ML060860085

From kanterella
Jump to navigation Jump to search
Rosemount Nuclear Instruments, Inc., Notification Under 10 CFR Part 21 for Model 1153 and Model 1154 Pressure Transmitters
ML060860085
Person / Time
Site: Dresden, Nine Mile Point, Palisades, Perry, Catawba, Hope Creek, Braidwood, Turkey Point, River Bend, Vogtle, Quad Cities  Constellation icon.png
Issue date: 03/21/2006
From: Darrell Roberts
Rosemount Nuclear Instruments
To:
NRC/FSME
References
+kBR1SISP20060328
Download: ML060860085 (13)


Text

T00l[j [E:9CV ON Y.I/fl] cs:9T aai 9ooz/Tz/co 4" ROSEMOUNT EMERSON. Nuclear Process Management Facsimile Rosemount Nuclear Instruments, Inc.

8200 Market Boulevard Chanhassen, MN 55317 Telephone 1 (952) 949-5234 Fax 1 (952) 949-5201 David.Roberts@EmersonProcess.com To: NRC Operations Center Company:

Fax Number, (301) 816-5151 Date: 3/21/06 From: David Roberts, Quality Manager No. of Page,;: l} , Including coverpage Rosemount Nuclear Instruments is submitting the attached notification as required by 10 CFR Part

21. Please feel free to contact me If you have any questions.

Sincerely, OWq'-T David T. Roberts Quality Mlan2ger Rosemount Nuclear Instruments, Inc.

j--L'-/9 T006 GWON 6t6OM T00~~~

1GT91998102T_6 *- HB1ifN iNFIOW3SOH Wd3 9:S r-G:ST 0S/~S 90OZ/TZ/20

-'Wj L.06O VIX &FUAULL G= .-1IJ.. tflJVVV / LG/ LU 4.

Roetmount Nuclear Instruments, Inc.

8200 Market Boulevard Chanhassen, MN 55317 USA Tel 1 (952)949-5210 EMERSON. Fax 1 (952) 9490-201 www.RoseraountNuclear.com Process Manaciement 21 March 2006 Re: Notification under 10 CFR Part 21 for Model 1153 and Model 1154 Pressure Transmitters Purisant to 10 CFR Part 21, section 21.21(b), Rosemount Nuclear Instruments, Inc.

(RN11) is writing to inform you that:

(a) certain Model 1153 Series B and 1153 Series D pressure transmitters of all range codes and measuring types (gage, differential, absolute) shipped between 16 December 2005 and 13 January 2006, and (b) certain Model 1154 and 1154 Series H pressure transmitters of all range codes and measuring types (gage, differential, sealed reference) shipped between 16 December 2005 and 13 January 2006 may not conform to RNl1's published qualified life specification. See Attachment A for a liet of equipment affected by this notification.

1.0 Name and address of the individual providing the information:

Mr. Jeffrey W. Schmitt Vice President & General Manager Emerson Process Management Rosemount Nuclear Instruments, Inc.

8200 Market Blvd Chanhassen, MN 55317 2.0 Identification of Items supplied:

Ceitain Model 1153 Series B and 1153 Series D pressure transmitters of all range codes and measuring types (gage, differential, absolute), and certain Model 1154 and 1154 Series H pressure transmitters of all range codes and measuring types (gage, differential, sealed reference) shipped between 16 December 2005 and 13 January 2006 are affected. No sensor modules, shipped as spare parts kits, are affected by this notification. See Attachment A for a list of equipment affected by this notification.

ROSEMJOUNT Nuclear Page 1 of 3 Z006 GTG'ON ~~00~ ~~T~ON TqTq9T8T0Z2TG + 8u3'1:fN .LNfl0143SONI Wd3f:S qq:qT 0g/~~

900E/TZ/20

" L4 v ,l G o i o0 <h tJ A.U/ AsJ V L Ad al U . L 6/ L U 3.0 Identification of firm supplying the item:

Emerson Process Management Rosemount Nuclear Instruments, Inc.

