09-18-2017 | On July 20, 2017, with the Davis-Besse Nuclear Power Station ( DBNPS) operating at approximately 100 percent power, it was identified that the Emergency Diesel Generator ( EDG) fuel oil storage tank vents were not adequately protected from potential tornado-generated missiles. If a missile crimped the vent it could disable the transfer pump or tank, potentially impacting the seven-day fuel supply for the affected train(s) of EDG. While the storage tanks were protected from tornado missiles when installed, the vents were not provided with any such protection. Compensatory measures were established to ensure a vent path remained following a tornado event, and actions will be taken to ensure the vents for each EDG fuel oil storage tank are adequately protected from tornado missiles.
This issue is being reported in accordance with 10 CFR 50.73(a)(2)(ii)(B) as an unanalyzed condition that significantly degraded plant safety, in accordance with 10 CFR 50.73(a)(2)(v) as a condition that could have prevented the fulfillment of the safety function, in accordance with 10 CFR 50.73(a)(2)(vii) as an event where a single cause or condition caused two independent trains to become inoperable in a single system, and in accordance with 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by Technical Specifications. |
---|
Letter Sequence Request |
---|
EPID:L-2018-LLL-0016, Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles, LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles (Open) |
|
|
|
---|
Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground 05000346/LER-2017-0022017-11-27027 November 2017 Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass, LER 17-002-00 For Davis-Besse Nuclear Power Station, Unit 1, Regarding Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass 05000346/LER-2017-0012017-09-18018 September 2017 Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles, LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles 05000346/LER-2016-0082017-02-27027 February 2017 Application of Technical Specification for the Safety Features Actuation System Instrumentation, LER 16-008-01 for Davis-Besse Nuclear Power Station Unit 1 Regarding Application of Technical Specification for the Safety Features Actuation System Instrumentation 05000346/LER-2016-0092016-11-0909 November 2016 Reactor Trip due to Rainwater Intrusion and Auxiliary Feedwater Actuation on High Steam Generator Level, LER 16-009-00 for Davis-Besse Nuclear Power Station, Unit 1 Regarding Reactor Trip due to Rainwater Intrusion and Auxiliary Feedwater Actuation on High Steam Generator Level 05000346/LER-2016-0072016-08-22022 August 2016 Pressurizer Code Safety Valve Setpoint Test Failures, LER 16-007-00 for Davis-Besse, Unit 1 Regarding Pressurizer Code Safety Valve Setpoint Test Failures 05000346/LER-2016-0062016-08-15015 August 2016 Potential to Trip Emergency Diesel Generator on High Crankcase Pressure, LER 16-006-00 for Davis-Besse Nuclear Power Station Unit 1 RE: Potential to Trip Emergency Diesel Generator on High Crankcase Pressure 05000346/LER-2016-0052016-07-11011 July 2016 - , Plant Startup with Anticipatory Reactor Trip System in Main Turbine Bypass, LER 16-005-00 for Davis-Besse, Unit 1, Regarding Plant Startup with Anticipatory Reactor Trip System in Main Turbine Bypass 05000346/LER-2016-0042016-06-0606 June 2016 Reactor Coolant System Hot Leg Resistance Temperature Detector Wire Insulation Degradation, LER 16-004-00 for Davis-Besse Nuclear Power Station, Unit 1 Regarding Reactor Coolant System Hot Leg Resistance Temperature Detector Wire Insulation Degradation 05000346/LER-2016-0032016-05-31031 May 2016 Leak from Reactor Coolant Pump Seal Piping Flexible Hose due to Undetected Manufacture Weld Defect, LER 16-003-00 for Davis-Besse Nuclear Power Station, Unit 1 Regarding Leak from Reactor Coolant Pump Seal Piping Flexible Hose due to Undetected Manufacture Weld Defect 05000346/LER-2016-0022016-03-29029 March 2016 Unanticipated Steam and Feedwater Rupture Control System Actuation, LER 16-002-00 for Davis-Besse Nuclear Power Station, Unit 1, Regarding Unanticipated Steam and Feedwater Rupture Control System Actuation 05000346/LER-2016-0012016-03-29029 March 2016 1 OF 7, LER 16-001-00 for Davis-Besse Nuclear Power Station Unit 1 Regarding Reactor Trip During Nuclear Instrumentation Calibrations and Steam Feedwater Rupture Control System Actuation on High Steam Generator Level ML0409003422004-03-26026 March 2004 LER 97-004-01 for Davis-Besse, Unit 1 Regarding Reactor Coolant Pump Motor Oil Piping Not Protected from Leakage as Required Per 10CFR50, Appendix R ML0404901932004-02-13013 February 2004 LER 99-003-01 for Davis-Besse, Unit 1 Regarding Failure to Perform Engineering Evaluation for Pressurizer Cooldown Rate Exceeding Technical Specification Limit ML0331701982003-11-0707 November 2003 LER 98-002-01 for Davis-Besse Unit 1 Regarding Plant Trip Due to High Pressurizer Level as a Result of Loss of Letdown Capability 2024-09-19
[Table view] |
comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 001 05000 - 346 YEAR 2017 - 00 Energy Industry Identification System (EIIS) codes are identified in the text as [XX].
