ML15279A109

From kanterella
Revision as of 17:02, 1 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

2015/10/06 NRR e-mail Capture - Millstone Power Station, Unit 3, NRC Staff Request for Additional Information - Relief Request Nos. IR-3-19,3-20,3-21 (TAC Nos. MF6570, MF6571, MF6572)
ML15279A109
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/06/2015
From: Guzman R V
Plant Licensing Branch 1
To: Craft W D
Dominion Nuclear Connecticut
Guzman R V
References
TAC 6571, TAC MF6570, TAC MF6572
Download: ML15279A109 (1)


Text

1Guzman, RichardFrom:Guzman, RichardSent:Tuesday, October 06, 2015 9:20 AMTo:'wanda.d.craft@dom.com'Subject:Millstone Unit 3 - Request for Additional Information re: Relief Request Nos. IR-3-19, IR-3-20, IR-3-21 (TAC No. MF6570, MF6571, AND MF6572)Wanda, The NRC staff is reviewing the information provided in the subject application dated July 30, 2015 (ADAMS Accession No. ML15216A363) and has determined that additional information is needed to complete its review. Shown below is the NRC staff's request for additional information. As we discussed, please provide your formal response by November 20, 2015. REQUEST FOR ADDITIONAL INFORMATION REQUESTS FOR RELIEF FOR THE THIRD TEN YEAR 10-YEAR INSERVICE INSPECTION INTERVAL MILLSTONE POWER STATION, UNIT 3, DOMINION NUCLEAR CONNECTICUT, INC DOCKET NO. 50-423 TAC NOS.: MF6570, MF6571, AND MF6572 By letter dated July 30, 2015, (Agencywide Documents Access and Management System (ADAMS), Accession No. ML15216A363), Dominion Nuclear Connecticut, Inc. (the licensee), submitted Requests for Relief Nos. IR-3-19, IR-3-20, and IR-3-21 from certain requirements of the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code (ASME Code), under the provisions of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(g)(4), for the third 10-year ISI Program for Millstone Power Station, Unit No.

3. The request for relief applies to the third 10-year inservice inspection (ISI) interval, in which the licensee adopted the 2004 Edition, no Addenda of ASME Code Section XI as the code of record.

For Requests for Relief Nos. IR-3-19, IR-3-20, and IR-3-21, please clarify the statement that welds contained in the subject relief requests were examined "using pulse echo ultrasonic instruments and search units." Specifically, provide the non-destructive examination procedure used in the subject ultrasonic examinations (e.g., ASME Code,Section XI, Appendix VIII; or Section V, Article 4; or other).

Thanks, Rich Guzman ~~~~~~~~~ RichGuzmanSr.ProjectManagerNRR/DORLUSNRC3014151030