ML17325B557

From kanterella
Jump to navigation Jump to search
Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed
Date released: 05/31/2018 Download: ML17325B557


LER 99-006-00:on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold
ML17325B558
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/16/1999
From: Orourke B
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17325B558 (1)
Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed
ML17325B556
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/16/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17325B556 (3)