System Description:
The Davis-Besse Nuclear Power Station (DBNPS) Class 1 E AC Electrical Power Distribution System AC sources consist of the offsite power sources (preferred power sources, normal and alternate) and the onsite standby Emergency Diesel Generators (EDGs). An EDG [EK-DG] starts automatically on a Safety Features Actuation System (SFAS) [JE] actuation or on an essential bus degraded voltage or loss of voltage signal.
After an EDG has started, it will automatically tie to its respective bus after offsite power is tripped.
Each EDG is provided with storage tanks [DC-TK] having a fuel oil capacity sufficient to operate that diesel for a period of seven (7) days while the EDG is supplying maximum post loss of coolant accident load demand.
Fuel oil is transferred from the above grade elevation storage tank to the day tank by a submersed transfer pump [DC-P] inside each storage tank. Without relying on the storage tanks for additional fuel, each day tank contains fuel for over twenty hours of full-power operation for its respective EDG.
Technical Specifications:
Technical Specification (TS) Limiting Condition for Operation (LCO) 3.8.1.b requires two EDGs be Operable in Modes 1 through 4. TS LCO 3.8.2.b requires one EDG be Operable in Modes 5 and 6, during movement of irradiated fuel assemblies. TS LCO 3.8.3 requires the stored diesel fuel oil, lube oil, and starting air subsystem be within limits for each required EDG when the associated EDG is required to be Operable. With one or more EDGs with diesel fuel oil, lube oil, or starting air subsystem not within limits otherwise specified, LCO 3.8.3 Condition F requires the associated EDG be declared inoperable immediately.
DESCRIPTION OF EVENT:
In order to address the concerns outlined in NRC Regulatory Issue Summary (RIS) 2015-06 "Tornado Missile Protection," evaluations of tornado missile vulnerabilities and their potential impact on Technical Specification (TS) plant equipment were conducted.
On July 20, 2017, with the DBNPS operating in Mode 1 at approximately 100 percent power, it was identified that the EDG fuel oil storage tank vents were not adequately protected from potential tornado-generated missiles. In the event a tornado missile were to strike the storage tank vents, the missile could completely crimp the vent and isolate the vent path. While the transfer pumps would remain able to transfer fuel oil to the associated EDG day tank, the removal of liquid from the tank would create a vacuum in the tank, which could affect pump performance and challenge the structural integrity of the tank. Both EDGs were declared inoperable and NRC Enforcement Guidance Memorandum (EGM) 15-002, "Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance," was applied.
CAUSE OF EVENT:
The primary cause of the inadequate missile protection on the EDG fuel oil storage tank vents was that the original system design did not recognize the need to provide missile protection for the tanks vents, which are required to support proper tank performance. The original plant design provided a single Diesel Oil Storage Tank [DE-TK] to provide fuel to the two individual EDG day tanks. This single, non-redundant tank comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
CAUSE OF EVENT: (continued) was not missile protected or seismically qualified. The need for separate, redundant, seismic, and missile- protected fuel oil storage tanks to provide a seven-day fuel supply for each EDG was identified after initial plant construction had begun, but before the operating license had been issued. Design documents from original system design and construction state that,missile protection for the fuel oil storage tanks is provided by a mound of structural backfill covering both tanks. Although design drawings show the fuel oil storage tank vents penetrate the structural backfill, none of the documents reviewed consider the vents as potential missile targets or the effect of damaged vents on the operation of the tanks and EDGs.
A contributing cause to this event was that earlier compensatory measures proceduralized in procedure RA-EP-02810, Tornados or High Winds, were not properly vetted to ensure the EDGs would remain capable of performing their design function following a tornado. The potential for a fuel oil storage tank vent to be damaged during a tornado and challenge the EDG function was first identified in 2009. Compensatory actions were established to be performed after a tornado to ensure both fuel oil storage tanks had an adequate .vent path even if the normal vents were damaged. Those compensatory actions were later incorporated in procedure RA-EP-02810 to direct operators to inspect vulnerable missile targets following a tornado strike and establish an alternate vent path if the normal vent is damaged. However, to prevent physical damage to the tanks and transfer pumps that could result from operation without adequate venting, one of the procedure steps used to establish an alternate vent requires locking out the associated transfer pump and declaring the affected EDG train inoperable. This action is not aligned with the Technical Specifications, which requires the fuel transfer system to operate as designed. Moreover, the procedure does not include steps to restore the system to service for operability. While these procedure steps would prevent additional damage to the fuel oil storage tank, they do not ensure the fuel oil storage and transfer system remains fully functional during and after a tornado.
