ML17325B556

From kanterella
Revision as of 09:14, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed
ML17325B556
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/16/1999
From: RENCHECK M W
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17325B557 List:
References
NUDOCS 9904290045
Download: ML17325B556 (3)


Text

CATEGORY1IACCESSION NBR-FACIL:50-315 AUTH;X'TAME

'ENCHECK,M.W.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)9904290045 DOC.DATE:

99/04/16NOTARIZED:

NODOCKETDonaldC.CookNuclearPowerPlant,Unit1,IndianaM05000315AUTHORAFFILIATION IndianaMichiganPowerCo.RECIPIENT AFFILIATION RecordsManagement Branch(Document ControlDesk)

SUBJECT:

ForwardsLER99-006-00, "FuelCraneLoadsLiftedOverSFPCouldImpackEnergiesGreaterThanTSLimits,"IAW10CFR50.73,Submittal wasdelayedtoallowforresolution ofquestions.

Commitment madebylicensee, listed.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidenRpt,etc.NOTES:RECIPIENT IDCODE/NAME LPD3-1PDINTERNAL:

AEOD/SPD/RRAB NRR/DIPM/IOLB NRR/DRIP/REXB RES/DET/EIB EXTERNAL:

LSTLOBBYWARDNOACPOORE,W.NRCPDRCOPIESLTTRENCL1111111,111111111RECIPIENT IDCODE/NAME STANG,JFILECNRR/DIPM/IQMB NRR/DSSA/SPLB RGN3FILE01LMITCOMARSHALLNOACQUEENER,DS NUDOCSFULLTXTCOPIESLTTRENCL11111111111.,11111NOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISORREDUCETHENUMBEROFCOPZESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTRDESK(DCD)ONEXTENSION 415-2083FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:

LTTR16ENCL16 IndianaMichiganPowerCompanyCookNtdoatPiattrOneCookPiataeridyttlt.

Ml491066164655901INDIANANICHIGAMIaOMfKRApril16,1999UnitedStatesNuclearRegulatory Commission DocumentControlDeskWashington, DC20555Operating LicenseDPR-58DocketNo.50-315DocumentControlManager:Inaccordance withthecriteriaestablished by10CFR50.73entitledLicenseeEventReort~Sstem,thefottowtng reportisbeingsubmitted:

LER315/99-006-00, "FuelCraneLoadsLiftedOverSpentFuelPoolCouldImpartImpactEnergiesGreaterthanTechnical Specification Limits"Thefollowing commitment hasbeenidentified inthissubmittal:

~Therootcauseinvestigation forthiseventhasnotbeencompleted.

Basedontheresultsofthisinvestigation, information regarding thesafetysigniTicance ofthiscondition, including additional corrective andpreventive actions,willbeprovidedinanupdatetothisLERuponcompletion oftheinvestigation.

ThisLERwasoriginally duetobesubmitted onMarch23,1999.Duetouncertainty astotechnical issuesthatdirectlyaffectthereportability ofthisevent,submittal oftheLERwasdelayedto.allowforresolution ofquestions.

Itisrecognized thatthesubmittal ofthisdocumentexceedsthe30dayrequirement of10.CFR50.73.ACondition Reporthasbeenwrittenandenteredintothecorrective actionprogramtoaddressthisissue.Sincerely, M.W.RencheckVicePresident

-NuclearEngineering

/mbdAttachment

'gi'gi04290045 9904ihPDR,ADQCK050003i5SPDR J.E.Dyer,RegionIIIP.A.BarrettD.F.Kunsemiller R..WhaleD.HahnRecordsCenter,INPONRCResidentInspector