Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2021-063, Subsequent License Renewal Application Notification, L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report, L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response, L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4, ML21215A316, ML21351A238, ML21351A239, ML21351A241, ML21351A248, ML21354A837, ML21356A011, ML22010A094, ML22010A096, ML22010A097, ML22010A100, ML22012A263, ML22012A282, ML22012A391, ML22013A277, ML22013A282, ML22013A284, ML22013A288, ML22013A292, ML22013A293, ML22013A294, ML22013A295, ML22013A296, ML22013A297, ML22013A301, ML22013A302, ML22013A303, ML22013A304, ML22013A305, ML22013A307, ML22013A316, ML22013A317, ML22013A334, ML22188A086, ML23200A123
|
MONTHYEARL-2021-063, Subsequent License Renewal Application Notification2021-03-17017 March 2021 Subsequent License Renewal Application Notification Project stage: Other L-2021-064, Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C)2021-03-17017 March 2021 Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C) Project stage: Request ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie Project stage: Request ML21215A3172021-08-0303 August 2021 Enclosure 2: Affidavits Supporting Withholding Proprietary Information from Public Disclosure Project stage: Request ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary Project stage: Other ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report Project stage: Other ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions Project stage: Other ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions Project stage: Other ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 Project stage: Other ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx Project stage: Other ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik Project stage: Other ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions Project stage: Other ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions Project stage: Other ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring Project stage: Other ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue Project stage: Other ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue Project stage: Other ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF Project stage: Other ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB Project stage: Other ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural Project stage: Other ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE Project stage: Other ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity Project stage: Other ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA Project stage: Other ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls Project stage: Other ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring Project stage: Other ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions Project stage: Other ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening Project stage: Approval ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout Project stage: Other ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar Project stage: Other ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik Project stage: Other ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik Project stage: Other ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting Project stage: Other ML22012A2822022-01-10010 January 2022 TRP142- St. Lucie SLRA Section 4.2 - Breakout Questions Project stage: Other ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq Project stage: Other ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals Project stage: Other ML22130A6542022-01-11011 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Florida Power & Light (FPL) Project stage: Request ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw Project stage: Other ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil Project stage: Other L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 Project stage: Supplement L-2022-044, Subsequent License Renewal Application Revision 1, Supplement 22022-04-13013 April 2022 Subsequent License Renewal Application Revision 1, Supplement 2 Project stage: Supplement L-2022-071, Subsequent License Renewal Application Revision 1 - Supplement 32022-05-19019 May 2022 Subsequent License Renewal Application Revision 1 - Supplement 3 Project stage: Supplement L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response Project stage: Request ML22188A0862022-07-0707 July 2022 SLRA - Audit Report Project stage: Other L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response Project stage: Other L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 Project stage: Supplement L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response Project stage: Request ML22325A0672022-11-18018 November 2022 RAI Set 4 Project stage: Request 2022-01-04
[Table View] |
|
---|
Category:Graphics incl Charts and Tables
