ML20009A342
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20009A342 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 07/06/1981 |
From: | Hood D Office of Nuclear Reactor Regulation |
To: | |
References | |
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8107100110 | |
Download: ML20009A342 (2) | |
Similar Documents at Midland | |
---|---|
Category:ARCHIVE RECORDS
MONTHYEARML20094J5411984-07-18018 July 1984
[Table view]Design Audit on 820728 of Auxiliary Bldg & Svc Water Pumping Structure.Diesel Generator Bldg Structural Analysis for Settlement,Bearing Capacities & Summary of 820721 Meeting W/ CPC Encl ML20094K3941983-06-30030 June 1983 Handwritten Record of Conference Call on 830630 W/Cpc, Bechtel,Nrc & Gei Re Drilling at Cast Hole in Top of Pier ML20081J6641983-06-29029 June 1983 News Articles Discussing Facility Const Completion Dates ML20081G1011983-06-0808 June 1983 Slide Presentation Entitled, Overview of Midland Independent Design & Const Verification Program, Presented to P Keshishian & G Gower ML20151H3771983-04-22022 April 1983 Record of 830331 Telephone Discussion Re Use of Appropriate ASME Code.Util Proposes to Use App F of 1980 ASME Code for Qualification of Pressurizer Support Lugs Rather than 1968 ASME Code Used for All Other Components ML20094G3561983-03-15015 March 1983 Presentation of Const Project Evaluation of Consumers Power Co,Midland Energy Ctr Project,Units 1 & 2. Handwritten Notes Re Gap Discovery Request & Nonconformance Rept Encl ML20079R2391983-03-14014 March 1983 Press Release Discussing Pier 9 Excavation,Divers Working in Pond,Welder Certification Program,Circulating Water Pump Motors Testing,Cable Reinsp & Work Support Evaporator Testing ML20080E6751983-02-24024 February 1983 News Article, Wrongful Discharge Suit Names Consumers, Zack ML20091F6051983-02-0808 February 1983 Presentation Entitled Midland Idvp for Auxiliary Feedwater Sys & Another Sys to Be Determined, Presented at 830208 Meeting.W/Oversize Chart Re Working Schedule for Const Completion Program.Aperture Card Available in PDR ML20081J7671982-12-28028 December 1982 News Articles Entitled, Test of Emergency Plans at Nuclear Plant Postponed & More Delays Mark Yr for Nuclear Plant Project ML20235B7191982-09-10010 September 1982 Partially Deleted Nonconformance Rept of Welding at Plant. Socket Welds Found to Be Below Listed Requirements Should Be Processed in Listed Manner ML20081J8251982-08-19019 August 1982 Midland Review, Vol 1,Number 39.Supporting Documentation Encl ML20094H4851982-07-13013 July 1982 Audit Rept M01-602-2 Re Audit Conducted at Zack Co on 820517-20 ML20024A1721982-07-12012 July 1982 Telcon W/B Garde,Govt Accountability Project on 820624 Re Allegations Concerning QA Program at Zack Co.Personally Indentifiable Info Deleted ML20094H4901982-05-14014 May 1982 Audit Rept M0-601-2 Re Audit Conducted of Zack Co on 820419- 22 to Verify Zack Co Compliance W/Program Requirements as Defined in Zack QA Manual,Plant QC Procedures & Weld Procedure Specs.Related Info Encl ML20094J3971982-03-26026 March 1982 Telcon W/Applicant & Bechtel on 820326 Re Adoption of Soil Spring Constants,Settlement Monitoring During Svc Water Structure Underpinning & Const Dewatering ML20091P3011982-03-12012 March 1982 Telcon W/Bechtel,Util & NRC on 820312 Re Remedial Soils Work ML20090B3881982-01-12012 January 1982 Slide Presentation Entitled Midland Project QA Organizational Change, Presented at 820112 Meeting in Glen Ellyn,Il ML20009A3421981-07-0606 July 1981 Summary of 810624 Telcons W/Util & G Keeley Re Monitoring Program Planned for Surcharging of Valve Pit Portion of Borated Water Storage Tank Foundation & Diesel Generator Bldg Lab Test Schedule,Respectively ML20126L9691981-05-18018 May 1981 Telcon on 810518 W/Util & Vendor Re Permanent Plant Dewatering ML20004E0361981-04-30030 April 1981 Selected Viewgraphs from 810430 Meeting ML20094H9671981-04-20020 April 1981 Provides Structural Audit on 810420 for Reactor Vessel Support Sys ML20004F2481981-04-15015 April 1981 Slide Presentation Entitled Fire Protection Design ML20003E3061981-03-24024 March 1981 Telcon on 810320 W/G Keeley (CPC) Re Soil Borings Schedule Per Util Decision to Authorize Soils Borings & Testing Requested by NRC & Army Corps of Engineers ML19347D0271981-03-0505 March 1981 Slide Presentation Re Final Design Review Presentation at 810326 Meeting of Util Design Review Board.Responses to NRC Questions Encl ML20062K9881980-12-0505 December 1980 Viewgraphs Presented at 801205 Meeting ML19345B7121980-10-29029 October 1980 Slide Presentation for 801029 Meeting Re Operator Training & Qualification ML20094K1241980-10-0303 October 1980 Telcon W/J Linsley on 801003 Re R Vollmer Decision on Applicant Appeal for Relief from Original 18 Borings ML19351G2371980-08-29029 August 1980 Slide Presentation for 800829 Meeting in Midland,Mi Re Request for Relief from NRC Position Requiring Addl Borings & Tests of Plant Fill ML20125B8061979-11-15015 November 1979 Audit on 791105-15 of Small Pipe Design & Stress Groups, Including QA Findings.Qa Requests,Mgt Corrective Action Repts,Nonconformance Repts & Other Supporting Documentation Encl ML19252A0371979-09-25025 September 1979 Nonconformance Rept for Aug 1979.