ML20206N614
| ML20206N614 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/16/1998 |
| From: | Clifford J NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20206N619 | List: |
| References | |
| NUDOCS 9812210112 | |
| Download: ML20206N614 (9) | |
Text
.
- fpuer p
UNITED STATES s
NUCLEAR REGULATORY COMMISSION S
WASHINGTON, D.C. 30e06 4001 g %***
SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-381 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE 4
Amendment No.145 License No. NPF-10 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southem Califomia Edison Company, et al.
(SCE or the licensee) dated May 7,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the prov!sions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in coru'Aance with the Commission's regulations; D.
The issuance of this ameredment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Coinmission's regulations and all applicable requirements have been satisfied.
9812210112 981216 PDR ADOCK 05000361 P
_.--~ ;
~
l l 2.
Accordingly, the license is amended by changes to the Technical Specifications as i
indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:
l (2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.
l 145, are hereby incorporated in the license. Southem Califomia Edison Company shall operate the ' facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance and is to be implemented within 30 days of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION J mes W. Cliffor, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor R6;ulation l
l
Attachment:
Changes to the Technical Specifications Date of issuance: December 16, 1998 l
ATTACHMENTTO LICENSE AMENDMENT AMENDMENT NO.145 TO FACILITY OPERATING LICENSE NO. NPF-10 DOCKET NO. 50-361 Revise Appendix A Technical Specifications by removing the page ident:fied below and inserting the enclosed page. The revised page is identified by Amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT 1.1-3 1.1-3 l
l t
E 4
d
(
Definitions 1.1 1.1 Definitions
)
CORE ALTERATION within the reactor vessel with the vessel head (continued) removed and fuel in the vessel. Suspension of CORE ALTERATIONS shall not preclude completion of a
j movement of a component to L safe pcsition.
CORE OPERATING LIMITS The COLR is the unit specific document that REPORT (COLR) provides cycle specific )arameter limits for the current reload cycle. T1ese cycle specific parameter limits shall be detemined for each 5.7.1.5.ycle in accordance with Specification reload c Plant operation within these limits is addressed in indi idual Specifications.
DOSE EQUIVALENT I-131 DOSE EQUIVALENT I-131 shall be that concentration ofI-131(microcuries/ gram)thatalonewould produce the same thyroid dose as the quantity and isoto I-133 1-134 and Ipic mixture of I-131, I-132 hyroid, dose,
135 actually present. The t conversion factors used for this calculation shall Su
)
be those listed in ICRP-30,d, gplement to Part 1,
) ages 192-212, Tables title Committed Dose 9guivalent in Target Organs or Tissues per Intake
. Unit Activity I-AVERAGE I shall be the average (weighted in proportion DISINTEGRATION ENERGY to the concentration of each radionuclide in the reactor coolant at the time of sampling) of the disintegration (gebetaandgammaenergiesperin MeV) for isoto sum of the avera iodines, with half lives > 15 minutes, making up at least 95% of the total noniodine activity in the coolant.
ENGINEERED SAFETY The ESF RESPONSE TIME shall be that time interval FEATURE (ESF) RESPONSE from when the monitored parameter exceeds its ESF TIME actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e.lons, valves travel to theirthe the required posit pum etc.). Times shall include diesel generator starting and sequence loading delays, where applicable. The response time may be measured by means of any series of seguential, overlapping, or total steps so that the entire response time is measured.
(continued)
SAN ONOFRE--UNIT 2 1.1-3 Amendment No.127J45 i
4
(""%,\\
UNITED STATE 8 p
s
]
NUCLEAR REGULATORY COMMISSION
%*****.)'
WASHINGTON, D.C. aneeHe01 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY 1
THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA i
DOCKET NO. 50-362 J
SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE I
Amendment No.137 License No. NPF-15 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southem Califomia Edison Company, et al.
(SCE or the licensee) dated May 7,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulat,ons of sne Commission; C.
There is reasonable assuranos (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the pub!!c, and (ii) that such activities will be conducted in compliance with the Ccw7 mission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
,--,4-g+-
c
~
, =
- - ~
\\
! 2.
Accordingly, the license is amended by changes to the Technical Specifications as Indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby amended to read as follows:
l (2)
Technical Snecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.
13? are hereby incorporated in the license. Sotthem Califomia Edison Company l
shall operate the facility in accordance with the Technical Specifications and the 1
Environmental Protection Plan.
l 3.
This license amendmerit is effective as of the date of its issuance, and is to be implemented within 30 days of its issuance.
l FOR THE NUCLEAR REGULATORY COMMISSION 1
James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance:
December 16, 1998 G
i i
t i
.u---
~
l AITACHMENT TO LICENSE AMENDMENT a]MENDMENT NO.137 TO FACILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-382 Revise Appendix A Technical Specifications by removing the page identified telow and inserting the enclosed page The revised page is identified by Amendment number and contains marginal lines indicating the areas of change.
1 REMOVE INSERT 1.1-3 1.1-3 l
l 4
4
Definitions 1.1 1.1 Definitions CORE ALTERATION within the reactor vessel with the vessel head (continued) removed and fuel in the vessel. Suspension of CORE ALTERATIONS shall not preclude completion of movement of a component to a safe position.
CORE OPERATING LIMITS The COLR is the unit specific document that REPORT (COLR) provides cvele specific parameter limits for the currentreIoadcycle. These cycla specific parameter limits shall be determined for each reload cycle in accordance with Specification 5.7.1.5.
Plant operation within these limits is addressed in individual Specifications.
DOSE EQUIVALENT I-131 DOSE EQUIVALENT I-131 shall be that concentration of I-131 (microcuries/ gram) that alone would produce the same thyroid dose as the cuantity and isotopic mixture of I-131, 1-132, I-l"3, doseI-134, and I-135 actually present. The thyroid conversion factors used for this calculation shall be those listed in ICRP-30,d, pplement to Part 1, Su
)a Tables title Committed Dose o}ges 192-212, Target Organs or Tissues pe uivalent in Unit Activity Y-AVERAGE Eshallbetheaverage(weightedinproportion DISINTEGRATION ENERGY to the concentration of each radionuclide in the reactor coolant at the time of sampling) of the disintegration (ge beta and gamma energies perin MeV) for sum of the avera todines, with half lives > 15 minutes, making up at least 95% of the total noniodine activity in the coolant.
ENGINEERED SAFETY The ESF RESPONSE TIME shall be that time interval FEATURE (ESF) RESPONSE from when the monitored parameter exceeds its ESF TIME actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function i.e.
the valver travel to their requiredp(ositIons,pumpdischargepressuresreach etc.. Times shall include theirrequiredvalues,ingan)dsequenceloading diesel generator start delays, where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.
(continued)
SAN ONOFRE--UNIT 3 1.1-3 Amendment No. 116,137
_