ML15105A346
From kanterella
Revision as of 22:06, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Request | |
---|---|
Initiation
Administration Results
Other: ML14363A103, ML15111A465, ML15251A206, ML16043A355, NOC-AE-13003020, Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, NOC-AE-14003083, Nd Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, NOC-AE-14003164, Third Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, NOC-AE-15003225, Fourth Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, NOC-AE-15003257, Notification of Compliance with Orders EA-12-049 for Mitigation Strategies for Beyond-Design-Basis External Events and EA-12-051 for Reliable Spent Fuel Pool Instrumentation | |
MONTHYEARNOC-AE-13002963, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-02-28028 February 2013
[Table View]Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML13149A0922013-06-0707 June 2013 Request for Additional Information Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI NOC-AE-13003008, Response to Request for Additional Information Regarding the Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2013-06-25025 June 2013 Response to Request for Additional Information Regarding the Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: Response to RAI NOC-AE-13003027, STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Ord2013-08-26026 August 2013 STPNOC South Texas Project Units 1 & 2 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Numb Project stage: Other NOC-AE-13003020, Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: Other ML13254A2102013-09-19019 September 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 Project stage: Other ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies Project stage: Acceptance Review NOC-AE-14003083, Nd Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Nd Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: Other NOC-AE-14003089, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-02-27027 February 2014 Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other NOC-AE-14003164, Third Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2014-08-27027 August 2014 Third Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: Other NOC-AE-14003162, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2014-08-27027 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other ML14363A1032014-12-31031 December 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NOC-AE-15003225, Fourth Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2015-02-26026 February 2015 Fourth Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: Other NOC-AE-15003224, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) (Tac.2015-02-26026 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) (Tac. Project stage: Other ML15105A3462015-03-23023 March 2015 NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event Project stage: Request ML15111A4652015-05-0606 May 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other NOC-AE-15003257, Notification of Compliance with Orders EA-12-049 for Mitigation Strategies for Beyond-Design-Basis External Events and EA-12-051 for Reliable Spent Fuel Pool Instrumentation2015-07-0202 July 2015 Notification of Compliance with Orders EA-12-049 for Mitigation Strategies for Beyond-Design-Basis External Events and EA-12-051 for Reliable Spent Fuel Pool Instrumentation Project stage: Other ML15251A2062015-08-26026 August 2015 Fifth Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: Other NOC-AE-15003287, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) Project stage: Other ML16043A3552016-01-19019 January 2016 Report of Full Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation Project stage: Other 2014-12-31 |
ML15105A346 | |
Person / Time | |
---|---|
Site: | Beaver Valley, Millstone, Salem, Oconee, Mcguire, Indian Point, Catawba, Wolf Creek, Point Beach, Watts Bar, Sequoyah, Byron, Three Mile Island, Braidwood, Summer, Prairie Island, Seabrook, Surry, North Anna, Turkey Point, Ginna, Diablo Canyon, Callaway, Farley, Robinson, South Texas, Cook, Comanche Peak, McGuire, Shoreham |
Issue date: | 03/23/2015 |
From: | Crane J T Westinghouse |
To: | Office of Nuclear Reactor Regulation |
Dave Garmon, NRR/DIRS 415-3512 | |
Shared Package | |
ML15105A101 | List: |
References | |
NSAL-15-2 | |
Download: ML15105A346 (9) | |
Similar Documents at Beaver Valley, Millstone, Salem, Oconee, Mcguire, Indian Point, Catawba, Wolf Creek, Point Beach, Watts Bar, Sequoyah, Byron, Three Mile Island, Braidwood, Summer, Prairie Island, Seabrook, Surry, North Anna, Turkey Point, Ginna, Diablo Canyon, Callaway, Farley, Robinson, South Texas, Cook, Comanche Peak, McGuire, Shoreham | |
---|---|
Category:Part 21 Correspondence
MONTHYEARNLS2024019, 10CFR Part 21 Report Regarding Service Water Booster Pump Bearing Housing2024-03-27027 March 2024 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Indian Point]] OR [[:Catawba]] OR [[:Wolf Creek]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Seabrook]] OR [[:Surry]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Farley]] OR [[:Robinson]] OR [[:South Texas]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:McGuire]] OR [[:Shoreham]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Indian Point]] OR [[:Catawba]] OR [[:Wolf Creek]] OR [[:Point Beach]] OR [[:Watts Bar]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Seabrook]] OR [[:Surry]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Farley]] OR [[:Robinson]] OR [[:South Texas]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:McGuire]] OR [[:Shoreham]] </code>.10CFR Part 21 Report Regarding Service Water Booster Pump Bearing Housing 1CAN012101, Interim Report Concerning an Evaluation of Deviation2021-01-18018 January 2021 Interim Report Concerning an Evaluation of Deviation ML20028D3802020-01-13013 January 2020 10CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges ML19263A6662019-09-0909 September 2019 Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19008A0432019-01-0404 January 2019 Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML18361A5802018-12-19019 December 2018 Stations, Units 1 & 2 - Part 21 Report Providing Updated Anchor Darling Double Disc Gate Valve Information and Repair Status RA-17-059, Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2017-08-29029 August 2017 Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues L-17-280, Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2017-08-29029 August 2017 Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues PLA-7629, Transmittal of 10CFR 21 Notification2017-08-17017 August 2017 Transmittal of 10CFR 21 Notification ML17251A8392017-08-14014 August 2017 Wectec LLC - Closure of Interim 10 CFR Part 21 Report ML17251A8412017-06-19019 June 2017 Wectec LLC - Interim 10 CFR Part 21 Report Regarding a Reactor Coolant System Pipe Spool for V.C. Summer Unit 3 AP1000 Project ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML15243A1742015-08-25025 August 2015 Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15224A5432015-08-10010 August 2015 Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15223B2662015-08-0707 August 2015 Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings ML15223B2682015-08-0707 August 2015 Part 21 - Damaged Surveillance Capsules ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin L-PI-15-069, Notification of Part 21 Report - Abb 50H Instantaneous Over Current Protection Relay Failure2015-08-0606 August 2015 Notification of Part 21 Report - Abb 50H Instantaneous Over Current Protection Relay Failure ML15105A3462015-03-23023 March 2015 NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14192A0392014-07-0303 July 2014 Interim 10 CFR Part 21 Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects ML14079A0272014-03-13013 March 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13277A0102013-09-23023 September 2013 Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12326A7142012-11-21021 November 2012 Fourth Interim Report Pursuant to 10 CFR 21 - Unexpected Degradation of Vital Batteries Lll and Lv ML12206A0552012-07-24024 July 2012 Second Interim Report Pursuant to 10 CFR 21 - Unexpected Degradation of Vital Batteries III and IV ML12181A1432012-06-27027 June 2012 Limitorque Part 21 Notification Interim Report - Potential Defective Part in SMB-0 Heavy Spring Pack ML12038A0292012-02-0303 February 2012 Part 21 Report- Foreign Material Found in Emergency Diesel Generator High Pressure Fuel Hose ML1024605372010-09-0202 September 2010 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1000700732009-11-19019 November 2009 USNRC 10CFR Part 21 Notification - Flowserve Figure 848 Disk/Disk Nut Separation ML0932900462009-11-16016 November 2009 Part 21 Communication Involving Wartsila Type Sacm UD45 Emergency Diesel Generating Sets Big End Bearings Installed in the Us Nuclear Power Stations of Constellation Energy at Calvert Cliffs and Xcel Energy at Prairies Island ML0902103762008-12-30030 December 2008 December 2008 OL Exam (SRO Exam with Answers) ML0835903462008-12-22022 December 2008 Part 21 Notification - Defective Optical Isolators ML0828003372008-10-0303 October 2008 Namco, Transmittal of 10CFR Part 21 Report - Thread Sealant Issue ML0820700802008-07-22022 July 2008 Transmittal of Notifications Identification of Defect Breaker Charging Motors, Abb Part Number 709799T11 (Lamb Electric Part Number 116848-00) ML0714302622007-05-17017 May 2007 10 CFR Part 21 Report Concerning 3 and 4 Borg Warner Check Valves, Amendment of Information Previously Supplied ML0700300092006-12-22022 December 2006 Part 21 Notification Re Identification of Defect of Fairbanks Morse Woodward Governor Which Considered to Be a Substantial Safety Hazard ML0615605572006-05-25025 May 2006 Part 21 Report Submitted 3/31/06; Response to Request for Additional Information ML0608600852006-03-21021 March 2006 Rosemount Nuclear Instruments, Inc., Notification Under 10 CFR Part 21 for Model 1153 and Model 1154 Pressure Transmitters ML0529103892005-10-13013 October 2005 Part 21 Communication: Testing to ANSI Standards Complete on Circuit Breaker Replacement Primary Bushings NL-05-0317, 10 CFR 21 Interim Report Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs2005-03-0202 March 2005 10 CFR 21 Interim Report Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs ML0501102232005-01-0707 January 2005 Non-Emergency Event Report, Overstress Condition on Single Failure Proof Crane Trolleys NL-04-2459, 10 CFR 21 Report, Electric Power Research Institute Motor Operated Valve Performance Prediction Methodology Versions 1.0 Through 3.22004-12-15015 December 2004 10 CFR 21 Report, Electric Power Research Institute Motor Operated Valve Performance Prediction Methodology Versions 1.0 Through 3.2 ML0435200772004-12-15015 December 2004 10 CFR 21 Report, Potential Non-Conservatism in Butterfly Value Torque Predictions Under Compressible Flow Conditions. JAFP-04-0182, 10 CFR Part 21 Notification Regarding Potential GE Hma Type Auxiliary Relay Failures in Multiple Systems2004-11-16016 November 2004 10 CFR Part 21 Notification Regarding Potential GE Hma Type Auxiliary Relay Failures in Multiple Systems ML0432805972004-11-15015 November 2004 Potential Defect Under 10CFR21 Regarding Electronic Modules Supplied to the First Energy Beaver Valley Nuclear Plant ML0428002672004-09-29029 September 2004 Submittal of Part 21 Final Report: Non-conservative SLMCPR ML0420802492004-07-22022 July 2004 Transmittal of Interim Report Concerning an Evaluation of a Deviation Pursuant to 10CFR21.21 (a)(2). ML0409003662004-03-25025 March 2004 Part 21 Report Regarding Potential Safety Hazard for Blowers on OP Engines (Limerick and ANO-2) 2024-03-27 |
Retrieved from "https://kanterella.com/w/index.php?title=ML15105A346&oldid=395998"