Amends 133 & 122 to Licenses NPF-10 & NPF-15,respectively, Revising Frequency of Surveillance Requirements for Certain PPS Instrumentation Contained in TS 3.3.1, RPS Instrumentation-Operating
ML20129K388
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/18/1996
From: Fields M
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20129K389 List:
References
NUDOCS 9611220183
Download: ML20129K388 (20)


Text

. ~

i tway

(

p 4

UNITED STATES

-l g

,j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 20066-0001 l

\\,...../

SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY i

THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA l

DOCKET NO. 50-361 4

SAN ON0FRE NUCLEAR GENERATING STATION. UNIT NO. 2 j

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.133 License No. NPF-10 j

1.

The Nuclear Regulatory Commission (the Commission) has found that:

i A.

The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated July 17, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

4611220183 961118 PDR ADOCK 05000361 P

PDR

l k

o 2.

Accordingly, the license is awnded by changes to the Technical Speci-fications as indicated in th; attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby i

amended to read as follows:

(2)

Technical Soecifications i

i The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised l

through Amendment No.133, are hereby incorporated in the license.

Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the l

Environmental Protection Plan.

i 3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days from the date of issuance, i

FOR THE NUCLEAR REGULATORY COMMISSION i

WS W4

]

Mel B. Fields, Project Manager j

Project Directorate IV-2

~

Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications I

Date of Issuance:

November 18, 1996 4

i i

j l

I l

1 4

4 1

ATTACHMENT TO LICENSE AMENDMENT j

AMENDMENT NO.133 TO FACILITY OPERATING LICENSE NO. NPF-10 i

DOCKET NO. 50-361 i

Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.

j REMOVE INSERT 3.3-6 3.3-6 3.3-7 3.3-7 2

3.3-12 3.3-12 3.3-16 3.3-16 3.3-20 3.3-20 3.3-25 3.3-25 3.3-29 3.3-29 i

i e

3 4

}

k RPS Instrumentatien--Operating 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY j

SR 3.3.1.6


NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER 2 15% RTP.

i

{

Verify linear power subchannel gains of the 120 days l

excore detectors are consistent with the j

values used to establish the shape annealing matrix elements in the CPCs.

e i

SR 3.3.1.7


NOTES-------------------

1.

lhe CPC CHANNEL FUNCTIONAL TEST shall include verification that the correct values of addressable constants are i

installed in each OPERABLE CPC.

2.

Not required to be performed for logarithmic power level channels until i

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reducing THERMAL POWER below IE-4% RTP and only if reactor i

trip circuit breakers (RTCBs) are closed.

Perform CHtNNEL FUNCTIONAL TEST on each 30 days on a j

channel except power range neutron flux.

STAGGERED TEST j

BASIS 1

i SR 3.3.1.8


NOTE--------------------

i Neutron detectors are excluded from the CHANNEL CALIBRATION.

i Perform CHANNEL CALIBRATION of the power 120 days l

range neutron flux channels.

(continued)

)

J s

SAN ONOFRE--UNIT 2 3.3-6 Amendment No. 447,133

(

k 5

i s

RPS Instrumentation--Operating i-i 3.3.1 i

SURVEILLANCE REQUIREMENTS (continued) j SURVEILLANCE FREQUENCY t

l SR 3.3.1.9


NOTE--------------------

F Neutron detectors are excluded from CHANNEL CALIBRATION.

i I

Perform' CHANNEL CALIBRATION on each 24 months i

channel, including bypass removal i

functions.

l SR 3.3.1.10 Perform a CHANNEL FUNCTIONAL TEST on each 24 months i

CPC channel.

}

SR 3.3.1.11 Using the incore detectors, verify the Once after each shape annealing matrix elements to be used refueling prior by the CPCs.

to exceeding 85% RTP l

l 4

i-SR 3.3.1.12 Perform a CHANNEL FUNCTIONAL TEST on each once within operating bypass removal function.

120 days prior l

to each reactor 1

1 startup

!i.

e SR 3.3.1.13


NOTE--------------------

L Neutron detectors are excluded.

i Verify RPS RESPONSE TIME is within limits.

24 months on a i.

