Text
_ _ _ _ _ - _ _ _ _ _ _ _.
,=,p*** Coy, jf
_p,,
UPdTED STATES g
g-NUCLEAR REGULATORY COMMISSION i
3
- E WASHINGTON. D. C. 20555
%,..... gh ALABAMA POWER COMPANY DOCKET NO. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT,-UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 24 License No. NPF-2
~1.
.The Nuclear Regulatory Commission (the Commission) has found that:
A.
The request for amendment by Alabama Power Company (the licensee) dated August 7.1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the' public, and (ii) that such activitir,t will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commis: ion's regulations and all applicable requirements have been satisfied.
m 8109160277 81 CHM 27 PDR ADOCM 0500 P
a.[,; -.-
s
~
.. 2 -
- 2.' : Accordingly, the license'is amended by changes to the Technical Specifications as indicated in the -attachment to this-license
~
- amendment,.and paragraph 2.C.(2).of Fa:111tyl Operating License No. NPF-2 is hereby amended to read-as :follows.
- (2). Technical Specifications The Technica-1; Specifications contained in Appindices A1and B, as' revised through Amendment'No. 24, areL r
.hereby incorporated in the license.
The licensee shall operate the facility in accordance with-the Technical Speci fica tions.-
3.
._This' license : amendment -was ef fective. August' 7,.1981.
F0f 'THE NU,LEArt EGULATORY.COMMISSI0ii eve rga 0perating Reactors Hanch'No. 1 Division-of-Licensing
Attachment:
Changes to the -Technical
~
Specifications Date of Issuance:
AUD 2 71981 b
g i.
1 l-f ;-
\\~
i e
4 g
~
. +. _,..
ATTACHMENT TO LICENSE AMENDMENT AMENDi4ENT NO. 24 TO FACILITY OPERATING LICENSE NO. NPF-2 00CKET NO. 50-348 Revise Appendix A as follows:
Remove Pages Insert Pages 3/4 8-1 3/4 8-1 3/4 8-2 3/4 8-2 e
9 I
9 O
M.a
- u... s w u, <. r e...~ a n z u w.o 3/.3.1 A.C. SCUPCES C???ATING LIMITING CONDITION FCR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical'peuer sources shall be CFIPABLE:
a.
TWo physically independent circuits frcm the offsite transmission network to the switchyard and two physically indipendent circuits frcm the switchyard to the ensite Class IE distribution system, and b.
Two separate and independant diesel generator sets (one 4075 Kw and one 2350 Ku) each with:
1.
Septiete day tanks cent.aining a minimum volume cf 900 Sallens of fuel f.cr the 4075 ku diesel generators and 700 callens of fuel for the 2550 kw diesel generators.
2.
A separate fuel transfer pump for each diesel.
c.
A fuel storage system consisting of fcur independent storage tanks each centaining a minimum of 25,000 gallens of fuel.
At? tic *EILITY:
MODES 1, 2, 3 and 4.
ACTICI(:
a.
With either an of fsite circuit or a diesel generator set of the above required A.C. electrical power sources inoperable, demon-strate the OPERABILITY of the remaining A.C. scurces by per-ferming Surveillance Recuirements a.8.1;}.1.a and 4.8.1.1.2.a.4 within ene hour and at least cnce per 8 hcurs thereaf ter; restore at least two offsite circuits and both diesel. generator sets to 0FEFASLE status within 72* hours er be in at least HOT STARE"Y sithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the fo'.
ving 30 hcurs.
b.
With one offsite circuit and one diesel gene.ator set of the above required A.C. electrical pcwer sources inoperable, demen-strate the OPERASILITY of the remaining A.C. sources by perform-ing Surveillance Recuirements 4.8.1.1.1 a and 4.8.1.1.2.a.4 within ene hour and at least once per 8 nours thereaf ter; restcre at least ene of the incperable sources to C? ERA 3LE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STAND 5Y within the next 6.icurs and in COLD SMUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Restore at least two offsite circuits and bcth diesel generator sets to OPERABLE status within 72* hcurs frcm the time cf initial loss or be in at least HOT STAND 3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN with:r tbc following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
"Ona time cnly exception for repair or Diesel 1C - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement' for operability of Diesel IC may be extended to a period of 15 days provided l
Diesel 1C is returned to OPERABLE status as soon as maintenance is completed.
