10 CFR 21 Interim Report Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs
ML050630275
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/02/2005
From: Grissette D
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-05-0317
Download: ML050630275 (3)


Text

Don E.Grissette Southern Nuclear Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.6474 Fax 205.992.0341 SOUTHERN N.

March 2, 2005 COMPANY Energy to Serve Your World Docket Nos.: 50424 NL-05-0317 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant 10 CFR 21 Interim Report Cutler-HIamner Freedom Series Model C306 Thermal Overload Relays and Ileater Packs Ladies and Gentlemen:

In accordance with 10 CFR 21.21 (a)(2), Southern Nuclear Operating Company hereby provides the enclosed interim report for Vogtle Electric Generating Plant. The report pertains to Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs supplied by Framatome ANP, Inc., for which evaluation of reportability can not be completed within 60 days from discovery. The evaluation completion date is scheduled for April 29, 2005.

This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, Don E. Grissette DEG/TMM/sdl

Enclosure:

I0 CFR 21 Interim Report cc: Southem Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle

-Enclosure Vogtle Electric Generating Plant 10 CFR 21 Interim Report Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs The following 10 CFR 21 interim report is provided by Southern Nuclear Operating Company (SNC) for Vogtle Electric Generating Plant (VEGP) in accordance with 10 CFR 21.21(a)(2):

(i) Name and Address of Individual Making Interim Report Mr. Don E. Grissette, Vice President Southern Nuclear Operating Company 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35201 (ii) Identification of Basic Component Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs (iii) Basic Component Supplier Framatome ANP, Inc.

200 West Kensinger Drive Suite 600 Cranberry Township, PA 16066 (iv) Date of Discovery of Deviation January 3, 2005 (v) Nature of Deviation Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs supplied by Framatome are used at VEGP in some applications as containment penetration conductor primary protection. Accordingly, it is necessary in such applications that all three phases trip properly. During pre-installation testing of several thermal overload relays with different model heater packs, instances were found where single and multiple overload relay phases would trip either early, late, or not at all.

NL-05-0317 E-1

Enclosure Vogtle Electric Generating Plant IO CFR 21 Interim Report Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs (vi) Evaluation Status SNC is continuing to evaluate the deviation to fully characterize the issue. SNC is currently working with Framatome to review the VEGP site pre-installation testing program that is used for the Cutler-Hammer Freedom Series Model C306 Thermal Overload Relays and Heater Packs in an effort to determine if there is a manufacturing defect associated with these components.

(vii) Evaluation Scheduled Completion Date April 29, 2005 NL-05-03 17 E-2