STAGGERED TEST BASIS i

i i

i 4

l

)

SAN ONOFRE--UNIT 2 3.3-7 Amendment No. +B7,133

RPS Instrumentation--Shutdown 3.3.2 ACTIONS j

CONDITION REQUIRED ACTION COMPLETION TIME i

1 D.

(continued)

D.2 Place one affected I hour automatic trip channel in bypass and place the other in

{

trip.

I E.

Required Action and E.1 Open all RTCBs.

I hour associated Completion Time not met.

I i

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform a CHANNEL CHECK of each logarithmic 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

{

power channel.

1 SR 3.3.2.2 Perform a CHANNEL FUNCTIONAL TEST on each 30 days on a logarithmic power channel.

STAGGERED TEST l

BASIS i

SR 3.3.2.3 Perform a CHANNEL FUNCTIONAL TEST on each Once within l

operating bypass removal function.

120 days prior l

to each reactor 4

startup (continued) i 1

}

i SAN ONOFRE--UNIT 2 3.3-12 Amendment No. 447,133 1

i CEACs 4

3.3.3 l

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME i

i C.

Receipt of a CPC C.1 Perform CHANNEL 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> channel B or C cabinet FUNCTIONAL TEST on high temperature affected CEAC(s).

AtQ alarm.

Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> until high temperature i

alarm is cleared 4

D.

One or two CEACs with D.1 Perform CHANNEL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> three or more FUNCTIONAL TEST on i

autorestarts during a affected CEAC, j

12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period.

i E.

Required Action and E.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion 1

Time of Condition B, C, or D not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform a CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

)

SR 3.3.3.2 Check the CEAC autorestart count.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l

SR 3.3.3.3 Perform a CHANNEL FUNCTIONAL TEST.

60 days on a I

STAGGERED TEST BASIS (continued)

SAN ON0FRE--UNIT 2 3.3-16 Amendment No. 4W,133

RPS Logic and Trip Initiation 3.3.4 ACTIONS (continued)

CONDITION REQUIRED ACTION r.0MPLETION TIME i

E.

Required Action and E.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, Atg}

B, or D not met.

E.2 Open all RTCBs.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> DE i

One or more Functions 1

with more than one Manual Trip, Matrix Logic, Iriff lation Logic, or RTCB channel

~i inoperable for reasons other than Condition A i

or D.

l

. SURVEILLANCE REQUIREMENTS SURVEILLANCF FREQUENCY SR 3.3.4.1 Perform a CHANNEL FUNCTIONAL TEST on each 31 days RTCB channel.

SR 3.3.4.2 Perform a CHANNEL FUNCTIONAL TEST on each 120 days l

RPS Logic Channel.

l i

SR 3.3.4.3 Perform a CHANNEL FUNCTIONAL TEST, 18 months including separate verification of the undervoltage and shunt trips, on each RTCB.

(continued) j 4

i SAN ONOFRE--UNIT 2 3.3-20 Amendment No. 4W,133 4

k i

ESFAS Instrumentation 3.3.5 i

i SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.5.2 Perform a CHANNEL FUNCTIONAL TEST of each 30 days on a ESFAS channel.

STAGGERED TEST 4

BASIS i

SR 3.3.5.3 Perform a CHANNEL FUNCTIONAL TEST of each 120 days.

ESFAS channel bypass removal function.

SR 3.3.5.4 Perform a CHANNEL CALIBRATION of Function 18 months l

l 5, Recirculation Actuation Signal, including bypass removal functions.

SR 3.3.5.5 Perform a CHANNEL CALIBRATION of each ESFAS 24 months I

channel, with the exception of Function 5, including bypass removal functions.

SR 3.3.5.6 Verify ESF RESPONSE TIME is within limits.

24 months on a l

STAGGERED TEST BASIS SR 3.3.5.7 Perform a CHANNEL FUNCTIONAL TEST on each once within automatic bypass removal channel.

120 days prior to each reactor startup SAN ONOFRE--UNIT 2 3.3-25 Amendment No. 407,133

=

i ESFAS Logic and Manual Trip 3.3.6 j

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F.

