Amends 151 & 143 to Licenses NPF-10 & NPF-15,respectively, Revise SR 3.8.1.9 to TS 3.8.1, AC Sources-Operating, to More Accurately Reflect Test Conditions & Plant Design Requirements
ML20205N260
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/09/1999
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20205N265 List:
References
NUDOCS 9904160212
Download: ML20205N260 (8)


Text

'pp arco g

.4 UNITED STATES 4

f s

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. enmas mm1

\\

/

SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-361 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE i

Amendment No.151 License No. NPF-10 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southern California Edison Company, et al.

(SCE or the licensee) dated January 24,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations:

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9904160212 990409 PDR ADOCK 05000361 P

PDR

n i

s 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:

l I

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.

151, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmenta' Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be

]

implemented within 30 days of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

's te hen Dembek, Chief, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance:

April 9, 1999

)

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.151 TO FACILITY OPERATING LICENSE NO. NPF-10 DOCKET NO. 50-361 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enc!osed page. The revised page is identified by Amendment number and contains marginallines indicating the areas of change.

REMOVE INSERT 3.8-8 3.8-8 l

I i

a

e o

AC Sources --Operating 3.8.1 i

SURVEILLANCE FREQUENCY SR 3.8.1.9


NOTE-------------------

Credit may be taken for unplanned events that satisfy this SR.

Verify each DG rejects a load greater than 24 months or equal to its associated single largest post-accident load, and:

a.

Following load rejection, the frequency is s 66.75 Hz; b.

Within 4 seconds following load j

rejection, the voltage is 2 4297 V and s 4576 V; and c.

Within 4 seconds following load rejection, the frequency is 2 59.7 Hz l

and s 61.2 Hz.

SR 3.8.1.10


NOTE-------------------

Credit may be taken for unplanned events that satisfy this SR.

Verify each DG. when operating with design 24 months basis kW loading and maximum kVAR loading permitted during testing, does not trip and voltage is maintained s 5450 V during and following a load rejection of 2 4450 kW and s 4700 kW.

(continued) l l

l SAN ONOFRE--UNIT 2 3.8-8 Amendment No. 127,151

[ps*mog 4

UNITED STATES g

g NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20066-4001 O

'+9

,o SOUTHERN CAllFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CAllFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-362 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.143 License No. NPF-15 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southern California Edison Company, et al.

(SCE or the licensee) dated January 24,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this I

amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and j

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

i

..n

.i._.

..J

(

e 2-I 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attschment to this license amendment, and paragraph 2.C(2) of Fecility Operating License No. NPF-15 is hereby amended to read as follows:

(2)

Technical Soecifications The Technical Specifications contained in Appendix A and the Enviror... catal Protection Plan contained in Appendix B, as revised through Amendment No.

143, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented w:' thin 30 days of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Yr i

Stephen Dembek, Chief, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance: April 9, 1999

r.

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.143 TO FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362 Revise Appendix A Technical Specifications by removing the page identn.vd below and inserting the enclosed page. The revised page is identified by Amendment number and contains marginallines indicating the areas of change.

REMOVE INSERT 3.8-8 3.8-8

o AC Sources --Operating l

3.8.1 SURVEILLANCE FREQUENCY SR 3.8.1.9


NOTE-------------------

Credit may be taken for unplanned events that satisfy this SR.

Verify each DG rejects a load greater than 24 months or equal to its associated single largest post-accident load, and:

a.

Following load rejection, the frequency is s 66.75 Hz; b.

Within 4 seconds following load rejection, the voltage is 2 4297 V and s 4576 V; and c.

Wit'in 4 seconds following load tion. the frequency is 2 59.7 Hz l

r-e

61.2 Hz.

SR 3.8.1.10


NOTE-------------------

Credit may be taken for unplanned events that satisfy this SR.

Verify each DG, when operating with design 24 months basis kW loading and maximum kVAR loading permitted during testing, does not trip and voltage is maintained s 5450 V during and following a load rejection of a 4450 kW and s 4700 kW.

(continued) l I

l SAN ONOFRE--UNIT 3 3.6 3 Amendment No. 116, 143 l