Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20210P59311 August 1999Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098
ML20195E5068 June 1999Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5
ML20205T28424 April 1999Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1)Boric Acid
Probabilistic Risk Assessment
ML20204B97312 March 1999Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld
ML20199D03313 January 1999Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside AtmosphereTime to boil
Probabilistic Risk Assessment
ML20206R27611 January 1999Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 GallonsSafe Shutdown
Loop seal
Tornado Missile
Tornado Generated Missile
Design basis earthquake
Earthquake
ML20198L61331 December 1998Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS InstrumentationInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML20198G37422 December 1998Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program
ML20196J1688 December 1998PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed
ML20195J89623 November 1998Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating
ML20195J94623 November 1998Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for TurbineTurbine Missile
ML20155B86320 October 1998Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal
ML20153G74722 September 1998Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable
ML20151W67510 September 1998Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7Post Accident Monitoring
Probabilistic Risk Assessment
Fuel cladding
Backfit
ML20151T6524 September 1998Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances
ML20236S62222 July 1998Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCOOffsite Circuit
ML20249B42719 June 1998Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate LimitAnticipated operational occurrence
ML20249A65112 June 1998Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept WithheldTurbine Missile
ML20216B60511 May 1998Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14
ML20216B4037 May 1998Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131
ML20217P8396 April 1998Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion TimesProbabilistic Risk Assessment
ML20216B9996 March 1998Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1
ML20199K6379 January 1998Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectivelyBoric Acid
Probabilistic Risk Assessment
ML20198H8389 January 1998Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection TrainProbabilistic Risk Assessment
ML20198H6659 January 1998Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 HProbabilistic Risk Assessment
ML20198H7449 January 1998Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 DaysEnforcement Discretion
Probabilistic Risk Assessment
Offsite Circuit
ML20198E5945 January 1998Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & TestingEarthquake
ML20197C70019 December 1997Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed
ML20199H94425 November 1997Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV
ML20199C61914 November 1997Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection BarriersSafe Shutdown
Tornado Missile
Probabilistic Risk Assessment
Tornado Generated Missile
ML20217J94917 October 1997Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys UpgradeProbabilistic Risk Assessment
ML20148R37530 June 1997Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TSShutdown Margin
Post Accident Monitoring
ML20141B44218 June 1997Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable BasesQualified Offsite Circuit
Offsite Circuit
ML20137V22515 April 1997Application for Amends to Licenses NPF-10 & NPF-15, Requesting Rev of SR 3.8.1.8 & Applicable Bases to TS 3.8.1, AC Sources - Operating. Proposed Change Allows Credit Overlap TestingQualified Offsite Circuit
Offsite Circuit
ML20134P98421 February 1997Application for Amend to License NPF-15,which Would Clarify in Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS InstrumentationMissed surveillance
ML20138L10118 February 1997Application for Amend to License NPF-15,to Defer Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3Enforcement Discretion
Probabilistic Risk Assessment
Missed surveillance
ML20134J6927 February 1997Application for Amend to License NPF-15,consisting of PCN-479,revising TS SR 3.1.5.4, CEA AlignmentProbabilistic Risk Assessment
ML20134A98624 January 1997Application for Amends to Licenses NPF-10 & NPF-15,to Revise SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which Will More Accurately Reflect Safety Analysis Conditions
ML20133G90614 January 1997Application for Amends to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance RequirementsProbabilistic Risk Assessment
ML20132B90513 December 1996Revised TS Pages D6.1-1,D6.2-1 & D6.5-4 for Amend 158 to License DPR-13Process Control Program
ML20128P34411 October 1996Application for Amends to Licenses NPF-10 & NPF-15, Requesting Change to Reinstate Provisions of SONGS Unit 2 & 3 TS Revised as Part of NRC Amendment 127 & 116
ML20128L7143 October 1996Amend 158 to License DPR-13,revising Section 2.D of Plant, Unit 1 Operating License to Remove Reporting Requirement Redundant to Reporting Requirements in 10CFR50.72 & 50.73Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
ML20117K98530 August 1996Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O
ML20116C67429 July 1996Application for Amends 146 & 130 to Licenses NPF-10 & NPF-15 Consisting of Change Request 443,permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Fuel to Be Consolidated After Required Time in SFPDesign basis earthquake
Foreign Material Exclusion
Earthquake
Fuel cladding
ML20113C25425 June 1996Application for Amends 159 & 143 to Licenses NPF-10 & NPF-15 Revising TS 3.3.11, Pami, & TS 5.5.2.13, Diesel Fuel Oil Testing ProgramPost Accident Monitoring
ML20112D4513 June 1996Applications 159 & 143 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 466,reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116Safe Shutdown
Anticipated operational occurrence
Post Accident Monitoring
ML20117J83730 May 1996Applications for Amends 161 & 145 to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J
ML20117J44329 May 1996Amends 162 & 146 to Licenses NPF-10 & NPF-15,respectively, Consisting of Proposed Change Number 465,changing Unit 2 Amend 127 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection TanksBoric Acid
Shutdown Margin
ML20112D02329 May 1996Application for Amends to Licenses NPF-10 & NPF-15, Consisting of PCN-454,revising Acceptance Criteria for Agastat Time Delay Relays Used in ESF Load Sequencer in TS 3.8.1.18, A.C. Sources - OperatingAnticipated operational occurrence
ML20117D7999 May 1996Amend Applications 160 & 144 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 467,adding Section 5.5.2.14, Barrier Control ProgramProbabilistic Risk Assessment