MONTHYEARIR 05000602/20232012023-07-31031 July 2023 University of Texas at Austin - NRC Safety Inspection Report No. 05000602/2023201 ML23193B0332023-07-31031 July 2023 University of Texas at Austin - NRC Security Inspection 2023202 IR 05000602/20222012023-01-25025 January 2023 University of Texas at Austin - U.S. Nuclear Regulatory Commission Special Inspection Report 05000602/2022201 IR 05000602/20212012022-01-26026 January 2022 University of Texas at Austin - Us Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000602/2021201 IR 05000602/20202012021-05-0707 May 2021 University of Texas at Austin - Nuclear Regulatory Commission Security Inspection Report No. 05000602/2020201 - Cover Letter Only (Public) IR 05000602/20202022021-01-0606 January 2021 University of Texas at Austin - Nuclear Regulatory Commission Routine Inspection Report 05000602/2020202 IR 05000602/20192012019-12-23023 December 2019 University of Texas - Austin U.S. Nuclear Regulatory Commission Routine Inspection Report NO.50-0602/2019-201 IR 05000602/20182012019-05-22022 May 2019 University of Texas at Austin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-602/2018-201 IR 05000602/20172012017-12-14014 December 2017 University of Texas at Austin - U.S. Regulatory Commission Security Related Inspection Report No. 50-602/2017-201 Cover Letter IR 05000602/20162012016-12-0505 December 2016 University of Texas at Austin - Nuclear Regulatory Commission Routine Inspection Report No. 50-602/2016-201 IR 05000602/20152012015-10-0202 October 2015 IR 05000602/2015201, on 08/31 - 09/03/2015, University of Texas at Austin, NRC Routine Inspection Report IR 05000602/20092012009-10-0101 October 2009 IR 05000602-09-201 on 09/14/09 - 09/17/09 for University of Texas at Austin IR 05000602/20072022007-11-16016 November 2007 IR 05000602-07-202, on 11/07/2007 - 11/08/2007, for Univ. of Texas at Austin Nuclear Engineering Teaching Laboratory IR 05000602/20072012007-11-16016 November 2007 NRC Inspection Report No. 50-602/2007-201 IR 05000602/20062012006-11-21021 November 2006 IR 05000602-06-201, University of Texas - Austin, Primary Focus of This Routine, Announced Insp Included Onsite Review of Selected Aspects of the Licensee'S Class II Research Reactor Safety Program.... IR 05000602/20052012005-12-22022 December 2005 NRC Inspection Report No. 05000602-05-201, Univ of Texas at Austin IR 05000602/19982011999-03-0202 March 1999 Insp Rept 50-602/98-201 on 981207-11.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000602/19972011998-01-0909 January 1998 Forwards Insp Rept 50-602/97-201 on 970929-1003.No Violations Noted.Previous Level IV Violation Was Closed IR 05000192/19920021993-01-0505 January 1993 Insp Repts 50-192/92-02 & 50-602/92-02 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected: Organization & Staffing,Procedures,Operator Requalification Training,Health Physics Program & Physical Security IR 05000602/19910011991-07-23023 July 1991 University of Texas Construction Inspection Report 05000602/1991001 IR 05000602/19900041990-08-0202 August 1990 University of Texas Construction Inspection Report 05000602/1990004 IR 05000602/19900031990-07-27027 July 1990 University of Texas Construction Inspection Report 05000602/1990003 IR 05000602/19900021990-05-0909 May 1990 University of Texas Construction Lnspection Report 05000602/1990002 IR 05000602/19900011990-04-16016 April 1990 University of Texas Construction Lnspection Report 05000602/1990001 IR 05000602/19890071990-01-11011 January 1990 University of Texas Construction Inspection Report 05000602/1989007 IR 05000602/19890061989-11-29029 November 1989 University of Texas Construction Inspection Report 05000602/1989006 IR 05000192/19890021989-07-13013 July 1989 University of Texas Construction Inspection Reports 05000192/1989002 & 05000602/1989004 IR 05000192/19890031989-07-0606 July 1989 University of Texas Construction Inspection Reports 05000192/1989003 & 05000602/1989005 IR 05000602/19890031989-05-23023 May 1989 University of Texas Construction Inspection Report 05000602/1989003 IR 05000602/19890021989-04-27027 April 1989 University of Texas Construction Inspection Report 05000602/1989002 IR 05000192/19890011989-02-10010 February 1989 University of Texas Construction Inspection Reports 0500192/1989001 & 0500602/1989001 IR 05000602/19880051988-10-12012 