ML20140E740

From kanterella
Revision as of 16:39, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amends 136 & 128 to Licenses NPF-10 & NPF-15,respectively, Revising SR 3.8.1.8 to TS 3.8.1 to Allow Licensee to Credit Overlap Testing to Validate Capability of Alternate Offsite Power Source
ML20140E740
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/02/1997
From: Fields M
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20140E745 List:
References
NUDOCS 9706120194
Download: ML20140E740 (12)


Text

_ _ _

gacro e"

4 UNITED STATES l

,j NUCLEAR REGULATORY COMMISSION o

t WASHINGTON, D.C. m1

%4.....,&

SOUTHERN CALIFORNIA EDIS0N COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-361 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 136 License No. NPF-10 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated April 15, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this smendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable j

requirements have been satisfied.

I i

i I

9706120194 970602 PDR ADOCK 05000361 P

PDR

i.

4 2.

Accordingly, the license is amended by changes to the Technical Speci-l fications as indicated in the attachment to this license amendment, and

~

l paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby l

amended to read as follows:

(2)

Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 136, are hereby incorporated in the license.

Southern California Edison Company shall operate the facility in j

accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance.

L FORTHENUCLEARREGULATORYCOMMJSSION 5,

Ea..,1

^

i Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation l

l

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 2, 1997 l

l 1

l i

i i

l ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 136 TO FACILITY OPERATING LICENSE NO. NPF-10 l

DOCKET N0. 50-361 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page.

The revised page is identified by Amendment number and contains marginal lines indicating the areas of change.

The corresponding overleaf page is also provided to maintain document completeness.

l REMOVE INSERT 3.8-7 3.8-7 l

l 1

l l

l 1

r

_ _. _.. - ~

AC Sources--Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.7


NOTE--------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby 184 days condition and achieves, in s 10 seconds, voltage 2 3924 V and s 4796 V, and frequency 2 58.8 Hz and s 61.2 Hz.

SR 3.8.1.8


NOTE------------------

1.

Credit may be taken for unplanned l

events that satisfy this SR.

2.

Testing to satisfy this SR shall 24 months include actual automatic and manual transfer to at least one alternate offsite circuit.

The other alternate offsite circuit may be verified by overlapping circuit tests.

Verify capability of automatic and manual l

transfer of AC power sources from the normal offsite circuit to each alternate required offsite circuit.

(continued) 4 SAN ONOFRE--UNIT 2 3.8-7 Amendment No. 447,136 I

\\

pS"co e

-t UNITED STATES

! g.lllI,, j NUCLEAR REGULATORY COMMISSION l

o WASHINGTON, D.C. 20565 0001 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY l

THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA l

DOCKET NO. 50-362 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 128 License No. NPF-15 1.

The Nuclear Regulatory Commission (the Commission) has found that:

1 A.

The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated April 15, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable

]

requirements have been satisfied.

l l

t i

" 2.

Accordingly, the licente is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby j

amended to read as follows:

i (2)

Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 128, are hereby incorporated in the license.

Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance.

FORTHENUCLEAgREGULATORYCOMMISSION f

' 4L y'

Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 2, 1997 l

l

l l

l '

!~

ATTACHMENT TO LICENSE AMENDMENT l

l AMENDMENT N0.128 TO FACILITY OPERATING LICENSE N0. NPF-15 DOCKET NO. 50-362 I

Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page.

The revised page is identified by Amendment number and contains marginal lines indicating the areas of change.

The corresponding overleaf page is also provided to maintain document completeness.

REMOVE INSERT 3.8-7 3.8-7 l

l l

l l

l l

l

\\

i a

l

AC Sources--Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.7


NOTE--------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby 184 days condition and achieves, in s 10 seconds, voltage 2 3924 V and 5 4796 V, and frequency 2 58.8 Hz and s 61.2 Hz.

SR 3.8.1.8


NOTE------------------

1.

Credit may be taken for unplanned l

events that satisfy this SR.

2.

Testing to satisfy this SR shall 24 months include actual automatic and manual transfer to at least one alternate offsite circuit.

The other alternate offsite circuit may be verified by overlapping circuit tests.

Verify capability of automatic and manual l

transfer of AC power sources from the normal offsite circuit to each alternate required offsite circuit.

(continued) l l

f SAN ON0FRE--UNIT 3 3.8-7 Amendment No. +F6,128

\\

,