Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23073A1802023-03-14014 March 2023 Notification of Commercial Grade Dedication Inspection (05000336/2023010 and 05000423/2023010) and Request for Information ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21112A3082021-04-22022 April 2021 Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA ML21078A0332021-03-18018 March 2021 NRR E-mail Capture - Millstone Power Station, Unit 2 - Request for Additional Information - Proposed LAR to Revise TSs for Steam Generator Inspection Frequency ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21077A1652021-02-26026 February 2021 (02/26/2021 E-mail) Draft Request for Additional Information LAR to Revise Technical Specifications for Steam Generator Inspection Frequency ML21034A5762021-02-0303 February 2021 Request for Additional Information (e-mail Dated 1/3/2021) Alternative Request RR-05-06 Inservice Inspection Interval Extension for Steam Generator Weld Inspections ML20246G5612020-09-0202 September 2020 Request for Additional Information (E-mail Dated 9/2/2020) License Amendment Request for a One-Time Deferral of the Steam Generator Inspections ML20244A2902020-08-31031 August 2020 Request for Additional Information (E-mail Dated 8/31/2020) License Amendment Request to Revise Battery Surveillance Requirements ML20231A7172020-08-18018 August 2020 Request for Additional Information (e-mail Dated 8/18/2020) License Amendment Request to Revise TS Table 3.3-11 Accident Monitoring Instrumentation ML20184A0052020-07-0202 July 2020 Request for Additional Information (E-mail Dated 7/2/2020) Relief Request IR-3-33 for Limited Coverage Examiniations ML20075A0322020-03-15015 March 2020 Request for Additional Information (E-mail Dated 3/15/2020) Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity ML20050F9212020-02-19019 February 2020 Request for Additional Information (E-mail Dated 2/19/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML20023D0372020-01-23023 January 2020 Request for Additional Information (E-mail Dated 1/23/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML19361A0382019-12-23023 December 2019 12/23/19 E-mail from R.Guzman to S. Sinha - Draft Request for Additional Information Planned Audit of LAR to Revise TS 3.8.1.1 ML19277B9082019-10-0707 October 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19248D7552019-09-0505 September 2019 Request for Additional Information Via E-mail from R.Guzman to S. Sinha Proposed License Amendment Request to Adopt 10 CFR 50.69 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19042A1822019-02-11011 February 2019 Request for Additional Information LAR for TS Changes to Spent Fuel Storage and New Fuel Storage, 02/11/2019 E-mail from R. Guzman to S. Sinha ML18291B3262018-10-18018 October 2018 Request for Additional Information LAR Regarding Proposed Technical Specification Changes for Spent Fuel Pool Storage and New Fuel Storage, E-mail from R.Guzman to S.Sinha ML18277A1762018-10-0404 October 2018 Request for Additional Information LAR to Revise TS Action Statement for Loss of Control Building Inlet Ventilation Rad Monitor Instrumentation Channels (e-mail from R.Guzman to M.Whitlock, EPID: L-2018-LLA-0099) ML18213A1152018-08-0101 August 2018 Request for Additional Information Alternative Request P-06 'C' Charging Pump (08/01/2018 E-mail from R. Guzman to M. Whitlock) ML18171A1532018-06-20020 June 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Alternative Requests for Inservice Testing Program (E-mail from R.Guzman to W.Craft) (EPID: L-2018-LLR-0012-LLR-0022) ML18137A3132018-05-17017 May 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Proposed License Amendment Request to Revise ILRT Type a and Type C Test Intervals ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) ML17033B6142017-02-0202 February 2017 Request for Additional Information, 2017/02/02 E-mail from R.Guzman to W.Craft Proposed Alternative RR-04-24 and IR-3-30 for the Elimination of Reactor Pressure Vessel Threads in Flange Examination (CAC Nos. MF8468/MF8469) ML17005A3282017-01-0505 January 2017 MPS2 EOC-23 and MPS3 EOC-17 Steam Generator Tube Inspection Reports - Requests for Additional Information ML16260A0062016-09-16016 September 2016 2016/09/16 E-mail from R. Guzman to W. Craft Request