ANALYSIS OF EVENT:
The fuel oil and transfer system has level switches in the EDG Day Tanks that initiate automatic transfer of fuel oil from the fuel oil storage tanks to the Day Tanks. If the storage tank vent path were compromised with a complete crimp by a tornado-generated missile and automatic fuel transfer was initiated, the transfer pump would start to draw a vacuum in the tank. Reduced pressure in the tank could degrade or disable the ability of the transfer pump to deliver fuel to the Day Tank and the integrity of the storage tank could be challenged, which would impact the seven-day fuel supply for the affected train(s) of EDG. When full, each EDG Day Tank contains enough fuel to supply a fully-loaded EDG for about one and one-half hours before the transfer pumps would auto start to refill the Day Tank.
While tornadoes are rather common in Ohio, the probability of a tornado striking the station is very low. As discussed in EGM 15-002, the probability of a tornado missile striking a non-conforming component is very small. For a tornado missile to disable a fuel oil storage tank, the tornado would have to generate missiles that would strike the unprotected vent piping and crimp it in a way to completely isolate the vent path. If the vent piping were sheared off completely, the tank would remain vented. If the tank vent were completely crimped, time is available for the operators to restore the vent path before the transfer pump would automatically start. Therefore, as concluded in EGM 15-002, this issue is of low risk significance.
comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 001 05000 - 346 YEAR 2017 - 00 Reportability Discussion:
This issue resulted in both EDGs being declared inoperable in accordance with TS LCO 3.8.1. Therefore, this issue represented an unanalyzed condition that significantly degraded plant safety in accordance with 10 CFR 50.72(b)(3)(ii)(B), and an event or condition that could have prevented fulfillment of a safety function in accordance with 10 CFR 50.72(b)(3)(v). This issue was reported to the NRC Operations Center on July 20, 2017, at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> (Event Number 52865).
This issue is being reported in accordance with 10 CFR 50.73(a)(2)(ii)(B) as an unanalyzed condition that significantly degraded plant safety, and in accordance with 10 CFR 50.73(a)(2)(v) as a condition that could have prevented the fulfillment of the safety function of a system needed to: (A) shutdown the reactor and maintain it in a safe shutdown condition; (B) remove residual heat; (C) control the release of radioactive material; and (D) mitigate the consequences of an accident. This issue is also being reported in accordance with 10 CFR 50.73(a)(2)(vii) as an event where a single cause or condition caused two independent trains to become inoperable in a single system, and in accordance with 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by Technical Specifications.
CORRECTIVE ACTIONS:
Completed Actions:
A standing order was issued as an immediate compensatory measure to satisfy the requirements of EGM 15-002. This compensatory measure directs the operators to existing plant procedures to secure the site if a tornado watch or warning is predicted or issued and to mitigate and recover from the effects of a tornado by establishing an alternate vent path for the fuel oil storage tanks.
Scheduled Actions:
A modification will be developed and implemented to ensure vents for each EDG fuel oil storage tank are adequately protected from tornado missiles.
Procedure RA-EP-02810, Tornados or High Winds, will be revised to ensure the EDGs can perform their design function following a tornado missile strike.
PREVIOUS SIMILAR EVENTS:
There have been no Licensee Event Reports (LERs) at the DBNPS in the past three years related to actual or postulated tornado missiles. A previous issue with postulated tornado missiles was reported via LER 2002-006, but did not include any issues with the EDG fuel oil storage tanks or vents. The tornado that struck the DBNPS on June 24, 1998, was classified by the National Weather Service as an F2 (Fujita Scale) with winds ranging from 113 to 157 miles per hour. While the 1998 tornado resulted in a complete loss of offsite power, the EDGs were started prior to the loss of offsite power and supplied their respective essential loads until offsite power was restored (refer to DBNPS LER 98-006 for further information).
|
---|
|
|
| | Reporting criterion |
---|
05000346/LER-2017-001 | Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles | 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | 05000346/LER-2017-002 | Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass LER 17-002-00 For Davis-Besse Nuclear Power Station, Unit 1, Regarding Auxiliary Feed Water Pump Turbine Bearing Damaged due to Improperly Marked Lubricating Oil Sight Glass | 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
|