Required Action and F.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion i

Time of Conditions for 88Q Safety Injection i

Actuation Signal, F.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Containment Isolation Actuation Signal, 8

Recirculation Actuation Signal, or i

l Containment Cooling i

Actuation Signal not j

met.

i i

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I

SR 3.3.6.1


NOTE--------------------

4 l

Testing of Actuation Logic shall include the verification of the proper operation of i

each initiation relay.

l 1

l Perform a CHANNEL FUNCTIONAL TEST on each 120 days l

ESFAS logic channel.

l (continued) i i

i 1

l 1

4 i

SAN ONOFRE--UNIT 2 3.3-29 Amendment No. 447,133 4

a

..m

~,

_. _ _ _.. _. _.., _. _. ~ _. _ _ _.. _

. -. ~

ano

[

y l

g I

UNITED STATES g'

j NUCLEAR REGULATORY COMMISSION 4

f' 2

WASHINGTON. D.C. 20$5Ho01 s...../

e i

i f

SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY j

THE CITY OF RIVERSIDE. CALIFORNIA i

THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-362 l

SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 3 f

Ni[NDMENT TO FACILITY OPERATING LICENSE Amendment No.122 License No. NPF-15 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated July 17, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity wi'J the application, the provisions.of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all m11 cable requirements have ix3n satisfied.

u a

, 2.

Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendments and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby amended to read as follows:

j (2)

Yechnical Soecifications The Technical Specifications contained in Appendix A and th Environmental Protection Plan contained in Appendix B, as r.tvised through Amendment No. 122, are hereby incorporated in the

!* ense. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the j

Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION i

Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

November 18, 1996

~

4 I

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 122 TO FACILITY OPERATING LICENSE NO. NPF-15 4

D3CKET NO. 50-362 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.

REMOVE IhSERT 3.3-6 3.3-6 3.3-7 3.3-7 3.3-12 3.3-12 l

3.3-16 3.3-16 3.3-20 3.3-20 3.3-25 3.3-25 l

3.3-29 3.3-29 i

a 4

s

~

RPS Instrumentation--Operating 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.6


NOTE--------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER 2 15% RTP.

Verify linear power subchannel gains of the 120 days l

i excore detectors are consistent with the values used to establish the shape annealing matrix elements in the CPCs.

SR 3.3.1.7


NOTES-------------------

1.

The CPC CHANNEL FUNCTIONAL TEST shall include verification that the correct 4'

values of addressable constants are installed in each OPERABLE CPC.

2.

Not required to be performed for logarithmic power level channels until i

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reducing THERMAL POWER below IE-4% RTP and only if reactor trip circuit breakers (RTCBs) are closed.

3 Perform CHANNEL FUNCTIONAL TEST on each 30 days on a channel except power range neutron flux.

STAGGERED TEST BASIS SR 3.3.1.8


NOTE--------------------

l tleutron detectors are excluded from the CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION of the power 120 days l

range neutron flux channels.

i (continued) 1 1

1 SAN ONOFRE--UNIT 3 3.3-6 Amendment No. 146, 122 l

i

~.

1 1

4 RPS Instrumentation--Operating 3.3.1 i

1

)

SURVEILLANCE REQUIREMENTS (continued) 1 4

f SURVEILLANCE FREQUENCY 1

i l

SR 3.3.1.9


NOTE--------------------

l Neutron detectors are excluded from CHANNEL l

CALIBRATION.

i.

Perform CHANNEL CALIBRATION on each 24 months channel, including bypass removal functions.

l i

SR 3.3.1.10 Perform a CHANNEL FUNCTIONAL TEST on each 24 months l

CPC channel.

i l

SR 3.3.1.11 Using the incore detectors, verify the Once after each shape annealing matrix elements to be used refueling prior by the CPCs.

to exceeding 85% RTP i

SR 3.3.1.12 Perform a CHANNEL FUNCTIONAL TEST on each once within 4

operating bypass removal function.

120 days prior l

{

to each reactor startup SR 3.3.1.13


NOTE--------------------

Neutron detectors are excluded.

Verify RPS RESPONSE TIME is within limits.

24 months on a STAGGERED TEST BASIS SAN ONOFRE--UNIT 3 3.3-7 Amendment No. 444,122

a RPS Instrumentation--Shutdown 3.3.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D.