The crovision's of specification 3.0.4 are not applicable for thi's one time change.
- 0ne time only exception during repair of Diesel IC - the 5 hcur interval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
REND." INT NO. 71 JFf 24 FARLEY-UNIT 1 3/4 8-1
,'j.(LECTEICdPO*lERSYSTEMS:
ACTIC'i~(Continued)
- c.
tlith two of the above recuired offsite A.C. circuits inser-able, demonstrate the OPEPA3!LITY of both diesel generator sets by performing Serveillance Requiremnt.4.8.1.1.2.a.4 within ene hour and at least once par 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> th?reafter, unless the diesel ganerators are already operating; restore at.
least' ene of the inoperable offsite sources to 0? EPA 3LE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANC3Y uithin the next S hours.
I:ith only one offsite source restored, restere at least two offsite qircuits to OPEPA3tE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> frca time of. initial loss or be in at least NOT STAND 3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT 00.0: within the folicwing 30
.hcurs.
d.
1lith both of the abcVe required diesel generator sets inoperable, demcnstrate the OPE?A31LITY of two offsite A.C. circuits by parforming Surveillance Requirement 4.8.1.1.1.a within one hcur and at least ence per 8 heurMhereafter; restore at least ene of the inc;erable diesel generator sets to OPEPA3LE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STAND 3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. - Restore both diesel generator sets to OPEPABLE status within 72* hours. from time of initial loss or be in at least HOT e
STANC3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDO*.ci within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REOUIREMENTS 4.8.1.1.1 Each of the above independent circuits between the offsite transmission netwcrk and the ensite Class 1E distribution system shall be:
I a.
Cetermined OPEPA3LE at least once per 7 days by verifying correct breaker alignments, indicated pcwer availability, and i
b.
Camenstrated OPEPASLE at least once per 13 cenths during shut-down by transferrir.g unit power supply frcm the normal circuit to the alternate circuit.
4.S.1.1.2 Each diesel generator set shall be demonstrated OPE?ABLE:
a.
At least once per 31 days, on a STAGGERED TEST 3 ASIS, by:
1.
Verifying the fuel level in the day tank, 2.
Verifying the-fuel level in the fuel storage tenk's,
'Cne time only exception for repair of Oiesel IC - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement, for operability of Diesel IC may be extended to a period of 15 days provided l
Diesel 1C is returned to OPERABLE status as soon as maintenance is comoleted.
The provisions of specification 3.0.4 he not applicable for th'is one time Lchange.
"One. time cnly exception during repair of Diesel IC - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
AMENDnENT 20. fd,,2f 24 FARLEY-UNIT 1 3/4 8-2
[~
p* 9'%
i
. 4
'o, UNITED STATES 2'
NUCLEAR REGULATORY COMMISSION
-a f
,E WASHINGTON, D. C. 20555 h,
l.
I I
ALABAMA POWER COMPANY DOCKET N0. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY LICENSE-Amendment No. 6 License No. NPF-8 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The request for amendment by Alabama Power Company (the licensee),
t dated August 7 - 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; i
C.
There is reasonable assurance (i) that the activities authorized j
by this amendment can be conducted withot'c endangering the health and safety of the public, and (ii) that s'uch activities will be conducted in compliance with the Commission's regulations; i.
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the publ.ic; and E.
The issuance of this amendment is in accordance'with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
r
~.....
y.
,f'
'N e 2 --
- 2. _ Accordingly..the license is amended-by changes to the Tes.hnical Specifications as. indicated-in the attachment to this license
~ amendment,,and : paragraph 2.C(2) of Facility License No. HPF-8
.is hereby' amended.toiread as follows:
'(2) Technical-Specifications and Environmental Protection Plan
- The Technicai' Specifications contained in Appendix A as'. revised-through Amendment-No. 6,-and the Environmental Protection Plan,
\\ppendix'B, are hereby incorporated into the. license.
