IR 05000424/2017005

From kanterella
Revision as of 14:15, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Vogtle, Units 1 and 2, Updated Inspection Plan NRC Inspection Report 05000424/2017005 and 05000425/2017005
ML17240A082
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/28/2017
From: Sandal S R
NRC/RGN-II/DRP/RPB2
To: Myers D J
Southern Nuclear Operating Co
References
IR 2017005
Download: ML17240A082 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 28, 2017 Mr. Darin Site Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT: UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 - NRC REPORT 05000424/2017005 AND 05000425/2017005

Dear Mr. Myers:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Vogtle Electric Generating Plant, Units 1 and 2

. The NRC provides the inspection plan to allow for th e resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

Also, on August 28, 2017, the NRC began the Supplemental Inspection (IP 95001) for a White finding associated with the failure to maintain a standard emergency classification scheme

. Specifically, the emergency classifications RG1 & RS1 contained effluent radiation monitor threshold values significantly different than appropriate.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice,

" a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room). Please contact me at (404) 997

-4513 with any questions you have regarding this letter.

Sincerely,/RA/

Shane R. Sandal, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos.:

50-424, 50-425 License Nos.:

NPF-68 and NPF

-81

Enclosure:

Vogtle Inspection/Activity Plan 08/01/2017-06/30/2019 Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2

- NRC REPORT 05000424/2017005 AND 05000425/2017005 August 28, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtleResource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME DMas SSandal DATE 8/23/2017 8/25/2017 OFFICIAL AGENCY RECORD

Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteVogtleInspection / Activity Plan 08/01/2017

-06/30/2019 Page 1 of 2 08/23/2017 10:31:50 95001-VOGTLE 95001 INSPECTION 41,2 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area 9500108/28/2017 09/01/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IPInservice Inspection Activities - PWR7111108P09/25/2017 09/29/2017 RP-RP PUBLIC INSPECTION 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0109/25/2017 09/29/2017 1,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0809/25/2017 09/29/2017OL EXAM-INITIAL LICENSE EXAM 41 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V2349110/06/2017 10/17/2017 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 41,2 IPDesign Bases Assurance Inspection (Programs)7111121N11/06/201711/10/2017 1,2 IPDesign Bases Assurance Inspection (Programs)7111121N11/27/2017 12/01/2017 1,2 IPDesign Bases Assurance Inspection (Programs)7111121N12/11/2017 12/15/2017TI-191-MITIGATING STRATEGIES 41,2 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19111/13/201711/17/2017 RP-RP PUBLIC INSPECTION 21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0612/04/2017 12/08/2017 1,2 IPRadiological Environmental Monitoring Program71124.0712/04/2017 12/08/2017 1,2 IPPerformance Indicator Verification7115112/04/2017 12/08/2017 EP-EP EXERCISE 61,2 IPExercise Evaluation711140105/14/2018 05/18/2018 1,2 IPEmergency Action Level and Emergency Plan Changes711140405/14/2018 05/18/2018 1,2 IPExercise Evaluation - Scenario Review711140805/14/2018 05/18/2018 1,2 IPERO Readiness71151-EP02 05/14/2018 05/18/2018 MODS-PLANT MODIFICATIONS INSPECTION 31,2 IPEvaluations of Changes, Tests, and Experiments7111117T08/27/2018 08/31/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 1 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0109/24/2018 09/28/2018 1,2 IPOccupational ALARA Planning and Controls71124.0209/24/2018 09/28/2018 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/24/2018 09/28/2018 1,2 IPOccupational Dose Assessment71124.0409/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteVogtleInspection / Activity Plan 08/01/2017

-06/30/2019 Page 2 of 2 08/23/2017 10:31:50 RP-RP OCCUPATIONAL - WEEK 1 21,2 IPOccupational Exposure Control Effectiveness71151-OR01 09/24/2018 09/28/2018 1,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 09/24/2018 09/28/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 2 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/15/2018 10/19/2018 1,2 IPOccupational ALARA Planning and Controls71124.0210/15/2018 10/19/2018 1,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/15/2018 10/19/2018 1,2 IPOccupational Dose Assessment71124.0410/15/2018 10/19/2018 1,2 IPOccupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 1,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 10/15/2018 10/19/2018OL EXAM-INITIAL LICENSE EXAM PREP 31 VOGTLE U1/ DECEMBER 2018 INITIAL EXAM AT POWER FACILITIES V2352010/29/201811/02/2018OL EXAM-INITIAL LICENSE EXAM 31 VOGTLE U1/ DECEMBER 2018 INITIAL EXAM AT POWER FACILITIES V2352011/26/2018 12/14/2018 RP-RP INSTRUMENTS 11,2 IPRadiation Monitoring Instrumentation71124.0512/03/2018 12/07/2018 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IPInservice Inspection Activities - PWR7111108P03/18/2019 03/22/2019 RP-RP RADHAZARDS 11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/18/2019 03/22/2019 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IPInservice Inspection Activities - PWR7111108P03/18/2019 03/22/2019 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51,2 IPProblem Identification and Resolution71152B04/22/2019 04/26/2019 1,2 IPProblem Identification and Resolution71152B05/06/2019 05/10/2019 EP-EP PROGRAM INSPECTION 31,2 IPAlert and Notification System Testing711140205/06/2019 05/10/2019 1,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/06/2019 05/10/2019 1,2 IPEmergency Action Level and Emergency Plan Changes711140405/06/2019 05/10/2019 1,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/06/2019 05/10/2019 1,2 IPPerformance Indicator Verification7115105/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.