Public Version of Revision 7 to Emergency Plan Implementing Procedure Qep 110-1, Station Director Implementing Procedure & Revision 4 to Qep 340-1, Operation During Earthquake Conditions
ML20054H492
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/18/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20054H483 List:
References
PROC-820518-01, NUDOCS 8206240128
Download: ML20054H492 (10)


Text

. _ - _ _ _ _ . _ . . - _ . . . - _-

, QEP 110-0 Rsvicica 8 ID/1A,1B' STATION DIRECTOR O E03 Station Director Rev. 8 05-18-82 110-1 Station Director Implementing Procedure Rev. 7 05-18-82 110-2 Acting Station Dire'ctor (Shift Engineer) Implementing Procedure Rev. 1 04-15-82 110-T1 RCT Task Prioritization Rev. 1 04-15-82 1

l (0

)

i APPROVED O MAY 181982 Q. C. O. S. H.

8206240128 820618 PDR ADOCK 05000254 (final)

F PDR

t QEP 110-1 O . .

STATION DIRECTOR Revision 7 May 1982 IMPLEMENTING PROCEDURE l ID/ID A. PURPOSE The purpose of this procedure is to outline the method used to implement the Station Director duties.

B. REFERENCES

1. GSEP Phone List.

I

2. QEP 200-2, Classification of an Incident Involving Hazardous Material.
3. QEP 200-T1, Quad-Cities Emergency Action Levels.
4. QEP 310-1, Initial Notification.

t

5. QEP 360-2, Plant Evacuation and Assembly.
6. QEP 360-3, Site Evacuation.
7. QEP 110-T1, RCT Task Prioritization.

, [ C. PREREQUISITES

1. None.

1 D. PRECAUTIONS APPROVED 1, yoo,, MAY 181982 E. LIMITATIONS AND ACTIONS i

1. Responsibilities.
a. To have responsible charge of the GSEP Station group and direct a staff in organizing and coordinating the emergency efforts at and within the immediate vicinity of the station.
b. To ensure adequate manning and access control of the Onsite TSC when activated.
c. To keep the GSEP Command Center Director fully informed of the status of the emergency and the measures being taken to deal with the emergency.
d. Establish agreements required for service specified in Section 4 of the site annex unless another Director has been assigned the O responsibility of obtaining this agreement.

- - . , , - - - - . ~ ---u.- - ,, - - , - , , - - -

w

QEP 110-1

/

Rsvioica 7

2. Notification.

O a. Initial notification by:

(1) Shift Engineer.

(2) Senior NSO.

3. The Station Director has the authority for declaring an emergency, recommending protective actions to local authorities, and authorizing emergency radiation exposures in excess of 10 CFR 20.101 limits. This authority may not be delegated.

F. PROCEDURE

1. Obtain information as required from:
a. Shift Engineer.
b. Radiation Protection Department. The RCT's should conduct appro-priate surveys and sampling activities until the arrival of the Rad / Chem Director. Prioritize RCT sampling tasks to ensure the acquisition of the most pertinent data during the early phases of a GSEP condition. Samples should be obtained in the order listed in QEP 110-T1, if possible.

/ 2. Categorize the incident using procedures QEP 200-2 and 200-T1.

a. Transportation Accident.
b. Unusual Event.
c. Alert.
d. Site Emergency.
e. General Emergency.
3. Notify the following as necessary per the instructions given by procedure QEP 310-1:
a. System Power Supply Load Dispatcher.
b. Station Director,
c. Command Center Director.
d. Operations Director.
e. Technical Director.

APPROVED

f. Maintenance Director.

(s_) MAY 181982 l

Q.C.O.S.R.

l L

a QEP 110-1

  • Rzvisica 7
g. Stores Director.

O h. Administrative Director.

< i. Security Director.

J. Rad / Chem Director.

4. Actions required-complete as necessary.
a. Personnel Accounting-contact Security Director.

(1) Personnel accounted for or assembled.

(2) Personnel missing (list) i

b. Injured personnel-contact Operations Director.

(1) Radiation Protection notified for first aid /surve) and de-contamination.

( (2) Ambulance arranged.

(3) Hospital House Supervisor Notified.

(4) Command Center notified.

i NAME HOSPITAL AMBULANCE

! APPROVED O uny 18 i982 Q.C.O.S.M.

l l  !

l , . . . _ . _ - . _ _ __ _

QEP 110-1 Rrvielen 7

c. Plant Access-contact Security Director. APPRCh/ED sl (1) Gate House secure. htAY 181982 (a) Locked by guard. Q C. U. S g (b) Open to allow off-site access and notified to direct off-site assistance.
d. Evacuation planned-contact Operations Director. .

(1) Non-essential personnel-list groups l

l (2) Site evacuation-contact Operations Director.

(a) Route planned.

i l (b) Estimated dose expected.

( ) (c) Assembly area.

1.

2.

3.

(d) Survey personnel available.

(3) Local area evacuation-proposed. (Refer to generic GSEP tables 6.3-1 and 6.3-2, and Section 7.3.3.)

(a) Sector (s) involved and avoidable dose. l (b) Coordination through:

1. Illinois Emergency Services and Disaster Agency.
2. Iowa Office of Disaster Services.

(c) Environs team notified for assistance and continuing information.

e. Contact Industrial Relations regarding injuries (after incident is O under control).

i QEP 110-1 I

5 Revision 7

f. Recovery.

O (1) Determine extent of contamination.

.a) On-Site - contact Rad / Chem Director.