The licensee shall operate the facility in accordance with the.
Technical Speci.fications.
3.-
This licinse -amendment was effective August 7,1981.
- FC R THE NUCLEAR R" LATORY COMMISSION f --
3 how
, a4 t
Ieven A. Varga, Chie ' \\
Operating' Reactors B a ch No. 1 Division-of_licensin Attachment :
Changes to the Technical
~
Specifications Date of Issuance:
AUG 2 71981 e
'E i
4 S
f 4
= 1-
r -
ATTACHMEfiT TO LICEtiSE AMEfiDMEfiT fl0. 6 FACILITY LICEftSE fl0. fiPF-8 DOCKET f40. 50-364 Revise Appendix A as follows:
Remove Old Pages Insert Revised Pages 3/4 8-1 3/4 8-1 3/4 8-2 3/4 8-2 3/4 8-3 3/4 8-3 4
e S
e 4
( L.
Y.
-32^.S. ELECTRICAL' POWER 5YSTEM5 3/4.8.1
-A.C.
SOUP.CES
-0?EP.ATING LIMITING CONDITION FOR' OPERATION
~
-3. 8.1.1 ' As a.cinicum, the folicwing A.C. electrical power sources shall be C? ERA 3Lc:
+
a.
Two physically independant circuits between the offsite transmission network to the switchyard and two physically independant circuits frem the switchyard to the onsite Class 1E distribution systac, and b.
Two separate' and indepen3ent diesel generator sets (Set A:
DG11-2A and CG-1C, Set 3: "OG-2B and OG-2C) each with:
1.
Separate day tanks containing a minimum volute of S00 gallens of fuel for the 4075 ks diesel generators and 700 gallons of fuel for the 2850 kw diesel generator.
2.
A separate fuel: transfer pump for each diesel.
c.
A fuel storaga system consisting of four, independent ~ storage tanks each containing a minimum of 25,000 gallons of fuel."
A?PLICASILITY:
MODES 1, 2, 3 and 4.
ACTICN:
a.
With an offsite circuit inoperable, demonstrate the OPERA 3ILITY cf the recaining A.C. sources by perforcing Surveillance Iequirements 4
- 1.1.1. a and 4. 8.1,.1. 2. a.4 within one hour and as 'aust once per 8
.urs thereafter; restore at least two of fsite circuits o OPE 8ABLE strtus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at legst HOT STAND 5Y vithin the next S hours and in COLD SHUTOOWN within the folicwing 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.
b.
With one diesel generator set inoperable, demonstrate the operability of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />'s lbere?Tter.
Restore both diesel generator setsJto OPERABLE-i status withir. 72'f.ours or comply with the folicwing:
1)
Be in at least HOT STANO3Y within the next 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and in COLD SHUTDOWN within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
-One inoperable fuel storage tank is equivalent to one inoperable dieseT generator set.
Diesel 1C is returned to ' OPERABLE status as soon as maintenance,is completed.
.The provisons of specification 3.0.4 a're not applicable 'for this one time change.
=**0ne time only exception during repair of Diesel IC - the 8 hcur interval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
FARLEY-UNIT 2 -
3/4 8-1
~
AMENOMENT NO. 2,7 6
. ELECTRICAL POWER SYSTEMS J
ACTICN (Continutd) 2)
One diesel generator set cay be made' inoperable for up to 14 days to perform scheduled =aintenance and testing on diesel generators 1C (or 2C) providad all the folicwirig are satisfied:
a)
Unit 1 is in !<0DE'5 or 6 cad appropriate technical specifica-tiens covering the diesel generator sets are satisfied.
b)'
The remaining' Unit 2 diesel ganarators 1-2A, 23, 1C (or 2C) are OPERA 3LE.
c)
The service water system is recirculated to the pond and s.urveillance requirement 4.7.6.2.1 is verified prior to removing IC (or 2C) frcm service and once per S hot.rs thereafter. -
d)
Diesel benerator 1C (or 2C) is returned to CPERA3tE status-as soon as mair,tenance is.cc:pleted.
