Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARNLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19219A1522019-07-22022 July 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0125, Rev. 0, Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA(DCM) ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19165A0272019-06-0505 June 2019 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0125-INT, Rev. 0 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17090A3972017-03-28028 March 2017 Part-21 Notification - Willful Misconduct and Falsification of Records ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14134A1212014-05-0909 May 2014 Notification of Potential Part 21 - Potential Defect in General Electric Type CR120AD Control Relays W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14101A3432014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric Type CR120 AD Control Relays ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13024A0302013-01-0909 January 2013 MPR Associates Inc., Interim Report in Accordance with 10 CFR Part 21 ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12342A3732012-12-0606 December 2012 Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12045A5272012-02-0303 February 2012 Part 21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR-0104, Rev. 0, NPPD Fuel Hose, P/N 2-01H-050-003 ML12038A0292012-02-0303 February 2012 Part 21 Report- Foreign Material Found in Emergency Diesel Generator High Pressure Fuel Hose ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld 2023-09-06
[Table view] Category:Part 21 Correspondence
MONTHYEARNLS2024019, 10CFR Part 21 Report Regarding Service Water Booster Pump Bearing Housing2024-03-27027 March 2024 10CFR Part 21 Report Regarding Service Water Booster Pump Bearing Housing ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12038A0292012-02-0303 February 2012 Part 21 Report- Foreign Material Found in Emergency Diesel Generator High Pressure Fuel Hose ML1024605372010-09-0202 September 2010 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1000700732009-11-19019 November 2009 USNRC 10CFR Part 21 Notification - Flowserve Figure 848 Disk/Disk Nut Separation ML0501102232005-01-0707 January 2005 Non-Emergency Event Report, Overstress Condition on Single Failure Proof Crane Trolleys ML0428002672004-09-29029 September 2004 Submittal of Part 21 Final Report: Non-conservative SLMCPR ML0335301272003-12-16016 December 2003 Part 21 Report on Potential Concern Regarding Specific Lot of Fluorocarbon Rubber Inserts ML0320604292003-07-21021 July 2003 Notification of Possible Defect Associated with Thermo Westronics Model 2100C Series Recorders ML0215601132002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR21 Notification - Potential Defect Involving Fan Assemblies Use in Forced Air Cooled Uninterruptible Power Supply Systems 2024-03-27
[Table view] |
Text
0210312012 U.S. NuclearRegulatory Commission OperationsCenter Event Report Pake I Part 21 (PAR) Event# 47635 Rep Org: ENGINE SYSTEMS, INC Notification Date I Time: 02/03/2012 15:35 (EST)
Supplier: ENGINE SYSTEMS, INC Event Date / Time: 12/01/2011 (EST)
Last Modification: 02/03/2012 Region: 1 Docket #:
City: ROCKY MOUNT Agreement State: Yes County: License #:
State: NC NRC Notified by: TOM HORNER Notifications: JONATHAN BARTLEY R2DO HQ Ops Officer: DONALD NORWOOD JEFF CLARK R4DO Emergency Class: NON EMERGENCY PART 21 GRP by Email 10 CFR Section:
21.21 UNSPECIFIED PARAGRAPH PART 21 REPORT - FOREIGN MATERIAL FOUND IN EMERGENCY DIESEL GENERATOR HIGH PRESSURE FUEL HOSE Cooper Nuclear Station (CNS) returned one high pressure fuel hose to Engine Systems, Inc. (ESI) because CNS had found foreign material within the hose during receipt inspection. This fuel hose was one of four fuel hoses that had been supplied to CNS by ESI in October 2011. ESI performed an evaluation and found very small pieces of the elastomer tube internal to the hose. Apparently these pieces were introduced during assembly of the end fittings onto the hose during fabrication of the hose assembly.
When installed, this fuel hose would be located after the engine fuel filter and before the fuel injection pumps.
Foreign material within this hose could migrate to the fuel injection pumps. The entrance of foreign material could impact operability of one or more fuel injection pumps and therefore affect fuel delivery to one or more engine cylinders. This could impact the load carrying capability of the diesel engine or possibly cause complete engine shutdown. Either scenario has the potential to prevent the emergency diesel generator from performing its safety related function.
These hoses were supplied only to CNS.
02-03-12;03:43PM; # 11/ 6 ENGINE SYSTEMS, INC.
175 Freight Road Telephone: 262/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 TELEFAX Date: February 3, 2012 Company: NRC Operations Center Fax Number: 301/816-5151 Verification No.: 301/816-5100
Reference:
Report No. 10CFR21-0104, Rev. 0 From: Tom Homer Page: 1 of 6
Dear Sir:
Following this cover is a copy of our report 10CFR21-0104, Rev.0, for a 10CFR21 reportable notification on a fuel hose for Nebraska Public Power District - Cooper Nuclear Station, P/N 2-01 H-050-003.