820D Market Blvd Chanhassen, MN 55317 4.0 Nature of the failure and potential safety hazard:

For every RNII Model 1153 and Model 1154 transmitter, four diodes are used on a circuit card assembly which is installed and sealed within the sensor module sub-assembly.

The primary function of these diodes is to convert an AC oscillator signal to a DC current that is proportional to the capacitance of the sensor. The diodes (P/N D2911218A) are manufactured by Microsemi Corp. (MSC).

Recently during standard receiving inspection, it was noted that the glass packaging on several of the diodes exhibited an unusual "cloudy' appearance. Upon supplier analysis it was determined that the cloudy appearance was due to interaction between cleaning solution and metallic components of the diode. Cleaning solution was able to penetrate the glass diode package because of a poor hermetic seal. Over time, this condition could degrade the performance and reliability of the diode, particularly at elevated temperatures. The resultant effect on the transmitter might include degraded temperature effect performance and increased drift between calibration cycles, Through further internal investigation MSC was able to bound the potential problem to two lot codes. These lot codes were traced from MSC through our circuit card supplier anci to RNII to identify the shipped transmitters affected by this notification.

RNII built up several test transmitters using diodes having a cloudy appearance and performed thermal aging on the transmitters to simulate typical operating conditions, followed by high temperature testing. Test results suggest that potentially affected transmitters would operate within published performance specifications, including the Nuclear Steam Pressure/Temperature specification. Nonetheless, RNII and MSC were unable to demonstrate the long term reliability of the suspect diodes over the full qualified life of the transmitter.

Therefore, based on analysis of the test results, RNII has established the following qualified life limits for transmitters affected by this .notification. This specification supersedes the published qualified life for all pressure transmitters affected by this notification:

Interim Quallfied Life = 5.1 years @ 120 0 F Operating Temperature RNII does not have sufficient information relative to each end user's specific applications to determine the potential safety-related impact of this notification to each end user's plant. Each end user must determine the impact on its plant operations and plant safety and take action as deemed necessary.

ROSUMOUNT*

Nuclear Page 2 of 3 200d GT6'ON TTST9T8102T6 + E1U3-lflN IlNnOW3soN Wd3 _q :qT 900Z/TZ£0

tooln 1c~cs ON :M/1,] CC:T SQL 9OZ/Z/CO 5.0 The corrective action which is taken, the name of the individual or organization responsible for that action, and the length of time taken to complete that action; (a) RNII held shipments of completed Model 1153 and Model 1154 transmitters while a determination was made as to which units were assembled with diodes from the suspect lot codes.

(b) RNII quarantined all Model 1153 and Model 1154 transmitters and module sub-assemblies in manufacturing while a determination was made as to which units were being assembled wIth diodes from the suspect lot codes.

(c) RNII issued a corrective action request to the diode supplier (MSC). MSC determined root cause, identified the suspect diode lots, and implemented corrective action. RNII verified the suppliers corrective actions during an on-site visit.

(d) RNII has reworked all pressure transmitters that were completed or in production that contained diodes from the suspect lot.

(e) RNII completed analysis and testing of pressure transmitters built with affected diodes to assess the impact of the non-conforming hermetic seal on performance and reliability of the pressure transmitter.

(f) RNII established an interim qualified life for pressure transmitters affected by this notification as noted in Section 4.0.

(g) Since no visual inspection of the diode is possible on shipped transmitters, RNII will rework any potentially affected pressure transmitter by replacing the module sub-assembly at the end user's request. Completion: As required.

6.0 Any advice related to the potential failure of the item:

The end user must determine the impact of this potential non-conformance upon its plant's operation and safety, and take action as deemed necessary. RNII recommends that potentially affected transmitters be returned to RNII for replacement of the module at the end user's earliest opportunity and consistent with the abbreviated interim qualified life specification noted in section 4.0. Please contact RNII to facilitate the transmitter return process as necessary.

Rosemount Nuclear Instruments, Inc. is committed to the nuclear industry and assures you that we are dedicated to the supply of high quality products to our customers. We apologize for any impact that this notification might cause. If you have any questions, or require additional information related to this issue, please contact: Mike Dougherty (208) 865-1112, Gerard Hanson (952) 949-5233, Bob Cleveland (952) 949-5206, or Matt Doyle (952) 949-5204.