October 1988 Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted.Major Areas Inspected:Mechanical Equipment, Piping,Electrical Sys Installation,Const Progress & Schedule Status IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 IR 05000602/19880041988-08-0404 August 1988 University of Texas Construction Inspection Report 05000602/1988004 IR 05000602/19880031988-07-0505 July 1988 University of Texas Construction Inspection Report 05000602/1988003 IR 05000192/19880011988-06-0808 June 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-01 & 50-602/88-01.Based on Listed Understanding of Util Response, Per 880516 Telcon,Actions Responsive to NRC Concerns IR 05000602/19870011987-12-18018 December 1987 University of Texas Construction Lnspection Report 05000602/1987001 IR 05000192/19860011986-06-0404 June 1986 University of Texas Construction Inspection Reports 05000192/1986001 & 05000602/1986001 2023-07-31
[Table view] Category:Letter
MONTHYEARML23332A1052023-12-0707 December 2023 University of Texas at Austin - Regulatory Audit Re Renewal of Facility Operating License No. R-129 for Its Triga Mark II Nuclear Reactor ML23258A1622023-09-15015 September 2023 Submission of Environmental Report for the University of Texas at Austin Research Reactor in Support of License Renewal ML23216A2122023-08-0404 August 2023 Univ. of Texas - Austin, Submittal of Draft Safety Analysis Report for the Support of License Renewal ML23193B0332023-07-31031 July 2023 University of Texas at Austin - NRC Security Inspection 2023202 IR 05000602/20232012023-07-31031 July 2023 University of Texas at Austin - NRC Safety Inspection Report No. 05000602/2023201 ML23195A1802023-07-14014 July 2023 Submission of Revised Draft Safety Analysis Report (Chapters 4 and 13) Incorporating Neutronic and Thermal Hydraulic Analysis for the University of Texas at Austin Research Reactor ML23129A2432023-05-10010 May 2023 University of Texas at Austin Notice of Violation ML23102A1422023-04-13013 April 2023 Examination Confirmation Letter No. 50-602/OL-23-02, University of Texas at Austin ML23065A3032023-04-11011 April 2023 University of Texas at Austin Issuance of Amendment No. 8 to Facility Operating License R-129, for the University of Texas at Austin Triga (Training, Research, Isotopes, General Atomics) Nuclear Research Reactor to Change Paragraphs 2.B.(2) ML23074A2142023-03-16016 March 2023 Transmittal of 2022 Annual Report for the University of Texas Triga II Nuclear Research Reactor ML23052A1712023-03-0707 March 2023 University of Texas at Austin - Report on the Regulatory Audit Renewal of Facility Operating License No. R-129; Docket No. 50-602 ML23067A1962023-03-0707 March 2023 Univ of Texas - Austin, Reply to a Notice of Violation ML23067A2092023-02-25025 February 2023 University of Texas at Austin - Response to Apparent Violations in NRC Special Inspection Report 05000602/2022201; EA-22-134 ML23040A3032023-02-0909 February 2023 Univ of Texas - Austin, Submittal of Neutronics Report and Thermal Hydraulic Analysis of the Triga Reactor IR 05000602/20222012023-01-25025 January 2023 University of Texas at Austin - U.S. Nuclear Regulatory Commission Special Inspection Report 05000602/2022201 ML22322A1142022-11-16016 November 2022 the University of Texas Nuclear Research Reactor 14-Day Report ML22333A6232022-11-16016 November 2022 University of Texas, Submittal of 14-Day Report for Event Number 56198 ML22224A1432022-09-13013 September 2022 Examination Confirmation Letter No 50-602/OL-23-01, University of Texas at Austin ML22269A4792022-09-0909 September 2022 Request for Revision of Uranium and Plutonium Forms in License R-129 ML22224A1222022-08-22022 August 2022 University of Texas at Austin Change of Facility Backup Project Manager ML22164A0092022-06-13013 June 2022 Annual Report for the University of Texas Triga II Nuclear Research Reactor ML22164A0062022-06-13013 June 2022 Univ of Texas - Austin, Change in Level 1 Management ML22130A1752022-05-17017 May 2022 University of Texas at Austin Interim Status Report on the Regulatory Audit Re Renewal of Facility Operating License No R-129 IR 05000602/20212012022-01-26026 January 2022 University of Texas at Austin - Us Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000602/2021201 ML21272A1662021-10-0404 October 2021 University of Texas at