Othe wise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SMGD0bH within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With one offsjte circuit and one diesel generator set of the above c.
required A.C. electrical powar sources inoperable, demonstrate the OPERA 5ILITY of the recaining A.C. sources by performing Surveillance 1.1.1.a and 4.8.1.1.2.a.4 within one hou. and at-Requirements 4.3,leurs thereafter; restore at least one of the least'once per 8 inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be.in at least HOT STAND 5Y within the next 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and in COLD SHUTDOWN within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Restore at least two offsite circuits and both diesel generator sets to OPERA 5LE status within 72-hours from the time of initial loss or be in at least M0T STANO3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.
d.
With two of the above required offsite A.C. circuits inoparable, demonstrate the OPERAEILITY of both diesel generator sets by performing Surveillance Requirement 4.8.1.1.2.a.4 within one hour and at least once per S hours thereafter, unless the diesel generators are already operating; restore at least one cf the z
incperable offsite ' sources to 0PERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STA!iDBY within the' next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, restore both offsite circuits to OPERAELE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTCCWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- Cne time only exceptien for repair of Diesel IC - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statacent for operability of Diesel IC may be extended to a ceriod of 15, days provided l
Diesel 1C is returned to OPERASLE status as soon as maintenance is completed.
The provisions of specification 3.0.4 are not cpplicable for this one time change.
- 0ne time only exception during repair of Diesel IC - the S hcur interval test is extended to 72 i,ours.
FARLEY-UNIT 2.
3/4 8-2 AMCiDMEiT NO. 216 L
ELECTRICAL 701:ER SYSTEMS-3 ACTIC'!:.(Ccntinued) e; Uith both of the above required diesel generator sets inoperable, demonstrate the OPERASILITY of two offsite A..C. circuits by performing Surveillance Recuirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and w least once per S hours *thereafter; restore at least ene of the inoperable diesel generator sets to OPERASLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STAND 3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTCOWN within.the follouing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
P.estore both diesel generator sets to CPERA3LE status within 72* hours from time of
-initial loss or be 'in least HOT STAND 5Y within the next 6 hcurs '
and in COLD SHUTD7..M within the fcilowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
S'.*:.VIILLANCE REOUIREMENTS
" 2.1.1.1 Each of the above rehired indepencent circuits between the offsite
.trans-ission network and the onsite Class IE distributien system shall be:
a.
Determined OPEPA3LE at least once per 7 days by verifying correct breaker alignments, indicated power availability, and b.
Demonstrated OPEPASLE at least once per 18 months during shutdown by transferring unit pcuer supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each diesel generator shall be demonstrated OPEFABLE:
a.
In accordance with the frequency specified iit Table 4.8-1 on a STAGGERED TEST BASIS by:
1.
Verifying the fuel level in the day tank, 2.
Verifying the fuel level in the fuel storage tanks, 3.
Verifying the. fuel transfer pump can be started and transfers fuel from the storage system to the day tank, 4.
Verifying the diesel starts from ambient condition and accelerates to at least 900 rpm, for the 2S50 kw generator and 514 rpm for the 4075 kw generators, in less than or equal to 10 seconds.
The generator voltage and frequency shall be 13552 volts and a 57 Hz within 10 seconds after the start signal.
5.
Verifying the generator is synchronized, Icaded to greater than or equal to its continuous rating, and operates for greater than or equal 60 minutes,
-One time only exception for repair of Diesel IC - 72 hcur action statement for operability of Diesel IC may be extended to a peried of 15 days provided l
Diesel 1C is returned to OPERABLE status as soon as maintenance.is completed.
The provisions of specification 3.0.4 a're not applicable for this one time change.
- 0ne time only exception during repair of Diesel IC - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> intet val test
'is-extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.