|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
See also: IR 05000482/2017404
Text
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
July 31, 2017 Mr. Adam C. Heflin, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION
- NRC SECURITY INSPECTION REPORT 05000482/2017404
Dear Mr. Heflin:
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station. The NRC inspectors discussed the results of this inspection with Mr.
C. Reasoner
, Site Vice President and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
One self-revealed finding w
as identified during this inspection. The NRC is treating this violation
as a non-cited violation
(NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest th
is violation or significance of
this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial,
to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington,
DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001; and the NRC resident inspector at the Wolf Creek Generating Station.
A cross-cutting aspect is assigned to this finding in the area of human performance, procedures in that station personnel failed to follow procedures
(H.8). If you disagree with a cross
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
-0001; with copies to the Regional Administrator, Region IV, and the NRC Resident Inspectors at the Wolf Creek Generating Station.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html
and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, and Requests for Withholding."
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX
76011-4511
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
A. Heflin 2 OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
However, the enclosed report contains Security
-Related Information, so the enclosed report will not be made publically available in accordance with 10
CFR 2.390(d)(1). If you choose to provide a response that contains Security
-Related Information, please mark your entire response "Security
-Related Information
- Withhold from Public Disclosure under 10 CFR 2.390"
in accordance with 10
CFR 2.390(d)(1) and follow the instructions for withholding in
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10
CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Jeremy R. Groom
Chief, Plant Support Branch
1 Division of Reactor Safety
Docket No. 50
-482 License No. NPF
-42
Non-public Enclosure:
NRC Inspection Report 05000482/2017404
w/Attachment: Supplemental Information
cc w/enclosure:
Mr. Mike Skiles
Security Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
cc w/o enclosure:
Electronic Distribution
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
A. Heflin OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
WOLF CREEK GENERATING STATION
- NRC SECURITY INSPECTION REPORT 05000482/2017404
- JULY 31, 2017 Distribution w/enclosure
- EWharton, NSIR
NSimonian, NSIR CJohnson, NSIR
DGarner, NSIR
RMcKinley, RI DRS
BDesai, RII DRS
SOrth, RIII DRS
KKennedy, ORA
SMorris, ORA
TPruett DRP
RLantz, DRP
AVegel, DRS
JClark, DRS
JGroom, DRS
DDodson, DRP
FThomas, DRP
NTaylor, DRP
DProulx, DRP
SJanicki, DRP
JMelfi, DRP
SGalemore, DRP
Distribution w/o enclosure
- VDricks, ORA
BSingal, NRR
THipschman, DRS
MHerrera, FRMB
KFuller, ORA
EUribe, DRS
JWeil, RIV/CAO
AMoreno RIV/CAO
JBowen, RIV/OEDO
ACES GWalker, OI
BMaier, ORA
RidsOeMailCenter Resource
ADAMS ACCESSION
NUMBER: ML17212A830
Entire Report:
ADAMS: Non-Publicly Available
Non-Sensitive
Keyword:
SUNSI Review
By: Yes No Publicly Available
Sensitive _______MD 3.4 A.3
ADAMS ACCESSION
NUMBER: ML17212A923
Cover Letter Only:
ADAMS: Non-Publicly Available
Non-Sensitive
Keyword:
SUNSI Review By:
Yes No Publicly Available
Sensitive
NRC-002 OFFICE SPSI:PSB1
PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1 NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom SIGNATURE
/RA/ /RA/ email
/RA/ /RA/ /RA/ /RA/ DATE 07/18/2017 07/18/2017 07/24/2017
7/26/2017
07/31/2017
07/31/2017
OFFICIAL RECORD COPY