Austin Change of Facility Project Manager ML21266A4062021-09-0101 September 2021 Notification of a Change in Level 1 Management for the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL) ML21077A1202021-03-0909 March 2021 Transmittal of 2019 Annual Report for the University of Texas Triga II Nuclear Research Reactor ML21077A0792021-02-0808 February 2021 Univ. of Texas - Austin, Revision of Physical Security Plan ML21015A3422021-01-19019 January 2021 University of Texas at Austin - Review of the Physical Security Plan in Support of Renewal of Facility Operating License No. R-129 IR 05000602/20202022021-01-0606 January 2021 University of Texas at Austin - Nuclear Regulatory Commission Routine Inspection Report 05000602/2020202 ML20345A1362020-12-0202 December 2020 the University of Texas at Austin - Draft Physical Security Plan for Comment ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20290A4642020-10-0101 October 2020 Notification of a Change in Level 1 Management for the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL) ML20203M1662020-07-23023 July 2020 University of Texas at Austin - Regulatory Audit Renewal of Facility Operating License No. R-129 ML20206K9492020-06-24024 June 2020 Notification of a Change in Level 1 Management for the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL) ML20115E2932020-04-16016 April 2020 University of Texas, Austin, Revised Submission of Neutronic and Thermal Hydraulic Analysis ML20097C6512020-03-31031 March 2020 Univ. of Texas - Austin - Submittal of Neutronic and Thermal Hydraulic Analysis ML20072H3352020-03-0303 March 2020 2019 Annual Report for the University of Texas Triga II Nuclear Research Reactor IR 05000602/20192012019-12-23023 December 2019 University of Texas - Austin U.S. Nuclear Regulatory Commission Routine Inspection Report NO.50-0602/2019-201 ML19337A4352019-11-25025 November 2019 Univ. of Texas - Austin - Request_ for Extension of Date for Completion of Neutronic and Thermal-Hydraulic Analyses ML19312C0042019-11-12012 November 2019 University of Texas at Austin - Extension to Revised Schedule for the Completion of the Reactor Analyses Renewal of Facility Operating License No. R 129 for the University of Texas at Austin Research Reactor ML19281E0142019-10-0909 October 2019 Examination Report No. 50-602/OL-19-01, University of Texas at Austin ML19065A1972019-09-0505 September 2019 University of Texas at Austin - Issuance of Amendment No. 7 to Facility Operating License No. R 129 to Increase the Special Nuclear Material Possession Limits for the University of Texas at Austin Research Reactor ML19225D1372019-08-13013 August 2019 the University of Texas at Austin Submittal of Revised Response to Request for Additional Information Regarding Physical Security Plan ML19234A1102019-08-12012 August 2019 Revised Schedule for Completion of the Reactor Analyses for the University of Texas at Austin Research Reactor ML19200A1922019-07-26026 July 2019 University of Texas at Austin - Approval of the Revised Operator Requalification Program Renewal of Facility Operating License No. R 129 for the University of Texas at Austin Research Reactor ML19176A4832019-07-0303 July 2019 Examination Confirmation Letter No. 50-602/OL-19-01, University of Texas at Austin ML19119A1282019-06-0606 June 2019 University of Texas at Austin - Acceptance of Requested Licensing Action IR 05000602/20182012019-05-22022 May 2019 University of Texas at Austin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-602/2018-201 ML19121A4232019-04-25025 April 2019 Univ. of Texas - Austin - Submittal of Changes to License Emergency Plan Under 10CFR50.54(q) 2023-09-15
[Table view] |
Text
July 31, 2023
SUBJECT:
UNIVERSITY OF TEXAS AT AUSTIN - U.S. NUCLEAR REGULATORY COMMISSION SAFETY INSPECTION REPORT NO. 05000602/2023201
Dear Dr. Charlton:
From April 11-14, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an inspection at the University of Texas at Austin, Nuclear Engineering Teaching Laboratory. The enclosed report presents the results of that inspection, which were discussed on April 14, 2023, with you and members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed various activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this inspection, please contact Andrew Waugh at (301) 415-0230, or by email at Andrew.Waugh@nrc.gov.