(continued)

D.2 Place one affected I hour automatic trip J

channel in bypass and place the other in trip.

i i

E.

Required Action and E.1 Open all RTCBs.

I hour associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1 Perform a CHANNEL CHECK of each logarithmic 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> power channel.

SR 3.3.2.2 Perform a CHANNEL FUNCTIONAL TEST on each 30 days on a logarithmic power channel.

STAGGERED TEST BASIS SR 3.3.2.3 Perform a CHANNEL FUNCTIONAL TEST on each Once within operating bypass removal function.

120 days prior l

to each reactor startup (continued) e SAN ON0FRE--UNIT 3 3.3-12 Amendment No. +16,122

4 CEACs 3.3.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Receipt of a CPC C.1 Perform CHANNEL 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> channel B or C cabinet FUNCTIONAL TEST on high temperature affected CEAC(s).

AMQ alarm.

4 Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> until high temperature alarm is cleared D.

One or two CEACs with D.1 Perform CHANNEL 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> three or more FUNCTIONAL TEST on autorestarts during a affected CEAC.

12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period.

4 E.

Required Action and E.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B, C, or D not met.

4 i

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform a CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.3.2 Check the CEAC autorestart count.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.3.3 Perform a CHANNEL FUNCTIONAL TEST.

60 days on a STAGGERED TEST BASIS (continued) l SAN ONOFRE--UNIT 3 3.3-16 Amendment No. 146, 122 k

i

RPS Logic and Trip Initiation 3.3.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E.

Required Action and E.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, ANQ l

B, or D not met.

E.2 Open all RTCBs.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 08 One or more Functions with more than one Manual Trip, Matrix Logic, Initiation Logic, or RTCB channel inoperable for reasons j

other than Condition A or D.

I SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.1 Perform a CHANNEL FUNCTIONAL TEST on each 31 days RTCS channel.

i SR 3.3.4.2 Perform a CHANNEL FUNCTIONAL TEST on each 120 days l

RPS Logic Channel.

e 1

f 18 months SR 3.3.4.3 Perform a CHANNEL FL'NCTIONAL TEST, including separate verification of the undervoltage and shunt trips, on each RTCB.

(continued)

SAN ON0FRE--UNIT 3 3.3-20 Amendment No. 4%,122

[

4 ESFAS Instrumentation i

l 3.3.5 SURVEILLANCE REQUIREMENTS (continued)

I SURVEILLANCE FREQUENCY l

l SR 3.3.5.2 Perform a CHANNEL FUNCTIONAL TEST of each 30 days on a ESFAS channel.

STAGGERED TEST BASIS e

i SR 3.3.5.3 Perform a CHANNEL FUNCTIONAL TEST of each 120 days ESFAS channel bypass removal function.

l SR 3.3.5.4 Perform a CHANNEL CALIBRATION of Function 18 months l

l 5, Recirculation Actuation Signal, including bypass removal functions.

4 l

SR 3.3.5.5 Perform a CHANNEL CALIBRATION of each ESFAS 24 months 1

3 channel, with the exception of Function 5, l

including bypass removal functions.

l l

i SR 3.3.5.6 Verify ESF RESPONSE TIME is within limits.

24 months on a l

l STAGGERED TEST i

BASIS a

I 1

j SR 3.3.5.7 Perform a CHANNEL FUNCTIONAL TEST on each Once within i

automatic bypass removal channel.

120 days prior to each reactor startup l

SAN ONOFRE--UNIT 3 3.3-25 Amendment No. 446,122

l a

r ESFAS Logic and Manual Trip 3.3.6 l

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F.

Required Action and F.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Conditions for

&HD Safety Injection i

Actuation Signal, F.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 4

Containment Isolation Actuation Signal, Recirculation Actuation Signal, or Containment Cooling Actuation Signal not met.

4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.6.1


NOTE--------------------

l Testing of Actuation Logic shall include the verification of the proper operation of each initiation relay.

Perform a CHANNEL FUNCTIONAL TEST on each 120 days l

l ESFAS logic channel.

(continued)

SAN ONOFRE--UNIT 3 3.3-29 Amendment No. 446,122

-