Amends 139 & 131 to Licenses NPF-10 & NPF-15,respectively, Modifying TSs to Extend Allowed Outage Times for Single Inoperable SIT from 1 H to 24 H
ML20249C733
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/19/1998
From: Clifford J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20249C734 List:
References
FACA, NUDOCS 9807010123
Download: ML20249C733 (14)


Text

can g%

UNITED STATES g

s NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30006 4 001 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHElM. CALIFORNIA DOCKET NO. 50-361 l

SAN ONOFRE NUCI FAR GENERATING STATION. UNIT NO. 2 i

AMENDMENT TO FACILITY OPERATING LICENSE I

Amendment No.139 l

l License No. NPF-10 j

l 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A. The applications for amendment by Southem Califomia Edison Company, et al.

l (SCE or the licensee) dated November 6,1995 and November 8,1995, as supplemented by letters dated January 9,1998, and February 3,1998, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended i

(the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, I

and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

l

~

9807010123 990619 PDR ADOCK 05000361 P

PDR

s

  • 2.

Accordingly, the license is amended by changes to the Technical Specifications as

. indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental l

Protection Plan contained in Appendix B, as revised through Amendment No. T39, l

are hereby incorporated in the license. Southem Califomia Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and is to be implemented within 30 days from the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION l

l J mes W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects lil/IV j.

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date ofissuance: June 19, 1998 f

4

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.139 TO FACILITY OPERATING LICENSE NO. NPF-10 DOCKET NO. 50-361 Revise Appendix A Technical Specifications by removing the pages identifed below and inserting the enclosed pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT 3.5-1 3.5-1 3.5-4 3.5 4 5.0-20 5.0-20 5.0-20a L

l l

i l

l l

l l

l 9

)

I l

SITS 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 SafetyInjectionTanks(SITS) i LCO 3.5.1 Four SITS shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2, MODE 3 with pressurizer pressure a 715 psia.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME i

A.

One SIT inoperable due A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to boron concentration concentration to not within limits.

within limits.

B.

One SIT inoperable due B.1 Restore SIT to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to inability to verify OPERABLE status.

level or pressure.

j C.

One SIT inoperable for C.1 Restore SIT to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reasons other than OPERABLE status.

Condition A or B.

I D.

Required Action and D.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, AtH1 B, or C not met.

D.2 Reduce pressurizer 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pressure to

< 715 psia.

E.

Two or more SITS E.1 Enter LCO 3.0.3, Immediately inoperable.

SAN ONOFRE--UNIT 2 3.5-1 Amendment No. 127,139

ECCS-Operating 3.5.2 3.5.2 ECCS-Operating LCO 3.5.2 Two ECCS trains shall be OPERABLE.

APPLICABILITY:

MODES I and 2, MODE 3 with pressurizer ' pressure a 400 psia.

-ACTIONS

. CONDITION REQUIRED ACTION COMPLETION TIME A.

One LPSI subtrain A.1 Restore subtrain to 7 days inoperable.

OPERABLE status.

B.

One or more ECCS B.1 Restore ECCS train (s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

-trains inoperable due to OPERABLE status.

to reason (s) other than Condition A.

8151 At least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available.

I C.

Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

-associated Completion 4

Time of Condition A or Atgl B not met.

C.2 Reduce pressurizer 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pressure to

< 400 psik.

SAN ONOFRE--UNIT 2 3.5-4 Amendment No. 127,139

Procedures, Programs, and Manuals 5.5 5.5 Procedures, Programs, and Manuals l

5.5.2.12 Ventilation Filter Testing Program (VFTP)

(continued) l The provisions of Technical Specification Surveillance Requirement 3.0.2 and Technical Specification Surveillance Requirement 3.0.3 are I

applicable to the VFTP test frequencies.

5.5.2.13 Diesel Fuel 011 Testing Program This program implements required testing of both new fuel oil and stored fuel oil. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM standards. The purpose of the program is to establish the following:

a.

