102)2010-12-17017 December 2010 Prairie Lsland Nuclear Generating Plant Units 1 and 2, Response to Request for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology (TAC Nos. ME2609 and ME26102) Project stage: Response to RAI ML1110400212011-04-0404 April 2011 NRR E-mail Capture - Prairie Island - Revised Alternative Source Term LAR Draft RAI 4-4-2011 Project stage: Draft RAI ML1035404332011-05-12012 May 2011 Requests for Additional Information (RAI) Associated with Adoption of the Alternative Source Term Project stage: RAI L-PI-11-060, Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology2011-06-22022 June 2011 Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology Project stage: Other ML1118226692011-06-29029 June 2011 PINGP - AST Methodology - ME2609 and ME2610 Project stage: Other L-PI-11-068, Response to Requests for Additional Information (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology2011-07-11011 July 2011 Response to Requests for Additional Information (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology Project stage: Response to RAI ML1120819672011-07-20020 July 2011 E-mail Prairie Island - Request for Clarification of June 22, 2011 Request for Additional Information (RAI) Response Project stage: RAI L-PI-11-079, Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology2011-08-0909 August 2011 Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology Project stage: Other ML1125503562011-09-0101 September 2011 Ngp - Draft RAI Concerning SGTR Instrumentation for Alternative Source Term LAR Project stage: Draft RAI ML1125503572011-09-0101 September 2011 PINGP Draft RAI - AST Instrumentation Project stage: Draft RAI ML1131100842011-11-0202 November 2011 Alternative Source Term Draft Request for Additional Information Project stage: Draft RAI ML1131100942011-11-0202 November 2011 RAI Prairie PINGP, Units 1 and 2 Project stage: RAI L-PI-11-099, Response to Requests for Additional Information Regarding Regulatory Guide 1.97 Instrumentation Associated with Adoption of the Alternative Source Term (AST) Methodology2011-12-0808 December 2011 Response to Requests for Additional Information Regarding Regulatory Guide 1.97 Instrumentation Associated with Adoption of the Alternative Source Term (AST) Methodology Project stage: Response to RAI L-PI-12-010, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term Methodology2012-02-13013 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term Methodology Project stage: Response to RAI L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology Project stage: Response to RAI L-PI-12-082, Response to Requests for Additional Information (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology2012-09-13013 September 2012 Response to Requests for Additional Information (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology Project stage: Response to RAI ML1125212892013-01-22022 January 2013 Issuance of Amendments Adoption of Alternative Source Term Methodology Project stage: Approval L-PI-13-111, Notification of Alternative Source Term (AST) Implementation and Unit 2 Steam Generator Replacement2014-01-13013 January 2014 Notification of Alternative Source Term (AST) Implementation and Unit 2 Steam Generator Replacement Project stage: Other 2011-12-08
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 to Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds ML24081A1532024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) ML24088A1102024-02-25025 February 2024 Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves 2024-09-27
[Table view] |
Text
Xcel Energy January 13, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089 L-PI-13-111 10 CFR 50.4 Notification of Alternative Source Term (AST) Implementation and Unit 2 Steam Generator Replacement (TAC Nos. ME2609 and ME2610) In a letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 27, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093160605),
the Northern States Power Company, a Minnesota corporation doing business as Xcel Energy (hereafter "NSPM"),
requested an amendment to the Technical Specifications (TS) for Prairie Island Nuclear Generating Plant (PINGP).
The proposed amendment requested adoption of the Alternative Source Term (AST) methodology, in addition to TS changes supported by AST design basis accident radiological consequence analyses.
In a letter to NSPM dated January 22, 2013 (ADAMS Accession No. ML 112521289),
the NRC issued Unit 1 and Unit 2 license amendments 206/193 to adopt the AST methodology.
Appendix 8 of the respective Renewed Operating Licenses imposes the following additional condition:
"NSPM will provide the NRC written notification when Unit 2 [Replacement Steam Generator]
RSG installation is complete and AST License Amendment implementation has commenced."
The purpose of this letter is to inform the NRC that the Unit 2 RSGs have been installed, and with Unit 2 startup entering Mode 4 (on December 27, 2013), the installation is considered complete.
Also, Technical Specification changes associated with Amendments 206/193 have been distributed.
- Thereby, NSPM has commenced AST license amendment implementation, and the submittal of this letter completes the action required by the subject license condition prior to the required due date (within 30 days after completion of the outage in which the Unit 2 RSGs are installed).
NSPM submits this notification in accordance with the provisions of 10 CFR 50.4.
Document Control Desk Page 2 If there are any questions or if additional information is needed, please contact Glenn Adams at (612) 330-6777.
Summary of Commitments This letter contains no new commitments or changes to existing commitments.
Kevin K. Davison Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC State of Minnesota