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19263C7611979-02-22022 February 1979 Monthly Nonconformance Rept for Jan 1979 ML20095A0681978-11-29029 November 1978 News Article Re Bldg for Backup Unit at Nuclear Plant Sinking.Sinking Caused by 20 Ft Rise in Local Water Table ML20197D3691978-11-22022 November 1978 Nonconformance Rept for Oct 1978.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329G3461978-10-25025 October 1978 Nonconformance Rept for Sept 1978 Consisting of Nonconformance Rept Log on Open Items,Quality Action Requests,B&W Repts of Nonconformity & Util Nonconformance Repts Written or Closed During Month ML19331A2621978-07-31031 July 1978 Nonconformance Rept for Jul 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0551978-06-30030 June 1978 Nonconformance Rept for June 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0221978-05-31031 May 1978 Nonconformance Rept for May 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E8831978-04-30030 April 1978 Nonconformance Rept for Apr 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2291978-03-31031 March 1978 Nonconformance Rept for Mar 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1901978-02-28028 February 1978 Nonconformance Rept for Feb 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1891978-01-31031 January 1978 Nonconformance Rept for Jan 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2421977-12-31031 December 1977 Nonconformance Rept for Dec 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5211977-12-31031 December 1977 Nonconformance Rept 19 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Oct-Dec 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19331A2141977-12-31031 December 1977 Nonconformance Rept for Dec 1977.rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E8871977-11-30030 November 1977 Nonconformance Rept for Nov 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0311977-10-31031 October 1977 Nonconformance Rept for Oct 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformane Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings Mgt Corrective Action Repts Written or Closed During Month ML19329F0181977-09-30030 September 1977 Nonconformance Rept for Sept 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5491977-09-30030 September 1977 Nonconformance Rept 18 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jul-Sept 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19329E9401977-08-31031 August 1977 Nonconformance Rept for Aug 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month 1984-07-18 Category:TELEPHONE OR VERBAL CONVERSATION RECORD MONTHYEARML20094K3941983-06-30030 June 1983
[Table view]Handwritten Record of Conference Call on 830630 W/Cpc, Bechtel,Nrc & Gei Re Drilling at Cast Hole in Top of Pier ML20151H3771983-04-22022 April 1983 Record of 830331 Telephone Discussion Re Use of Appropriate ASME Code.Util Proposes to Use App F of 1980 ASME Code for Qualification of Pressurizer Support Lugs Rather than 1968 ASME Code Used for All Other Components ML20024A1721982-07-12012 July 1982 Telcon W/B Garde,Govt Accountability Project on 820624 Re Allegations Concerning QA Program at Zack Co.Personally Indentifiable Info Deleted ML20094J3971982-03-26026 March 1982 Telcon W/Applicant & Bechtel on 820326 Re Adoption of Soil Spring Constants,Settlement Monitoring During Svc Water Structure Underpinning & Const Dewatering ML20091P3011982-03-12012 March 1982 Telcon W/Bechtel,Util & NRC on 820312 Re Remedial Soils Work ML20009A3421981-07-0606 July 1981 Summary of 810624 Telcons W/Util & G Keeley Re Monitoring Program Planned for Surcharging of Valve Pit Portion of Borated Water Storage Tank Foundation & Diesel Generator Bldg Lab Test Schedule,Respectively ML20126L9691981-05-18018 May 1981 Telcon on 810518 W/Util & Vendor Re Permanent Plant Dewatering ML20003E3061981-03-24024 March 1981 Telcon on 810320 W/G Keeley (CPC) Re Soil Borings Schedule Per Util Decision to Authorize Soils Borings & Testing Requested by NRC & Army Corps of Engineers ML20094K1241980-10-0303 October 1980 Telcon W/J Linsley on 801003 Re R Vollmer Decision on Applicant Appeal for Relief from Original 18 Borings 1983-06-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20009A342&oldid=4658115"