Corrected Amend 87 to License NPF-8,changing TS Page 3/4 4-17 Section 3.4.7.2.d
ML20095H144
Person / Time
Site: Farley 
Issue date: 04/22/1992
From:
NRC
To:
Shared Package
ML20095H147 List:
References
NUDOCS 9204290263
Download: ML20095H144 (1)


Text

..

- -. ~-

A PEACTOR COOLANT-5YSTEM OPERATIONAL LEAKAE LIMITING CONDITION FOR OPERATION

................................................n.............................

'3.4.7.2 Reactor Coolant System leakage shall be limited-to:

a.

No PRESSURE BOUNDARY LEAKAGE, b.

1 GPM UNIDENTIFIED LEAKAGE, c.

For the Ninth Goeratino Cycle oniv. orin,ary-to-secondary leakaoe throuch all steam cenerators shall be limited to 450 gallons cer day and 150 callons Der day throuch any one steam cenerator.

For subsequent cycles, 1 GPM total primary-to-secondary l

leakage through all steam generaf. es and 500 gallons per day through any one steam generator, d.

10 GPM IDENTIFIED LEAKAGE-from the Reactor Coolant System, and e.

31 GPM CONTROLLED LEAKAGE at a Reactor Coolant System pressure of 2235 1 20 psig, f.

Tne maximum allowsble leakage of any Reactor Coolant System Pressure Isolation Valve shall be as specified in Table 3.4-1 at a pressure of 2235 20 psig.

APPLICABILITY:- MODES 1, 2, 3 and 4 ACTION:

a.

With any PRESSURE. BOUNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b;

-With any Reactor Coolant System leakage greater than any one of the above_ limits, excluding PRESSURE BOUNDARY LEAXAGE, reduce the leakage rate to within limits within.4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s-or be in at least HOT STANDBY within-the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, c.

With any Reactor Coolant System Pressure Isolation Valve-leakage greater than the limit specified in Table 3.4-1, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least two closed manual or deactivated automatic valves, or be in ~

at.least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

FARLEY-UNIT 2 3/4 4-17 AMENDMENT NO. 41, 87