for Additional Information - License Amendment Request Realistic Large Break Loss of Coolant Accident Analysis (MF7761) ML16267A0022016-09-12012 September 2016 2016/09/12 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Revise ECCS TS and FSAR Ch. 14 to Remove Charging (MF7297) ML16133A3562016-05-12012 May 2016 E-mail from R. Guzman to C. Sly Request for Additional Information Supporting License Amendment Request to Remove Charging Credit ML16068A4142016-03-0808 March 2016 Request for Additional Information - Relief Request RR-04-19 Examination Cat R-A, Risk-Informed Piping Examinations (MF6569) ML16055A5302016-02-24024 February 2016 2016/02/24 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Adopt Dominion Core Design and Safety Analysis Methods (MF6251) ML16047A1712016-02-16016 February 2016 2016/02/16 E-mail from R.Guzman to M. Whitlock Request for Additional Information - Small Break Loss of Coolant Accident Re-Analysis (MF6700) ML16043A5232016-02-12012 February 2016 Request for Additional Information 2016/02/12 E-mail from R. Guzman to M.Whitlock Relief Requests IR-3-22 and IR-3-23 (CAC Nos. MF6573 and MF6574) ML16013A4772016-01-13013 January 2016 NRR E-mail Capture - Millstone Power Station, Units 2 and 3 - Request for Additional Information License Amendment Request for Removal of Severe Line Outage Detection (Slod) from the Offsite Power System - (MF6430, MF6431) ML16011A5172016-01-11011 January 2016 NRR E-mail Capture - Millstone Power Station, Unit 3, Reactor Vessel Surveillance Capsule Withdrawal Schedule - Request for Additional Information 2024-07-31
[Table view] |
See also: IR 05000336/2023010
Text
March 14, 2023
Daniel G. Stoddard
Senior Vice President and Chief Nuclear Officer
Dominion Energy, Inc.
Innsbrook Technical Center
5000 Dominion Blvd.
Glenn Allen, VA 23060-6711
SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF
COMMERCIAL GRADE DEDICATION INSPECTION (05000336/ 2023010 AND
05000423/2023010) AND REQUEST FOR INFORMATION
Dear Daniel Stoddard:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the commercial grade dedication baseline inspection at Millstone Power Station
(Millstone), Units 2 and 3, beginning on July 17, 2023. The inspection team will be composed of
three personnel from the NRC Region I office. The inspection will be conducted in accordance
with NRC Inspection Procedure 71111.21N.03 , Commercial Grade Dedication, dated
June 28, 2022.
The inspection will evaluate the implementation of Millstones process for dedicating
commercial-grade items, as required in applicable portions of Appendix B to Title 10 of the Code
of Federal Regulations (10 CFR) Part 50, Appendix B, to ensure reasonable assurance is
provided that these item s will perform their intended safety function. Additionally, this inspection
will evaluate im plementation of Millstones procurement process for safety-related components
as required in Appendix B.
The inspection will include an onsite information gathering visit by the team lead and two weeks
of onsite inspection by the team. The schedule for the inspection is as follows:
- Onsite Information Gathering Visit : May 15- 18, 2023
- Offsite Preparation Week: July 10- 14, 2023
- Onsite Inspection Weeks: July 17- 21, 2023, and July 31- August 4, 2023
The purpose of the onsite information gathering visit is to meet with staff expected to support
this inspection, and to become familiar with the process for dedicating commercial-grade items
and the process for procuring safety-related components at Millstone. We are aware that
portions of the commercial grade dedication and safety-related procurement process may be
handled at locations other than your site, and we will coordinate the best dates, times , and
location(s) for the onsite information gathering visit with your staff. This visit may include a tour
of onsite commercial-grade item dedication facilities, receipt inspection facilities, storage
D. Stoddard 2
facilities, and installed plant components associated with potential inspection samples. The
team lead will also review your plans for onsite inspection logistics including resources that will
be provided to the team while onsite (e.g., conference rooms, network access, printers,
monitors, etc.) and how information requests will be tracked and processed.
To minimize the impact on your staff and to ensure a productive inspection, we have enclosed
two separate request s for information needed prior to the onsite information gathering visit and
offsite inspection preparation week. The first request (Enclosure 1) is generally for information
that will be used to choose the inspection samples or information that will be applicable to all
inspection samples throughout the inspection. This information should be made available to the
team lead before May 8, 2023 . The team lead will use t his information to support preparation for
the onsite information gathering visit and selection of a list of potential inspection samples. The
second request (Enclosure 2) is for information that is more specific to the selected inspection
samples and should be made available before July 3, 2023.
Additional information requests, interviews with your staff, and/or walkdowns of facilities or
installed plant components will be made by the team throughout the inspection to complete their
review of the selected inspection samples. It is important that all documentation provided to the
team is complete and up-to-date to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an
efficient inspection, we request that a contact individual be assigned to each inspector to ensure
information requests, questions, and concerns are addressed in a timely manner.
We understand that Dan Beachy from your Regulatory Assurance organization is our contact for
this inspection. If there are any questions about the inspection or the information requested,
please contact the team lead, Manan Patel, by telephone at 610- 337-5304 or by e-mail at
Manan.Patel@nrc.gov. Enclosure 3 contains additional contact inf ormation for the inspection
team.
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150- 0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC
20555- 0001, or by e-mail to Infocollects.Resource@nrc.gov , and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB- 10202, (3150- 0011) Office of Management and
Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
2
D. Stoddard 3
This letter, its enclosures , and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading- rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
Sincerely,
Glenn T . Dentel, Chief
Engineering Branch 2
Division of Operating Reactor Safety
Docket Nos. 05000336 and 05000423
License Nos. DPR- 65 and NPF -49
Enclosures:
1. Documents Requested Prior to Information
Gathering Visit
2. Documents Requested Prior to Inspection
Preparation Week
3. Inspection Team Contact Information
cc w/ encls: Distribution via LISTSERV
3
D. Stoddard 4
SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF
COMMERCIAL GRADE DEDICATION INSPECTION (05000336/ 2023010 AND
05000423/2023010) AND REQUEST FOR INFORMATION DATED MARCH 14,
2023
DISTRIBUTION:
MYoung, DORS
SElkhiamy, DORS
JDeBoer, DORS
JBresson, DORS
JFuller, DORS, SRI
EAllen, DORS, RI
EBousquet, DORS, RI
DHochmuth, DORS, AA
PZurawski, RI OEDO
RidsNrrPMMillstone Resource
RidsNrrDorlLpl1 Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared
Documents/Commercial Grade Dedication Inspection/MS 2023/RFI/MS_RFI 21N.03 -
Commercial Grade Dedication - 7.17.2023.docx
ADAMS ACCESSION NUMBER: ML23073A180
x SUNSI Review x Non-Sensitive x Publvlle
Sensitive n -Publiclyvlable
OFFICE / /
ME MPat GDent
TE 03/14/2023 03/14/2023
OFFIAL RERD COPY
4
Enclosure 1
Documents Requested Prior to Information Gathering Visit
The documents and information requested below should generally be made available to the
inspection team for the team's use both on- site and off-site during the information gathering
visit. Electronic format is the preferred media. If electronic media is made available via an
internet based remote document management system, then the remote document access must
allow inspectors to download, save, and print the documents in the NRC's regional office.
Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of
the inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
Documents requested by May 8, 2023 (Prior to the Information Gathering Visit):
1. Licensing basis documents such as the updated final safety analysis report and
technical specifications.
2. Procedures for dedicating commercial- grade items and for procurement of safety-
related components. This should include procedure for controlling counterfeit,
fraudulent, and suspect items and, if applicable, procedures that address
requirements associated with the parts quality initiative (PQI).
3. List of commercial-grade items, with a brief description of application, that have been
dedicated for safety-related applications. These items may be dedicated by Millstone
Power Station, Units 2 and 3 or dedicated by a vendor (or other licensee) and
procured by Millstone Power Station, Units 2 and 3. Please note whether the item
has been installed in the plant. The list should encompass the past six years of
dedication activities. The list should identify the systems/components where the
items were installed or were intended to be installed for use. It should also identify
whether the item has been installed.
