e.,.,

n M

T 8m V

w w

-e MAR 2 4 1981 l +,x Docket Nos.: 50-329/330 MEMORANDUM FOR: File

]

y,;a 2 71931

  • 7

"fSIY" FROM:

D. Hood 9

Y7/p _g'[

SUBJECT:

TELECON ON MIDLAND S0ILS BORING SCHEDULE y

t L..~

Participants Consumers NRC Coros of Enaineers (COE)

G. Keeley J. Kane R. Erickson D. Budzik L. Heller R. Gehring J. Brunner, Esq.

D. Hood H. Singh Mr. Keeley, et.al., called at 11:00 on March 20, 1981. Following up on an earlier call in which Vice President J. Cook advised us of Consumers decision to authorize the soils borings and testing requested by the NRC and COE (see telecen sunr.ary of 3/13/81), fir, Keeley indicated the following schedule:

- Start soil borings

- t' arch 25,1981 (beginning with the pond dike)

- Start of Laboratory testing - April 1,1981

- Completion of borings

- About April 25, 1981

- Completion of Laboratory testing - June 8,1981 i

l Mr. Keeley identified Woodward and Clyde Associates, Inc. as the subcontractor for both the borings and lab testing. The contract was l

signed 3/18/81. Consumers is contracting directly, rather than using i

Bechtel. Mrz M. " Rom" Ramanujam, (517) 788-5816, a new geotechnical engineer with Consumers, will be the principal technical contact for the pro,iect.

Rom is meeting today with Dr. Peck and with Woodward and Clyde negarding the technical details of the contract and will determine a l

more detailed break out of the schedule. Rom will make a follow-up call with J. Kane and H. Singh 3/23/81 with these further details.

l Mr. Keeley stated that the compressed schedule was geared to the hearing l

(presently set to start in mid-June 1981). Three sep rate boring i

rigs will be_used. Testing will_ be conducted at the Woodward and Clyde

. laboratory.

h

__~

~ k-W w

s;'

wJ

%d

.gg MAR 2 4 1981 Mr. Keeley also advised that a letter to the flRC on Consumers recent decision to change the support concept for part of the Service Water Intake Structure over fill will be mailed today. The possibility that the revised concept might alter the need for borings in this vicinity will te discussed during the 3/23/81 call.

NRC requested a copy of the contract specification for the boring and testing program to better understand the scope of the program.

Darl Hood, Project Manager Licensing Branch No. 3 Division of Licensing cc:

J. Kane (2)

L. Heller G. Lear J. Knight R. Vollmer F. Rinaldi (2)

A. Cappucci (2)

R. Gonzales J. Kimball R. Shewr.aker E. Gallagher R. Cook (RIII)

R. Knop W. Paton 1

l l-l i

I l

l c,..cr y DL:LB#

t;....D(:LB#3 lia

,,,, [,

[

i

~~'-oi.;DSHood,:jbjF

(

l oatt.@ 3/ d/81 I

3, 81 1

i

.g

~

.a::: ; u e: u a: 1:: 4:

O FFlC La L R I C O 3 2 C O. ','

m + -.

So Cec UNITED STATES

[ h m y?oi NUCLEAR REGULATORY COMMISSION 7,1

.j WASHINGTON, D. C. 20555 g

e J'

MAR 2 4 1981 l' ^

g Docket Nos. :

50-329/330

()

( UL

[

9 ER 2 I 1981

  • MEMORANDUM FOR:

Fi1e O

v.s. m e s s =5 * *** d FROM:

D. Hood S'

5""'"*"

h

SUBJECT:

TELECON ON MIDLAND SOILS BORING SCHEDULE

/

Participants Consumers NRC Coros of Enaineers (COE)

G. Keeley J. Kane R. Erickson D. Budzik L. Heller R. Gehring J. Brunner, Esq.

D. Hood H. Singh Mr. Keeley, et.al., called at 11:00 on March 20, 1981.

Following up on an earlier call in which Vice President J. Cook advised us of Consumers decision to authorize the soils Scrings and testing requested by the NRC and COE (see telecon summary of 3/13/81), Mr. Keeley indicated the following schedule:

- Start soil borings

- March 25, 1981 (beginning with the pond dike)

- Start of Laboratory

', ting - April 1, 1981

. Completion of boririgs

- About April 25, 1981

- Completion of Laboratory testing - June 8,1981.

l Mr. Keeley identified Woodward and Clyde Associates, Inc. as the subcontractor for both the borings and lab testing. The contract was signed 3/18/81.

Consumers is contracting directly, rather than using Bechtel. Mr. M. " Rom" Ramanujam, (517) 788-5816, a new geotechnical engineer with Consumers, will be the principal technical contact for the project.

Rom is meeting today with Dr. Peck and'with Woodward and Clyde l

regarding the technical details of the contract and will determine a l

more detailed break out of the schedule.

Rom will make a follow-up l

call with J. Kane and H. Singh 3/23/81 with these further details.

I Mr. Keeley stated that the compressed schedule was geared to the hearing (presently set to start in mid-June 1981). Three separate boring rigs will be used. Testing will be conducted at the Woodward and Civde laboratory.

p 2 4 ISOI Mr. Keeley also advised that a letter to the NRC on Consutars recent decision to change the succort concept for part of the Service Water Intake Structure over fill will be mailed today. The possibility that the revised concapt might alter the need for borings in this vicinity will be discussed during the 3/23/81 call.

NRC requested a copy of the contract specification for the boring and testing program to better understand the scope of the program.

'71 -rh /W Darl Hood, Project Manager Licensing Branch No. 3 Division of Licensing ec:

J. Kane (2)

L. Heller G. Lear J. Knight R. Vollmer F. Rinaldi (2)

A. Cappucci (2)

R.-Gonzales J. Kimball R. Shewmaker E. Gallagher R. Cook-(RIII)

R. Knop W. Paten 1