ML20094J584
| ML20094J584 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/02/1995 |
| From: | Fields M NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20094J588 | List: |
| References | |
| NUDOCS 9511150371 | |
| Download: ML20094J584 (8) | |
Text
.
jf g
UNITED STATES NUCLEAR REEULATORY COMMISSION f
WASHINGTON, D.C. so66M001
%,*****/
j SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CAL.IFORNIA THE CITY OF ANAHEIM. CALIFORNIA i
DOCKET NO. 50-361 SAN ON0FRE NUCLEAR GENERATING STATION. UNIT NO. 2 j
A_MENDMENT TO FACILITY OPERATING LICENSE Amendment No. 126 i
License No. NPF-10 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated August 1,1995, as i
supplemented by letter dated October 18, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; i
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and 5,ecurity or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9511150371 951102 ADOCK0500g1 DR
. 2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-10 is hereby amended to read as follows:
(2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 126, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of the date of its issuance to be implemented within 30 days from tne date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Mel B. Fielt'.s, Project Manager Project Diractorate IV-2
)
Division ot Reactor Projects III/IV Office of Nuclear Reactor Regulation l
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 2, 1995 I
k 4
r j
1 ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 126 TO FACILITY OPERATING LICENSE NO. NPF-10 DOCKET N0. 50-361 i
Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised page is identified by amendment number and contains veritical lines indicating the areas of change. The corresponding i
overleaf page is also provided to maintain document completeness.
REMOVE INSERT 3/4 3-21 3/4 3-21
)
1
Table 3.3-3 (Continued)
TABLE NOTATION ACTION 13 -
With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, within I hour initiate and maintain operation of the control room emergency air cleanup system in the emergency (except as required by ACTIONS 14, 15) f mode of operation.
ACTION 14 -
With the number of channels OPERABLE one less than the total number of channels, restore the inoperable channel to OPERABLE status within 7 days or within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> initiate and i
maintain operation of the control room emergency air cleanup system in the isolation mode of operation.
(See Note 1) l ACTION 15 -
With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, within I hour initiate j
and maintain operation of the control room emergency air cleanup system in the isolation mode of operation.
(See Note 1) l ACTION 16 -
With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.12.
ACTION 17 -
With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, operation may continue provided that the purge valves are maintained closed.
ACTION 17a -
With the number of channelc OPERABLE less than required by the minimum channels OPERABLE requirement, comply with the ACTION i
requirements of Specification 3.4.5.1.
(Mode 1, 2, 3, 4 only)
ACTION 17b -
With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, close each of the containment purge penetrations providing direct access from the containment atmosphere to the outside atmosphere.
NOTE 1 During construction for DCP 2/3-6933.00SJ Actions 14 and 15 will I
not be in effect.
Compensatory actions for the TGIS channels will be conducted in accordance with the October 18, 1995, Edison letter to the U.S. Nuclear Regulatory Commission.
}
SAN ON0FRE - UNIT 2 3/4 3-21 Amendment No. M,126
i v.
E o
E TABLE 3.3-4 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRt#ENTATION TRIP VALUES l
E M FUNCTIONAL UNIT ALLOWABLE l
TRIP VALUE VALUES 1.
SAFETY INJECTION (SIAS) a.
Manual (Trip Buttons)
Not Applicable Not Applicable b.
Containment Pressure - High 1 3.4 psig 1 3.7 psig l
c.
Pressurizer Pressure - Low 1 1740 psia (1) 1 1700 psia (1)
{
d.
Automatic Actuation Logic Not Applicable Not Applicable 2.
CONTAIMENT SPRAY (CSAS)
(
s.
Manual (Trip Buttons)
Not Applicable Not Applicable j
1 b.
Containment Pressure,-- High-Nigh 1 14.0 psig i 15.0 psig l
c.
Automatic Actuation Logic Not Appilcable Not Applicable 3.
CONTAIMENT ISOLATION (CIAS) a.
Manual CIAS (Trip Buttons)
Not Applicable Not Applicable i
b.
Manual SIAS (Trip Buttons)(5)
Not Applicable Not Applicable f
c.
Containment Pressure - High i 3.4 psig 1 3.7 psig l
d.
Autorrtic Actuation Logic Not Applicable Not Applicable
{
R 4.
MAIN STEAM ISOLATION (MSIS) m i
5 a.
Manual (Trip Buttons)
Not Applicable Not Appifcable l
r 2"
g b.
Steam Generator Pressure - Lou 1 741 psia (2) 1 729 psia (2) i g
c.
Automatic Actuation Logic Not Applicable Not Applicable g
5.
RECIRCULATION (RAS) a.
Refueling Water Storage Tank 18.5% of tap span 19.27% 1 tap span 1 17.73%
i b.