MONTHYEARL-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx L-2021-137, GL 2004-02 Debris Transport Calculation Non-Conservatism2021-07-23023 July 2021 GL 2004-02 Debris Transport Calculation Non-Conservatism L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information2016-05-11011 May 2016 Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15224B4492015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15236A0762015-09-0303 September 2015 Enclosure, Revised St Lucie Tables-LQ-W ML15231A4122015-08-21021 August 2015 FPL St. Lucie Capture Summary 2015 ML15231A4172015-08-21021 August 2015 Power Plant Causal Turtles L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2015-03-24024 March 2015 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2014-340, RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 42014-11-0606 November 2014 RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 4 L-2013-067, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20122013-02-14014 February 2013 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2012 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12073A1512012-03-0606 March 2012 NRR E-mail Capture - St. Lucie Discharge Headwall Project L-2010-096, Extended Power Uprate Data for NRC Confirmatory EPU Analyses2010-06-0404 June 2010 Extended Power Uprate Data for NRC Confirmatory EPU Analyses L-2009-078, Extended Power Uprate Data for NRC Confirmatory EPU Analyses2009-04-0202 April 2009 Extended Power Uprate Data for NRC Confirmatory EPU Analyses L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses2008-10-29029 October 2008 Extended Power Uprate, Data for NRC Confirmatory EPU Analyses L-2008-178, Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-042008-08-0505 August 2008 Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-04 ML0808506472008-03-19019 March 2008 NDE Report on PSL-1 Pressurizer Nozzles ML0810502642008-03-19019 March 2008 NDE Report, on PSL-1 Pressurizer Nozzles, Attachment 2 L-2008-018, Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results2008-02-21021 February 2008 Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results L-2008-002, Corporate Merger of Decommissioning Trustee2008-01-0303 January 2008 Corporate Merger of Decommissioning Trustee ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0526603212005-09-21021 September 2005 Tech Spec Pages for Amendment No. 196, Extension of the Reactor Coolant System Pressure/Temperature Curve Limits 2024-03-13
[Table view] |
Text
St. Lucie Units 1 and 2 SLRA TRP 148.1 Breakout Audit Questions
Technical Reviewer Eric Reichelt 12/08/2021 Technical Branch Chief Matt Mitchell 12/13/2021
TLAA Section 4.7.1 Leak-Before-Break of Reactor Coolant System Piping
- SLRA SLRA Page Question / Issue Why are we asking? Outcome of Section Discussion
- 1. 4.7.1 963/964 In the Time Limited Aging Analysis (TLAA), it SRP 3.6.3 of NUREG -0800 states that Alloy 82/182 welds are susceptible states that PWSC C is considered to primary water stress corrosion cracking an active degradation mechanism
( PWSCC ) and have been conservatively in Alloy 600/82/182 materials in evaluated to consider the effects of PWSCC. PWRs and needs to be Please provide additional information to addressed.
specifically describe what evaluations were made to the Alloy 82/182 welds that are present at the Port St. Lucie ( PSL) Unit 1 and 2 reactor coolant pump ( RCP ) suction and discharge nozzles. Please identify how the applicant is demonstrating that PWSCC is not a potential source of pipe rupture as required in Standard Review Plan ( SRP) 3.6.3 Revision 1.
- 2. 4.7.1 N/A Considering the evaluations made to the Alloy SRP 3.6.3 of NUREG -0800 82/182 welds by PSL as described above, is states that PWSCC is considered PSL considering an overlay of Alloy 52/152 to an active degradation mechanism minimize the susceptibility to PWSCC? How in Alloy 600/82/182 materials in is PSL planning to monitor these welds for pressurized water reactors potential leakage? ( PWRs) and needs to be addressed.
3. 4.7. 1 963 In the TLAA, it states that the fatigue crack Fatigue crack growth analysis is growth flaw analysis originally included in based on transient cycles. As a CEN-367-A used generic design basis method for managing possible transient cycles that enveloped the projected fatigue flaw growth, a monitoring
80 year transient cycles for PSL Units 1 and 2 program may be an acceptable to calculate the crack growth. Does PSL have alternative.
a monitoring program that provides an acceptable method for managing the fatigue flaw growth aspect of the Leak Before Break (LBB) evaluation for the subsequent period of extended operation (SPEO)?
- 4. 4.7.1 963 In the TLAA Evaluation, it states the fracture Fracture toughness correlations toughness correlations from NUREG/CR-4513 need to be to the correct version were used for the full aged condition and are of NUREG-4513 Rev. 2 with applicable for plants operating at 15 effective errata.
full power years (EFPY) for the A351-CF8M materials. Please expand to state if Rev. 1 or Rev. 2 of NUREG/CR-4513 was used for the fracture toughness correlations. In addition, at the time of the correlations, was PSL aware of the errata for Rev. 2 of NUREG-4513 which had a recurring typographical error (the symbol ) was found in the document instead of the symbol. The errata corrected the symbols from 15 EFPY to read 15 EFPY for CF8M materials (refer to ML16145A082).
Please review the fracture toughness correlations used for the fully aged condition for plant operation based on the revised errata.