(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Extraction Steam is when steam is siphoned off of the exhaust from the turbine and is used to reheat feedwater going back to the vessel.
System |
---|
|
|
| Site | Start date | Title | Description |
---|
ML24213A085 | Vogtle | 31 July 2024 | Final RO Written Exam Vogtle, Units 3 and 4, 2024-301 Combined (Redacted for Public Release) | | ML24155A146 | Summer | 30 May 2024 | Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 | | ML24135A089 | Turkey Point | 9 May 2024 | Periodic Update to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | | NMP2L2880, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum | Nine Mile Point | 1 May 2024 | Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum | | ML24121A071 | | 30 April 2024 | Lwrs Newsletter April 2024 | | ML24116A052 | Point Beach | 23 April 2024 | Periodic Update of the Updated Final Safety Analysis Report, Chapter 13, Site Surveillance and Testing Programs | | L-2024-063, Periodic Update of the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (Redacted) | Point Beach | 23 April 2024 | Periodic Update of the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (Redacted) | | ML24116A056 | Point Beach | 23 April 2024 | Periodic Update of the Updated Final Safety Analysis Report, List of Effective Pages and Table of Contents | | IR 05000321/2024001 | Hatch | 22 April 2024 | Integrated Inspection Report 05000321/2024001 and 05000366/2024001 | | ML24109A097 | Monticello | 17 April 2024 | 1 to the Updated Safety Analysis Report, Chapter 15, USAR Drawings, Table of Contents | |
|