Notice of Issuance & Availability of Amends 24 & 6 to Licenses NPF-2 & NPF-8,respectively
ML20030D800
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/27/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20030D793 List:
References
NUDOCS 8109160283
Download: ML20030D800 (3)


Text

T

~

g 7590-01 0

UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N05. 50-348 AND 50-364

' ALABAMA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Come,ission (the Commission) has issued Amendment No. 24 to Facility Operating License No. NPF-2 and Amendment Fo. 6 to Facility Operating License No. NPF-8 issued to Alabama Power Company

'(the licensee), which revised Technical Specifications for operation of the Joseph M. Farley Nuclear Plant, Unit Nos.1 and 2 (the facilities) located in Houston County, Alabama.

The amendments were effective August 7, 1981.

On July 31, 1981, Amendment No. 21 to Facilit / Operating License No.

NPF-2 and Amendment No. 3 to Facility Operating License No. NPF-8 authorized a six day extension from Technical Specification requirements to allow repairs to diesel generator IC. The planned maintenance evolved into a major overhaul and more time is necessary to complete the repairs.

The present amendments were authorized by telephone on August 7,1981. The amendments revise the previously granted extension from diesel generator opera-bility and surveillance frequency requirements to allow continued plant operation for a total of fifteen days during repairs to diesel generator 1C. The amend-ments were authorized on an expedited basis to maintain the plant at a steady-state condition and avoid a shutdown transient shown by our evaluation to be unnecessary but required by Technical Specifications unless amended.

e 8109160283 810827 PDR ADOCK 05000348 P

pg

7590-01 The application for the amendments compic with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulation.s. The Commission has made appropriate findings as required by the Act and Commission's rules and regulations in 10 CFR Chapter I, which are set forth in1the license amendments.

Prior public notice of these amendments was not required since these amendments do not involve a significant -hazards

'co,nsideration.

The :ommission has determined that the issuance of these amendments will not' result in any significant environmental impact and that pursuant tc 10 CFR 551.5(J)(4) an environmental impact statement or negative declaration and environmental impact appr6isal need not be prepared in connection with issuance of these amendmects.

For further details with respect to this action, see (1) the request for amendments dated August 7, 1981,'(2) Amendment No. 24 to License No. NPF-2, (3) Amendment No. 6 to License No. NPF-8, and (4) the Commission's related Safety Evaluation. All of these items are available for public inspection at

~

the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C.

and at the George S. Houston Memorial Library, 212 W. Burdeshaw Street, Dothan, Alabama 35303. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, Attention:

Director, Division of Licensing.

?

e 4

a

, ~.

~

. i=

7590-01~

j

. __ 3.

O

. Dated at Bethesda,- Maryland this 27th. day of August 1981.

FOR THE NUCLEAR REGULATORY. COMMISSION bh' d: