Amends 155 & 146 to Licenses NPF-10 & NPF-15,respectively, Changing TS in Response to Application
ML20211F192
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/19/1999
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20211F196 List:
References
NUDOCS 9908300270
Download: ML20211F192 (10)


Text

g* "oug

  • b t

UNITED STATES f

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20 % 5 4001 49.....,o SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-361 SAN ONOFRE NUCLEAR GENERATING STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE I

Amendment No155 License No. NPF-10 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southern California Edison Company, et al.

(SCE or the licensee), dated December 19,1997, as supplemented June 1,1998, and May 13,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the l

Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliarm vith the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9908300270 990819 PDR ADOCK 05000361 p

PDR

)

. )

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment

{

No.155, are hereby incorporated in the license. Southern Califomia Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

\\

j'.

j

/ vQ-Q :vCr tep en Dembek, Chief, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management I

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 19, 1999

)

ATTACHMENT TO LICENSE AMENDMENT NO.155 FACILITY OPERATING LICENSE NO NPF-10 DOCKET NO._50-361 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT 3.4-26 3.4-26 3.4-27 3.4-27 l

m._..

Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LC0 3.4.9 The pressurizer shall be OPERABLE with:

a.

Pressurizer water level s 57%; and j

b.

Two groups of pressurizer heaters OPERABLE with the capacity of each group 2 150 kW and capable of being powered from an emergency power supply.

)

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressurizer water A.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> level not within reactor trip breakers l

limit, open.

AND A.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> i

B.

One required group of B.1 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pressurizer heaters group of pressurizer inoperable, heaters to OPERABLE status.

C.

Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completior; Time of Condition B

&EQ not met.

C.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SAN ONOFRL--UNIT 2 3.4-26 Amendment No. 155

Pressurizer 3.4.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Verify pressurizer water level s 57%.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l

SR 3.4.9.2 Verify capacity of each required group of 92 days pressurizer heaters 2 150 kW.

i I

SAN ON0FRE--UNIT 2 3.4-27 Amendment No. 155 4

F

[pcnso uq UNITED STATES

,g NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20$65-0001 SOUTHERN CAllFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORNIA 3

THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-362 l

SAN ONOFRE NUCLEAR GENERATING STATION. UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE l

Amendment No.146 License No. NPF-15 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southem California Edison Company, et al.

(SCE or the licensee) dated December 19,1997, as supplemented June 1,1998,

. and May 13,1999, complies with the standards and requirements of the Atomic l

Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; l

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

r.

6 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.146

, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of its issuance.

l FOR THE NUCLEAR REGULATORY COMMISSION

/

Stephen Dembek, Chief, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management j

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 19, 1999

)

ATTACHMENT TO LICENSE AMENDMENT NO.146 F,_A_CILITY OPERATING LICENSE NO. NPF-15 DOCKET NO. 50-362

- Replace the following pages of the Appendix A Technical Specifications with the attached revised pages; The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT 3.4-26 3.4-26 3.4-27 3.4-27

Pressurizer 3.4.9 3.4 REACTORCOOLANTSYSTEM(RCS) 3.4.9 Pressurizer LC0 3.4.9 The pressurizer shall be OPERABLE with:

a.

Pressurizer water level s 57%; and l

b.

Two groups of pressurizer heaters OPERABLE with the capacity of each group 2 150 kW and capable of being powered from an emergency power supply.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressurizer water A.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> level not within reactor trip breakers l

limit.

open.

i AliD A.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.

One required group of B.1 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pressurizer heaters group of pressurizer inoperable, heaters to OPERABLE status.

C.

Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time 07 Condition B AtiQ not met.

C.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SAN ON0FRE--UNIT 3 3.4-26 Amendment No. 146

Pressurizer 3.4.9

'SURVEILLANCF REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Verify pressurizer water level s 57%.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l

SR 3.4.9.2 Verify capacity of each required group of 92 days pressurizer heaters 2 150 kW.

l 1

l d

SAN ON0FRE--UNIT 3 3.4-27 Amendment No. 146