A copy of this report will be mailed to the NRC Document Control Desk and to our affected nuclear customer.
Should you have questions, please let us know.
Sincerely, ENGINE SYSTEMS, INC.
Tom Homer Quality Assurance Manager Quality Performance With Pride
02-03-12;03:43PM; # 2/ 6 6Ei ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0104 Rev. 0: 02/02/12 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: NPPD fuel hose 2-01 H-050-003 SYSTEM: Emergency Diesel Generator CONCLUSION: Reportable in Accordance With 10CFR21 Prepared By:. Date:_______
C Engineering Manager Reviewed By: Date: g,-,
Quality Assurance Manager Quality Performance With Pride
02-03-12;03:43PM; # 3/ 6 Report No. , 10CFR21-0104 Record of Revisions Page: 1 of 1 REVI DATE PAGE DESCRIPTION 0 02/02/12 Initial issue.
I. J
02-03-12;03:43PM; # 4/6 Report No. IOCFR21-0104 Revision: 0 Date: 02/02/12 Page: 1 of 3 COMPONENT:
Fuel hose for Nebraska Public Power District - Cooper Nuclear Station, P/N 2-01 H-050-003.
SUMMARY
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 12/01/11 upon review of a hose returned by Nebraska Public Power District (NPPD), Cooper Nuclear Station. NPPD returned one (1) high pressure fuel hose, P/N 2-01H-050-003 because they found foreign material within the hose during their receipt inspection process. This was one (1) of four (4) P/N 2-01H-050-003 hoses supplied by ESI on sales order 3008266. The evaluation was concluded on 01/30/12 and determined the occurrence of foreign material in the fuel hose to be a reportable defect as defined by 10CFR21.
The foreign material found during inspection of the returned hose assembly was determined to be very small pieces of the elastomer tube internal to the hose. It appears these pieces were introduced during assembly of the end fittings onto the hose during fabrication of the hose assembly.
The hose, P/N 2-01H-050-003, is located after the engine fuel filter and before the fuel injection pumps. Foreign material within this hose could migrate to the fuel injection pumps. The entrance of foreign material could impact operability of one or more fuel injection pumps and therefore affect fuel delivery to one or more engine cylinders. This could impact the load carrying capability of the diesel engine or possibly complete engine shutdown. Either scenario has the potential to prevent the emergency diesel generator from performing its safety related function.
DISCUSSION:
This hose is used in the fuel oil supply piping on the KSV diesel engine; it is located in the piping between the engine fuel filter and the fuel injector pumps (see Figure 1 and 2) and is unique to the NPPD-Cooper Station engines.
-- 29.75" NOMINAL LENGTH -
DRY' SEAL--- Al"EROQIUIP HOSE PIPE. THU.
FIGURE 1 FUEL HOSE #2-01 H-050-003
02-03-12;03:43PM; # 5/ 6 Report No. 10CFR21-0104 Revision: 0 Date: 02/02/12 Page: 2 of 3 Fuel filters LOCATIFONSUOE OIL 2-l50 0"
CYL* -4 ,,,,* _43'__.NC,
//c 01 DRA /
Fulinjector pum s"-- - ,--.
FIGURE 2 LOCATIONS OF FUEL HOSE #2-01H-050-003
02-03-12; 03:43PM; # 6/
Report No. 10FR21-0104 Revision: 0 Date: 02/02/12 Page: 3 of a AFFECTED USERS AND SHIPMENTS:
Previous shipments of the hose, part number 2-01 H-050-003, are identified below.
Affected shipments Part Number Customer ESI S.O. Cust. P.O. .... Wt Ship Date 2-01H-050-003 NPPD-Cooper 3008266 4500132314 4* Oct. 2011 2-01H-050-003 NPPD-Cooper 3007377 4500121165 1 Feb.2011 2-01 H-050-003 NPPD-Cooper 112509 4500034077 3 Oct. 2003
- one of these returned for this evaluation CORRECTIVE ACTIONS:
Hoses remaining in customer inventory should be inspected to verify they are free of foreign material prior to installation. Any hoses previously installed on the EDG are not suspect as operability has been confirmed via functional testing.
To prevent recurrence of this issue, the dedication report for the hose assembly has been revised to include a requirement to solvent flush each hose prior to shipment. Filtered solvent will be pumped through the hose for a minimum of 5 minutes. After flushing, nitrogen will be blown through the hose to remove excess flushing fluid and a detailed visual inspection will be performed to ensure there are no visible contaminants immediately prior to installation of the hose end caps. This flushing requirement was already included in the dedication reports for other critical application hose assemblies so this notification is being limited to this part number only.