At least cnce per 92 days and from new fuel oil prior to addition to the storage tanks by verifying that a sample obtained in accordance with ASTM-D4057-81 has a water and sediment content of less than or equal to 0.05 volume percent, an API gravity or an absolute specific gravity within limits, and a kinematic viscosity 9 40 C of greater than or equal to 1.9 but less than or equal to 4.1 when tested in accordance with ASTM-D975-81.

b.

At least once every 92 days by' obtaining a sample of fuel oil in accordance with ASTM-D4057-81 and verifying that particulate contamination is less than 10mg/11ter when checked in accordance with ASTM-D2276-83, Method A.

5.5.2.14 Configuration Risk Management Program (CRMP)

The Configuration Risk Management Program (CRMP) provides a proceduralized risk-informed assessment to manage the risk associated with equipment inoperability. The program applies to technical specification structures, systems, or components for which a risk-informed Completion Time has been granted. The program shall include tha following elements:

- ai.

Provisions for the control and implementation of a Level 1 at power internal events PRA-informed methodology. The assessment shall be capable of evaluating the applicable plant configuration.

b.

Provisions for performing an assessment prior to entering the LCO Condition for preplanned activities.

c.

Provisions for performing an assessment after entering the LCO Condition for unplanned entry into the LCO Condition.

SAN ONOFRE--UNIT 2 5.0-20 Amendment No. 127,139,139

Proc:dures, Programs, and Manuals q

.5. 5 5.5 Procedures, Programs, and Manuals 5.5.2.14 Configuration Risk Management Program (CRMP)

(Continued) j d.

Provisions for assessing the need for additional actions after the discovery of additional equipment out of service conditions while in the LCO Condition.

e.

Provisions for considering other applicable risk significant contributors such as Level 2 issues, and external events, qualitatively or quantitatively.

l 1

1 i

i l

l l

I l

i SAN ONOFRE--UNIT 2 5.0-20a Amendment No. 139

l

  • SE8ru j

p UNITED STATES g

8 NUCLEAR REGULATORY COMMISSION I

WASHINGTON, D.C. 30006 4001

.\\...../

l l

SOUTHERN CALIFORNIA EDISON COMPANY l

SAN DIEGO GAS AND ELECTRIC COMPANY i

THE CITY OF RIVERSIDE. CALIFORNIA i

l l

THE CITY OF ANAHEIM. CALIFORNIA l

DOCKET NO. 50 382 l

SAN ONOFRE NUCI FAR GENERATING STATION. UNIT NO. 3 4

l AMENDMENT TO FACILITY OPERATING LICENSE l

Amendment No.131 l

License No. NPF-15 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The applications for amendment by Southem Califomia Edison Company, et al.

(SCE or the licensee) dated November 6,1995 and November 8,1995, as supplemented by letters dated January 9,1998, and February 3,1998, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformit/ with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) l that such activities will be conducted in compliance with the Commission's l

regulations; l

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all spplicable requirements have been satisfied.

i l

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby amended to read as follows:

(2) TechnicalSoecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.131, are hereby incorporated in the license. Southem Califemia Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and is to be implemented within 30 days from the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION I

Ja s W. Clifford, Senior Project Manager Project Directorate IV !

Division of Reactor Projects lil/iV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications '

)

Date of issuance: June 19, 1998

ATTACHMENTTO LICENSE AMENDMENT l

l AMEt/DMENT NO. 131 TO FACILITY OPERATING LICENSE NO. NPF-15 l

l DOCKET NO. 50-362 l

1 Revise Appendix A Technical Specifications by removing the pages identifed below and inserting the enclosed pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of chanDe.

REMOVE INSERT 3.5-1 3.5-1 3.5-4 3.5 4 5.0-20 5.0-20 5.0-20a 4

~

SITS 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Safety Injection Tanks (SITS)

LCO 3.5.1 Four SITS shall be OPERABLE.

APPLICABILITY:

MODES I and 2, MODE 3 with pressurizer pressure a 715 psia.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One SIT inoperable due A.1 Restore boron 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to boron concentration concentration to not within limits.

within limits.