Sincerely, Jeffrey W. Schmitt Vice President and General Manager Rcsemount Nuclear Instruments, Inc.

ROSEMOUNT' Nuclear Page 3 of 3 V006 6T6'*0N 6TST918102%6 e- auDldN lNnow3soH Wd3 qs:s;T 9200/Z0

sool001n I ON S:9T 3flI 900Z/TZ/CO C/L]

ATTACHMENT A: 10 CFR Part 21 Notification - 21 March 2006.

Constellation Nuclear Serial Si Purchase Order Sales Order Model Number Number Ship Date Site 7700240 1635761 1 1153DB7PAN0016 531371 13-Jan-06 l Nine Mile Point 7700240 _ 1635761 1153DB7PANQO16 531372 13-Jan-06 I Nine Mile Point ROSEMOUNT' Page 1 of 1 Nuclear S00E 616 *DN SST99T8T0£T6 + Ei3317fN 1NnCW3S08 Wd3 qs:GT 900Z/E/Z0

9001 [rCUR ON X:/XL] CS:9T af 9OOZ/TZ/CO ATTACHMENT A; 10 CFR Part 21 Notification - 21 March 2006.

Duke Energy Corp Purchase Order Sales Order Model Number Shi

-~ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Serial N um ber Sh p Date ae Site NE19817 1583569 I1S3DB5PB 531250 22-Dec-05 Catawba NE19817 1583569 1153DB5PB 531251 22-Dec-05 Catawba NE19998 _ 1590972 1153GD8PA 531256 27-Dec-05 Catawba ROSEMOUNT* Page 1 of 1 Nuclear 900d 6T6'ON T9TG9T8T0ZT6 e- W3-io1N INnlOW30d1 WdB S5:ST 900Z/TZ/20

I LOOEit I[CS ON )XU/IXL] C:91 amlL 900Z/TZ/VO ATTACHMENT A: 10 CFR Part 21 Notification - 21 March 2006.

Entergy Corp Purchase Order Sales Order Model Number Site

= Number S Ship DateL

=

. 09048 1611026 _ 1153DB5PC - 531249 27-Dec-5 River Bend 10109048 1611026 T- 1153DB5PC = 531248 27-Dec-05 I River Bend 4

ROSEMOUNT" Page 1 of I Nuclear LOWd GTG'ON TGTG9T8T0£16 <- Yiu3iofN iNnlONl30 Wd3 qsg: qT 900z/Tz/20

VUULej LsLW UN Ad/Xmj 1! iJ1L1 tUU/LtZ/V0 I

ATTACHMENT A. 10 CFR Part 21 Notification - 21 March 2006.

Exelon Generation Co LLC Purchase Order Sales Order Model Number Number Ship Date Site 00072574 1347936 1153DB7PA 531291 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 531311 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 531312 12-Jan-06 Quad Cities 00072574 _ 1347936 1153DB7PA 531307 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 531287 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 53128B 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 531309 12-Jan-06 Quad Cities 00072574 1347936 1153D67PA 531308 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 531305 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 531306 12-Jan-06 Quad Cities 00072574 1347936 1153DB7PA 531310 12-Jan-06 Quad Cities 00076959 1605741 1154SH9RA 531320 9-Jan-06 Braidwood Rel 00048 Rev 001 00076959 1605161 1153GB7PA 531281 10-Jan-06 Dresden Rel 00051 Rev 001 .

ROSEMOUNT Page 1 of 1 Nuclear 8000 6T6'0N 15TT9T1810£16 *- HB31lN INllOW3SOd Wd3 55:5T 900Z/Tz/20

6ao01M uaS ON Yf/x/jj C9:9T af, 90OZ/T2/VO A1TACHMENT A: 10 CFR Part 21 Notification - 21 March 2006.

