Amends 137 & 129 to Licenses NPF-10 & NPF-15,respectively, Deleting License Condition 2.C(26) for Unit 2 & Condtion 2.C(27) for Unit 3
ML20202J105
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/03/1997
From: Fields M
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20202J108 List:
References
NUDOCS 9712110044
Download: ML20202J105 (5)


Text

_.

p....

p UNITED STATES g

NUCLEAR REGULATORY COMMIS810N WASHINGTON, D.C. 3006He01 4,*...+

SOUTHERN CALIFORNIA EDISON COMPANY I

SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKEf NO. 50 361 SAN ONOFRE NUCLEAR GENERATING STAT 10ft UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 137 License No, NPF 10 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated January 4. 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amenced (the Act), and the Comission's regulations set forth in 10 CFR Chapter I:

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission:

C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations:

D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public:

and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

ju"2188M au!gs

~

2 Accordingly. the license is amended by deletion of Paragraph 2.C(26) of 2

Facility Operating License No. NPF 10.*

3.

'This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMIS$10N 15/rEdd Mel B. Fields. Project Manager Project Directorate IV-2 Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation Date of issuance:

December 3, 1997

  • Page 12c is deleted from facility Operating License No. NPF-10.
    • 8eg

/

UNITED STATES i

1 NUCLEAR REGULATORY COMMISSION t,,

WASHINGTON. D.C. 20046 4 001 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY I

THE CITY OF RlVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKFTNO.50362 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT NO 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.129 License No. NPF 15 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated January 4, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's i

regulations set forth in 10 CFR Chapter 1:

B.

The facility will operate in conformity with the application, the l

provisions of the Act, and the rules and regulations of the Comission:

C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations:

D.

The issuance of this amendment will'not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordarce with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

i t

i 2-i i

2.

Accordingly, the lie.ense 1's amended by deletion of Parsgraph 2.C(27) of i

facility Operating License No. NPF 15.*

3.

This license amendment is effective as of the date of its issuance.

t FOR THE NUCLEAR REGULATORY COMMISSION m/KFA j

Mel B. Fields. Project Manager-Project Directorate IV 2 Ti Division of Reactor Projects !!!/IV e

Office of Nuclear Reactor Regulation

+

~Date of Issuance:

December 3, 1997 t

f f

4 g

)

e t

i 4

  • Page lla is attached, for convenience, for the composite 11 cerise to reflect this change.

1

~

va m~,-

-wr-

,,,>~-,,w...--

ew

,w.crm-,

y y

---s-,n

. ~ -. - _

l

[

7 Ila -

\\

(24) halAtion CaDab111tv for Primary EOF By January 1, 1984 the primary EOF ventilation system shall be modified to prc' vide isolation capability as described in l-the SCE letter of July 22, 1983, l

(25) C.attgetion of CPC Software Error i

At the first uailable outage of sufficient duration (7 days l

3 in Mode 5) after Febrqry 2,1984, SCE shall correct the software error in the Core Protection Calculators discussed in the SCE letters dated March 7,1983 and July 22, 1983.

(26) Reoortino of AFWS failures Until the first refueling outage SCE shall provide a monthly report describing any occurrences resulting in the degradation (including, but not limited to component j

failures, maintenance errors, and operator errors) of the auxiliary feedwater system. The report shall cause of such occurrences.

This monthly repor. identify the t does not relieve the licensee from any existing requirements for Licensee Event Reports (LERs),

p-D.

Exemptions to certain requirements of A)pendices G. H and-J to 10 CFR i

Part 50 are described in the Office of iuclear Reactor Regulation's-Safety Evaluation Report.

These exemptions are authorized by law and will not endanger life or property or the common defense and security 1

and are otherwise in the public interest.

Therefore, these exemptiors are hereby granted. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.

r

.c

'rl

)

Amendment No. BrM,129 A

m

.--n--

r.

-.--,--e--e-.,i,,--

+-,,*.-e,,

,-w

,,--eue-e

-..x-.--,

,i

.+-mm,,

r-.-