B.

One SIT inoperable due B.1 Restore SIT to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to inability to verify OPERABLE status.

level or pressure.

C.

One SIT inoperable for C.1 Restore SIT to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reasons other than OPERABLE status.

Condition A or B.

D.

Required Action and D'.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A, AND B, or C not met.

D.2 Reduce pressurizer 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pressure to

< 715 psia.

E.

Two or more SITS E.1 Enter LCO 3.0.3.

Immediately inoperable.

SAN ONOFRE--UNIT 3 3.5-1 Amendment No. 116,131

ECCS-Operating 3.5.2 3.5.2 ECCS-Operating LC0 3.5.2 Two ECCS trains shall be OPERABLE.

l APPLICABILITY:

MODES I and 2, MODE 3 with pressuriz'r pressure a 400 psia.

e ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One LPSI subtrain A.1 Restore subtrain to 7 days inoperable.

OPERABLE status.

B.

One or more ECCS' B.1 RestoreECCStrain(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> trains inoperable due to OPERABLE status, to reason (s) other than Condition A.

AND At least 100% of the ECCS flow equivalent i

to a single OPERABLE ECCS train available.

C.

Required Action and C.1 Se in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion l

Time of Condition A or AHQ B not met.

C.2 Reduce pressurizer 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pressure to

< 400 psia.

l l

SAN ONOFRE--UNIT 3 3.5-4 Amendment No. 116,131

r Precedures, Prcgrams, and Manuals 5.5 5.5 Procedures, Programs, and Manuals 5.5.2.12 Ventilation Filter Testing Program (VFTP)

(continued)

The provisions of Technical Specification Surveillance Requirement 3.0.2 and Technical S > edification Surveillance Requirement 3.0.3 are applicable ta the VFT) test frequencies.

5.5.2.13 Diesel Fuel 011 Testing Program This program implements required testing of both new fuel oil and stored fuel oil. The program shall include sampling and testing requirements, and acceptance criteria, all in accordance with applicable ASTM standards. The purpose of the program is to establish the following:

a.

At least once per g2 days and from new fuel oil prior to addition to the storage tanks by verifying that a sample obtained in accordance with ASTM-D4057-81 has a water and sediment content of less than or equal to 0.05 volume percent, an API gravity or an absolute specific gravity within limits, and a kinematic viscosity 0 40 C of greater than or equal to 1.g but less than or equal to 4.1 when tested in accordance with ASTM-D975-81.

b.

At least once every g2 days by obtaining a sample of fuel oil in accordance with ASTM-D4057-81 and verifying that particulate contamination is less than 10mg/ liter when checked in accordance with ASTM D2276-83, Method A.

5.5.2.14 Configuration Risk Management Program (CRMP)

The Configuration Risk Management Program (CRMP) provides a proceduralized risk-informed assessment to manage the risk associated with equipment inoperability. The program applies to technical specification structures, systems, or components for which a risk-informed Completion Time has been granted. The program shall include the following elements:

a.

Provisions for the control and implementation of a Level 1 at power internal events PRA-informed methodology. The assessment shall be capable of evaluating the applicable plant configuration.

b.

Provisions for performing an assessment prior to entering the LC0 Condition for preplanned activities.

c.

Provisions for performing an assessment after entering the LCO Condition for unplanned entry into the LC0 Condition.

(continued)

SAN ONOFRE--UNIT 3 5.0-20 Amendment No. 116,119,131

Procedures, Prtgra s, and Manuals 5.5 5.5 Procedures, Programs, and Manuals 5.5.2.14 Configuration Risk Management Program (CRMP)

(Continued) d.

Provisions for assessing the need for. additional actions after the discovery of additional equipment out of service conditions while in the LCO Condition.

e.

Provisions for considering other applicable risk significant contributors such as Level 2 issues, and external events, qualitatively or quantitatively.

l i

(

SAN ONOFRE--UNIT 3 5.0-20a Amendment No. 131


_ ----- _ _ --