University of Texas at Austin - Extension to Revised Schedule for the Completion of the Reactor Analyses Renewal of Facility Operating License No. R 129 for the University of Texas at Austin Research Reactor
ML19312C004
Person / Time
Site: University of Texas at Austin
Issue date: 11/12/2019
From: Geoffrey Wertz
NRC/NRR/DANU/UNPL
To: Charlton W
University of Texas at Austin
Wertz G, NRR/UNPL, 415-0893
References
EPID L-2017-RNW-0032
Download: ML19312C004 (3)


Text

W. Charlton November 12, 2019 Dr. William Charlton, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin Pickle Research Campus, Building 159 10100 Burnet Road Austin, TX 78758

SUBJECT:

UNIVERSITY OF TEXAS AT AUSTIN - EXTENSION TO REVISED SCHEDULE FOR THE COMPLETION OF THE REACTOR ANALYSES RE: RENEWAL OF FACILITY OPERATING LICENSE NO. R-129 FOR THE UNIVERSITY OF TEXAS AT AUSTIN RESEARCH REACTOR (EPID NO. L-2017-RNW-0032)

Dear Dr. Charlton:

The U.S. Nuclear Regulatory Commission (NRC) staff is continuing its review of the University of Texas at Austin (UTA) application for renewal of Facility Operating License No. R-129, for the Nuclear Engineering Teaching Laboratory nuclear research reactor, dated December 12, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12156A097), as supplemented by letter dated February 21, 2012 (ADAMS Accession No. ML12061A009). The NRC staff requested a schedule for completion of the reactor analyses, by letter dated October 18, 2018 (ADAMS Accession No. ML18262A182).

By letter dated August 12, 2019 (ADAMS Accession No. ML19234A110), the UTA staff indicated that additional design information was needed from the reactor manufacturer, General Atomics, TRIGA International, and the completion of the reactor analysis would need to be extended until November 30, 2019. The NRC staff acknowledges that the UTA staff has made progress toward the completion of the reactor analyses with the support of the Department of Energy and the November 30, 2019, date is acceptable. If you have any questions, contact me at (301) 415-0893 or by electronic mail at Geoffrey.Wertz@nrc.gov.

Sincerely,

/RA Greg Casto Acting For/

Geoffrey A. Wertz, Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-602 License No. R-129 cc: See next page

University of Texas Docket No. 50-602 cc:

Bureau of Radiation Control Larry Hall, Reactor Supervisor State of Texas Nuclear Engineering Teaching Laboratory 1100 West 49th Street The University of Texas at Austin Austin, TX 78756 10100 Burnet Road, Building 159 Austin, TX 78758 Dr. Gregory L. Fenves The University of Texas at Austin Test, Research and Training Office of the President Reactor Newsletter 110 Inner Campus Drive, G3400 Attention: Amber Johnson Austin, TX 78712-3400 Dept of Materials Science and Engineering University of Maryland Maurie McInnis 4418 Stadium Drive Executive Vice President and Provost College Park, MD 20742-2115 The University of Texas at Austin 1 University Station, G1000 John G Ekerdt, PhD Austin, TX 78712 The University of Texas at Austin Chemical Engineering DeAnn Walker, Director 200 E. Dean Keeton St, Stop C0400 Office of the Governor Austin, TX 78712-1589 Office of Budget and Policy P.O. Box 12428 Dr. Richard Neptune, Dept. Chair Austin, TX 78711 Walker Department of Mechanical Engineering Paul Whaley, Associate Director 204 E. Dean Keeton St., ETC 5.200 Nuclear Engineering Teaching Laboratory (C2200)

The University of Texas at Austin Austin, TX 78712-1591 10100 Burnet Road, Building 159 Austin, TX 78758 Dean Sharon Wood The Cockrell School of Engineering 301 E. Dean Keeton St., ECJ 10th Floor (C2100)

Austin, TX 78712-2100

ML19312C004

  • concurrence via email NRR-106 OFFICE NRR/DANU/UNPL/PM* NRR/DANU/UNPL/LA* NRR/DANU/UNPL/BC NRR/DANU/UNPL/PM*

NAME GWertz NParker GCasto GWertz (GCasto for)

DATE 11/12/19 11/8/19 11/12/19 11/11/19