Sincerely, Signed by Tate, Travis on 07/31/23 Travis L. Tate, Chief Non-Power Production and Utilization Facility Oversight Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-602 License No. R-129 Enclosure:
As stated cc w/enclosure: GovDelivery Subscribers
ML23193B029 NRC-002 OFFICE NRR/DANU/UNPO/RI NRR/DANU/UNPO/RI NRR/DANU/UNPO/LA NRR/DANU/UNPO/BC NAME AWaugh JArellano NParker TTate DATE 7/13/2023 7/19/2023 7/20/2023 7/312023
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION Docket No.: 50-602 License No.: R-129 Report No: 05000602/2023201 Licensee: The University of Texas at Austin Facility: Nuclear Engineering Teaching Laboratory Location: Austin, Texas Dates: April 11-14, 2023 Inspectors: Andrew Waugh Juan Arellano Approved by: Travis L. Tate, Chief Non-Power Production and Utilization Facility Oversight Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Enclosure
EXECUTIVE SUMMARY The University of Texas at Austin Nuclear Engineering Teaching Laboratory Inspection Report No. 05000602/2023201 The primary focus of this routine announced inspection was the onsite review of selected aspects of the University of Texas at Austins (UTA, the licensees) Nuclear Engineering Teaching Laboratory (NETL) safety program, including: (1) procedures; (2) experiments; (3) health physics (HP); (4) design changes; (5) committees, audits and review; and (6) transportation of radioactive materials. The U.S. Nuclear Regulatory Commission (NRC)
staff determined that the licensees program was acceptably directed toward the protection of public health and safety, and in compliance with NRC requirements.
Procedures The inspectors determined that procedures were controlled, maintained current, implemented, and followed in compliance with technical specifications (TSs) and license requirements.
Experiments The inspectors determined that experiments were reviewed, approved, and conducted in accordance with TS, procedural, and regulatory requirements.
Health Physics The inspectors determined that the licensees HP program was conducted in accordance with TS, procedural, and regulatory requirements.
Design Changes The inspectors determined that design changes were conducted in accordance with TS, procedural, and regulatory requirements.
Committees, Audits and Reviews The inspectors determined that the licensees oversight programs were conducted in accordance with TS and procedural requirements.
Transportation Activities The inspectors determined that the licensees radioactive material transportation program was in accordance with regulatory and procedural requirements.
-2-
REPORT DETAILS Summary of Facility Status The UTAs 1.1-megawatt Training, Research, Isotopes, General Atomics Mark II research reactor continued routine operations. During this inspection, the reactor was started up, operated, and shut down to support laboratory experiments and operator training.
1. Procedures a. Inspection Scope (Inspection Procedure [IP] 69001, Section 02.03)
The inspectors reviewed various procedures and observed their implementation, including a startup checks, reactor startup, irradiation experiment, and reactor shutdown.
The inspectors also reviewed the following regarding the licensees procedures to ensure that the requirements of the licensees administrative procedures and TS 6.3 were met:
records of UTA Reactor Oversight Committee (ROC) procedure review and approval for 2021 and 2022 NETL procedure PLAN-O, Call and Notification, dated November 9, 2000 NETL procedure PLAN-S, Physical Security, dated August 9, 2022 NETL procedure MAIN-1, Interlocks and Scram Features, dated May 24, 2021 NETL procedure SURV-3, Excess Reactivity and Shutdown Margin, dated May 24, 2021 NETL procedure MAIN-4, Area Radiation Monitor Systems, dated May 24, 2021 b. Observations and Findings The inspectors observed that the licensee maintained written procedures covering the areas specified in TS 6.3. The inspectors found that the procedures in use by the licensee were current, reviewed and approved as required by TS 6.3, able to be implemented as intended, and adhered to by reactor personnel.
c. Conclusion The inspectors determined that procedures were controlled, maintained current, implemented, and followed in compliance with TS and license requirements.
2. Experiments a. Inspection Scope (IP 69001, Section 02.06)
The inspectors observed the performance of an irradiation experiment and reviewed the following to ensure that experiments were reviewed and conducted as required by TS 3.4 and 6.4:
select Operational Request, forms dated 2021-present Experimental Authorizations, dated 2021-present-3-
2020, 2021, and 2022 annual operating reports ROC meeting minutes, dated 2020-present b. Observations and Findings The inspectors found that experiments were reviewed and approved as required by TS 6.4 and Title 10 of the Code of Federal Regulations (10 CFR) 50.59, Changes, tests and experiments. The inspectors also found that experiments were conducted in accordance with the licensees procedures and TS 3.4.
c. Conclusion The inspectors determined that experiments were reviewed, approved, and conducted in accordance with TS, procedural, and regulatory requirements.