Automatic Actuation Logic Not Aoplicable Not Applicable '
4 l
I I
l
y m,t UNITED STATES
[,
]
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20066-0001 49.....,o SOUTHERN CALIFORNIA EDIS0N COMPANY l
SAN DIEGO GAS AND ELECTRIC COMPANY THE CITY OF RIVERSIDE. CALIFORWIA THE CITY OF ANAHEIM. CALIFORNIA DOCKET NO. 50-362 SAN ON0FRE NUCLEAR GENERATING STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 115 License No. NPF-15 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Southern California Edison Company, et al. (SCE or the licensee) dated August 1,1995, as supplemented by letter dated October 18, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commi:,sion; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
t
2.
Accordingly, the license is amended by changes to the Technical Spect-fications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-15 is hereby amended to read as follows:
(2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.115, are hereby incorporated in the license.
Southern California Edison Company shall operate the facility in accordance with the Technical Specifications and the j
Environmental Protection Plan.
3.
The license amendment is effective as of the date of its issuance to be i
implemented within 30 days from the date of issuance.
i l
FOR THE NUCLEAR REGULATORY COMMISSION N
Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 2, 1995 l
4 i
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.115 TO FACILITY OPERATING LICENSE NO. NPF-15 l
DOCKET NO. 50-362 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised page is identified by amendment number and contains veritical lines indicating the areas of change.
The corresponding overleaf page is also provided to maintain document completeness.
REMOVE INSERI NS 3/4 3-21 3/4 3-21 i
e 4
i 1
4 l
1 i
s Table 3.3-3 (Continued)
TABLE NOTATION
'l ACTION 13 - With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, within I hour initiate 4
and maintain operation of the control room emergency air cleanup system in the emergency (except as required by ACTIONS 14, 15) mode of operation.
ACTION 14 With the number of channels OPERABLE one less than the total number of channels, restore the inoperable channel to OPERABLE status within 7 days or within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> initiate and J
maintain operation of the control room emergency air cleanup system in the isolation mode of operation.
(See Note 1) l ACTION 15 - With the number of char.nels OPERABLE less than required by the j
minimum channels OPERABLE requirement, within I hour initiate and maintain operation of the control room emergency air cleanup system in the isolation mode of operation.
(See Note 1) l
)
ACTION 16 - With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.9.12.
With the number of channels OPERABLE less than required by the ACTION 17 minimum channels OPERABLE requirement, operation may continue provided that the purge valves are maintained closed.
ACTION 17a - With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.5.1.
(MODE 1, 2, 3, 4 only) 4 ACTION 17b - With the number of channels OPERABLE less than required by the minimum channels OPERABLE requirement, close each of the containment purge penetrations providing direct access from the containment atmosphere to the outside atmosphere.
NOTE 1
- During construction for DCP 2/3-6933.00SJ Actions 14 and 15 will not be in effect. Compensatory actions for the TGIS channels will be conducted in accordance with the October 18, 1995, Edison letter to the U.S. Nuclear Regulatory Commission.
i l
SAN ON0FRE - UNIT 3 3/4 3-21 Amendment No. 20,115
I l
TABLE 3.3-4 ENGINEERED SAFETY FEATURES ACTUATION SYSTEN INSTRUMENTATION TRIP VALUES h
ALLOWA8tE E
FUNCTIONAL UNIT TRIP VALUE VALUES i
C 1.
SAFETY INJECTION (SIAS) a.
Manual (Trip Buttons)
Not Appilcable Not Appilcable 3
b.
Containment Pressure - High 1 3.4 psig 1 3.7 psig c.
Pressurizar Pressure - Low 1 1740 psia (1) 1 1700 psia (1) f d.
Automatic Actuation Logic Not Appilcable Not Applicable 2.
CONTAIMENT SPRAY (CSAS) a.
Manual (Trip Buttons)
Not Appilcable Not App 1fcable j
b.
Containment Pressure -- High-High 5 14.0 psig i 15.0 psig l
{
- t c.
Automatic Actuation Logic Not Appilcable Not Applicable t
3.
CONTAI MENT ISOLATION (CIAS) l a.
Manual CIAS (Trip Buttons)
Not Applicable "ot Applicable J
b.
Manual SIAS (Trip Buttons)(5) fiot Applicable Not Applicable c.
Containment Pressure - High 1 3.4 psig 1 3.7 psig l
I l
d.
Automatic Actuation Logic Not Appilcable Not Applicable f
4.
MAIN STEAM ISOLATION (MSIS) a.
Manual (Trip Buttons)
Not Applicable Not Appilcable j
b.
Steam Generator Pressure - Low 1 741 psia (2) 1 729 psia (2) l g
c.
Automatic Actuation Logic Not Applicable Not Applicable 9
H 5.
RECIRCULATION (RAS) g a.
Refueling Water Storage Tank 18.5% of tap span 19.27% 3 tap span 1 17.73%
b.
Automatic Actuation Logic Not Applicable Not Applicable y
.t
. I L
-