(b) OffSite - contact Environs Director.

(2) Protective measures set for personnel.

(3) Dose management set.

(4) Unit status set and stable-contact Operations Director.

(5) Damage estimated.

(6) Development of specific recovery plans.

G. CHECKLISTS

1. None.

H. TECHNICAL SPECIFICATION REFERENCES

1. None.

( ,

i i

l APPROVED MAY 181982 O Q.c.o. s. R.

( final)

, . . _ - . _ . _ _ _ _ . _ - _ . _ _ - ..- ~..__.._ _ ..__ . _ . ~ . . , , - . _ . _ - - _

!- QAP 1100-T5 Revisica 6 STATION PROCE DENTON .ON COVER SHEET Oct:bar 1981 ID/1Z Ps.# Revision Dese ption M O adj o yn l mgp 3yo_i_

I Chapter Procedure M

i M M el l M- Y Originator. Revision e L--

f -- . __ ..- - -. __.....

This procedure is required to be implemented prior to

. Data because of DRAFT REVIEW FINAL APPROVAL Tech.. Staff Supervisor Date l

l 7

'D p Q ~ /4 0 08/6 ,1 9,pp, Date Department Head G- ced2- db?/rt Data Tech. S upervisor Date O Ori Si ator l . &eoenots c/tel93 D t- Asst. S Pt. Date Atmt0RIZATION I

/ [$bluA J~kFh

_______________l..8***E".8"'_*"***S_d*".*_.*f****!*."**_*

INSTRUCTIONS FOR REVISION INSERTION REMOVE' INSERT QEP 39'O-0 2El/ 7 @EP 3V0 ~O IEW5 '

Q6P y/c / 25t/3. .

Q CP h VO-/ !? O Y

, REVISION RECEIPT FORM Please sign and date below, and return this sheet to the Officer Supervisor -

Quad Cities Station. Your Station Procedure copy number is #7 s

Signature Date (final) Il0V 6 1531 Q.c.o.s. a. .

QEP 340-0 R;vinien 8 ID/1Q,1N CORRECTIVE ACTIONS

() 340-0 Corrective Actions Rev. 8 05-18-82 340-1 Operation During Earthquake Conditions Rev. 4 05-18-82 340-2 Operation During Tornado Warning Rev. 1 06-20-80 340-3 Lock and Dam Number 14 Failure Rev. 2 02-19-81 340-4 Action to be Taken in the Event of an Oil Spill to the Mississippi River Rev. 3 12-07-81 340-5 Station Fire Fighting Rev. 4 02-16-82 340-S1 Fire Drill Worksheet Rev. 2 10-03-80 (CS) l l

APPROVED o

V MAY 181982 Q. C. O. S. K.

(final)

9

[ -

s QEP 340-1 Revision 4 OPERATION DURING EARTHQUAKE CONDITIONS May 1982 ID/4I A. PURPOSE The purpose of this procedure is to guide action to be taken during earth-quake conditions'.

B. REFERENCES

1. None.

C. PREREQUISITES

1. An earthquake is reported.
2. Actuation of the seismic detector and recorder.

D. PRECAUTIONS

1. A seismic detector and recorder are used to record local earthquake intensity. .

E. LIMITATIONS AND ACTIONS (O

1. If plant conditions are not normal, the reactor must be shutdown and depressured to atmospheric conditions.
2. Off-site seismic information may be obtained from the National' Earthquake Information Center in Boulder, Colorado 80302.

F. PROCEDURE

1. Immediate Action.
a. Verify plant operating conditions are normal.
b. If conditions are not normal, Unit 1 (Unit 2) reactor must be shut down and depressurized to atmospheric conditions.
2. Subsequent Action.
a. Inspect plant for damage and possible leaks.
b. Verify no abnormal changes in the following:

(1) Feedwater flow.

(2) Condenser vacuum.

(3) Unit load.

(4) Main steam flow.

_1

1 o

p QEP 340-1 Rsvision 4

c. Verify drywell for the following:

O '

(1) Equipmentsumpan'd510ordrainsumpdischargeratesnormal.

(2) Air sample system activity normal.

(3) Temperatures normal at recorders and indicator at drywell environs rack 2251(2)-38.

(4) Leak detection system temperatures normal on panel 901-21 (902-21).

d. Verify turbine building air sample system activity normal.
e. Verify main steam line and turbine extraction piping is not damaged.
f. Verify there is no sudden increase in off gas flow.
g. Verify there is no suddea increase in off gas and stack gas acti-vity.
h. Verify there are no spurious trips of equipment.
3. If the seismic detector (strong-motion accelerograph) in the Unit I condensate pump room basement has actuated, an ACTION indicating light will be on to indicate the system has been triggered. If it has triggered, notify the Master Instrument Mechanic and have the IM's

(..~ perform the following:

a. Obtain key for accelerograph from I.M. Shop.
b. Insert key and turn to TEST.
c. Engage the test toggle switch and hold for 1 second. Repeat several times to make sure all recordings are in the take-up magazine,
d. Remove cover-from the accelerograph.
e. Detach the take-up magazine, move it 1 or 2 inches away from the i camera, and cut the film. Reset the. ACTION light.

l

f. Process tue film and replace cover.
g. Refer to Teledyne-Geotech Manual for interpretation of results.

r G. CHECKLIST

1. None.

H. TECHNICAL SPECIFICATION REFERENCES APPROVED o

d 1. None. MAY 181982 Q. C. O. d. M l