FirstEnergy Corp Purchase Ordor Sales order Model Number Sri u mber ShipDate i a eS Ste t

______ ________N 45161422 1578530 1153DB5RAN0039 531362 12-Jan-06 Perry NPP 45161422 1578530 1153GB6PCN0016 531404 12-Jan-06 Perry NPP 45161422 1578530 1153G86PCN0016 531405 12-Jan-06 Perry NPP 45161422 1578530 11S3DB5RAN0039 531363 12-Jan-06 Perry NPP 45161422 1578530 1153DB5RAN0039 531360 12-Jan-06 Perry NPP 45161422 1578530 i153GB4PAN0016 531373 12-Jan-06 Perry NPP 45161422 1578530 1153GB7PGN0016 531402 12-Jan-06 Perry NPP 45161422 1578530 1153GB7PCN0016 531399 12-Jan-06 Perry NPP 45161422 1578530 1153GB7PCN0016 531400 12-Jan-06 Perry NPP 45161422 1578530 1153GB7PCN0016 531401 12-Jan-06 Perry NPP 45161422 1578530 1153DB5RAN0039 531361 12-Jan-06 Perry NPP 45161422 1578530 1153DB5RAN0039 531358 12-Jan-06 Perry NPP 45161422 1578530 1153DB5RAN0039 531359 12-Jan-06 Perry NPP 45161422 1578530 1153DB3PCN0016 531378 12-Jan-06 Perry NPP 45161422 1578530 1153GB7PCN0016 531409 12-Jan-06 Perry NPP 45161422 1578530 1153DB3PCN0016 531377 12-Jan-06 Perry NPP ROSEMOUNT Page 1 of 1 Nuclear 600d 616'ON T9T99TBT02TG6 <- du3OlnN 1Nlnom3od Wd 3 SS: Sl 900Z/TZ/20

ULULOJ IVVUV UN XI/XLJ VS:g1 SE 900Z/TZ/VO ATTACHMENT A; 10 CFR Part 21 Notification - 21 March 2006.

Florida Power and Light Co Purchase Order Sales Order 1 Model Number SerialDate Site 00086581_____

00086581 1583570 1583570 11___

11 53DB5PB Number 531252 Ship De 22-Dec-05 Turkey Point 00086581 1583570 1153DB5PB 531253 22-Dec-05 Turkey Point 00088593 1616851 1153D85PB 1531273 ,29-Dec-05 , Turkey Point-ROSEMOUNT' Page 1 of I Nuclear 0T06 6T6'ON TGT09T98T0T6 <- NumonN 1NfnOWmSo Wd3 S9:ST 900Z/TE/20

LVLULPJ LtLVI UN ;(d/XLJ I.5t; WIISL 9UOZ/IZ/I/O ATTACHMENT As 10 CFR Part 21 Notification - 21 March 2006.

Georgia Power Co ROSEMOUNT" Page 1 of i Nuclear TT0d 6T6'ON T9Ts9T8sToT6 <- Nu33mN iNnOW3SO8 WdE 99:9T 900a/T&Z20

("u-U4 Ltug ut xa/A&d -

L-YL WiLL UUU/ /S1U ATTACHMENT A: 10 CFR Part 21 Notification - 21 March 2006.

Nuclear Managernent Co LLC Puchase Order Sales Order ModelNumber Serial Sip aest I I NumberII P8-7-3 ~ 11585748 11153DD5RAN0033 1531254 128-Dec-05 I Palisades ROSEMOUNT Page 1 of I Nuclear Z;06 GTG'ON TGTG9T8T0ZTG <- H N INnOWmm0d WdE ndU3 55:51 900Z/TZ/20

tu Lbna.6 UN du/xLJ 1s;!i.L JaL 900z/TZ/V0 ATTAC I-MENT A: 10 CFR Part 21 Notification - 21 March 2006.

Public Service Electric and Gas Purchase Order Sales Order Model Number Nueria S Ship Date Site 4500309896 1567442 ES3HD5RAN0037 1 531258 22-Dec-05 Hope Creek ROSEMOUNT Page 1 of 1 Nuclear 2T0d 616 ON TsTs9T8TozT6 <- 1jud31oN INnoWSoa Wd3 rSq: ST 900Z/TI~/20