3. Health Physics a. Inspection Scope (IP 69001, Section 02.07)
The inspectors toured the facility, observed radiation surveys, and observed radiological signs and postings. The inspectors also reviewed the following to ensure the licensees HP program adheres to the requirements of 10 CFR Part 19, Notices, Instructions and Reports to Workers: Inspection and Investigations, 10 CFR Part 20, Standards for Protection against Radiation, and TS 3.3 and 4.3:
select weekly restricted surveys, dated 2021-present select bi-monthly fuel pit surveys, dated 2021-present select bi-monthly reactor pool water samples, dated 2021-present select personnel and area dosimetry records, dated 2020-present select calibration records for radiation monitors, dated 2020-present NETL procedure MAIN-4, "Area Radiation Monitor Systems," dated May 24, 2021 NETL procedure ADMN-4, "Radiation Protection Program," dated October 23, 2006 b. Observations and Findings The inspectors found that practices regarding the use of dosimetry, radiation monitoring equipment, placement of radiological postings, posting of notices, use of protective clothing, and the handling and storing of radioactive material or contaminated equipment was in accordance with regulations and the licensees radiation protection program. The inspectors found that the licensee met the regulatory requirements concerning radiological effluent releases and radiation survey, sampling, and monitoring. The inspectors also found that training was conducted for radiation workers and as low as reasonably achievable principles were implemented as required by licensee procedures.
c. Conclusion The inspectors determined that the licensees HP program was conducted in accordance with TS, procedural, and regulatory requirements.
-4-
4. Design Changes a. Inspection Scope (IP 69001, Section 02.08)
The inspectors reviewed the following to ensure that modifications to the facility were made in accordance with the requirements of 10 CFR 50.59 and TS:
2020, 2021, and 2022 annual operating reports NETL procedure ADMN-1, "NETL Procedure Outline and Control," dated April 8, 2010 design change forms, dated 2020-present ROC meeting minutes, dated 2020-present b. Observations and Findings The inspectors found that design changes were reviewed and approved as required by 10 CFR 50.59. The inspectors also found that the performance of modified equipment and the procedures and drawings related to that equipment met regulatory, TS, and procedural requirements.
c. Conclusion The inspectors determined that design changes were conducted in accordance with TS, procedural, and regulatory requirements.
5. Committees, Audits and Reviews a. Inspection Scope (IP 69001, Section 02.09)
The inspectors reviewed the following to ensure that committees, audits, and reviews were conducted as required by the licensees procedures and TS 6.2:
ROC meeting minutes, dated 2020-present 2020, 2021, and 2022 audits of operation and maintenance logs 2021 audit of the operator requalification program 2021 and 2022 audits of the emergency plan, physical security plan, and implementing procedures 2020, 2021, and 2022 annual operating reports b. Observations and Findings The inspectors found that the licensees reactor oversight committee met and provided reviews as required by the TS. The inspectors also found that problems identified from the licensees required reviews and audits which were resolved in accordance with the licensees procedures and TS.
c. Conclusion The inspectors determined that the licensees oversight programs were conducted in accordance with TS and procedural requirements.
-5-
6. Transportation Activities a. Inspection Scope (IP 86740)
The inspectors reviewed the following to ensure the licensees program for transporting radioactive materials met NRC and Department of Transportation (DOT) requirements:
NETL procedure HP-006, "Radioactive Material Control," dated January 16, 2013 records of radioactive material shipments from 2021-present transportation training records b. Observations and Findings The inspectors found that the licensees procedures and records concerning the transportation of radioactive material were in accordance with NRC and DOT requirements.
c. Conclusion The inspectors determined that the licensees radioactive material transportation program was in accordance with regulatory and procedural requirements.
7. Exit Interview The inspection scope and results were summarized on April 14, 2023, with members of licensee management and staff. The inspectors described the areas inspected and discussed the inspection results. The licensee acknowledged the results of the inspection.
-6-
PARTIAL LIST OF PERSONS CONTACTED Licensee Director, NETL P.M. Whaley Associate Director, NETL J. Terry Reactor Supervisor, NETL T. Tipping Reactor Health Physicist and Laboratory Manager J. Bekker Junior Health Physicist T. Bannon Reactor Operator R. Duran Reactor Operator INSPECTION PROCEDURES USED IP 69001 Class II Research and Test Reactors IP 86740 Inspection of Transportation Activities ITEMS OPENED, CLOSED, AND DISCUSSED Opened:
None Closed:
None Discussed:
None Attachment