4. List of components procured as safety-related, with descriptions, if not included
above. Please note whether the item has been installed in the plant. The list should
encompass the past six years of procurement activities. The list should identify the
systems/components where the items were installed or were intended to be installed
for use. It should also identify whether the item has been installed.
5. List of corrective action program documents, with descriptions, associated with
commercial-grade items, safety-related procurement, receipt, or storage. The list
should include any items that failed while in service after completing the dedication
or safety-related procurement process. It should encompass the past six years of
these activities and should identify the systems/components where the items were
installed. The list should also identify the vendor who supplied the associated item.
Enclosure 1
6. List components procured as safety-related or commercial-grade items intended to
be dedicated for safety-related applications that are on hold because of concerns
identified during receipt, dedication, or from operating experience/corrective action
program as applicable. The list should identify the systems/components where the
items were intended to be installed for use.
7. List of components procured as safety-related or commercial-grade items dedicated
for safety-related applications, in the past six years, where the
procurement/dedication process was expedited to support rapid turnaround (less
than seven days). If possible, the list should identify the systems in which these
items were intended for use.
8. List of systems, system numbers/designators, corresponding names, and risk -
ranking.
9. Copies of any self-assessments/audits of the safety-related procurement or the
commercial-grade dedication and procurement processes that were completed within
the two- years prior to the start date of this inspection.
10. List of site contacts that will be associated with the inspection and a copy of
qualifications, as applicable, of personnel who performed commercial-grade
dedication, safety-related component procurement, and/or receipt inspection/testing
activities within the past six years
2
Enclosure 2
Documents Requested Prior to Inspection Preparation Week
For the samples selected by the team lead and provided to your point of contact following the
information gathering visit, the documents and information requested below should generally be
made available to the inspection team for the team's use both on- site and off-site during the
inspection. Electronic format is the preferred media. If electronic media is made available via an
internet based remote document management system, then the remote document access must
allow inspectors to download, save, and print the documents in the NRC's regional office.
Paper records (hard copy) are acceptable when necessary. At the end of the inspection, the
documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below for
each sample.
Documents requested by July 3, 2023 (Prior to Preparation Week):
1. Purchase requisition and purchase orders.
2. Other pertinent vendor/licensee correspondence.
3. Original and updated design specifications.
4. Catalog specifications.
5. Procurement basis evaluation such as like -for-like, equivalency, plant design change
packages, drawing and specification updates.
6. 10 CFR 50.59 documentation, if required.
7. Material receiving reports, packing lists/invoices, and other shipping documents.
8. Receipt inspection reports and any related test reports.
9. Other documents to trace the item from the time it was dedicated to the time it was
installed, tested, and accepted.
10. Certificates of conformance/compliance/quality.
11. Vendor test and inspection reports.
12. Third- party or sub vendor test and inspection reports.
13. Shelf-life information.
14. Vendor dedication/partial dedication information.
Enclosure 2
15. Design/material/process change history information.
16. Completed commercial- grade dedication document including safety classification,
identification of safety functions/application requirements, identification of critical
characteristics, identification of verification methods and acceptance criteria for the
critical characteristics, evaluation of credible failure modes, if applicable, and
identification of the suppliers quality assurance program that meets 10 CFR Part 50,
Appendix B.
17. Any deviation from design, material, and performance characteristics relevant to the
safety function (nonconformance dispositions).
18. Documents showing objective evidence such as special test and inspection
procedures and results, commercial-grade survey reports-item, design, material, and
specific performance characteristic (relevant to safety function), and source
inspection reports.
19. Completed post-installation test procedure and results.
20. Completed stock or material issue forms and installation work orders or reports.
21. Historical performance information.
2
Enclosure 3
Inspection Team Contact Information
Manan Patel (Lead) Javier Brand Eric Miller
Senior Reactor Inspector Reactor Inspector Reactor Inspector
610- 337- 5304 610- 337-5 346 610- 337- 5116
Manan.Patel@nrc.gov Javier.Brand@nrc.gov Eric.Miller2@nrc.gov
Mailing Address:
U.S. NRC, Region I
Attn: Manan Patel
475 Allendale Road
STE 102
King of Prussia, PA 19406-1415