|
---|
Category:Inspection Report
MONTHYEARIR 05000602/20242012024-02-20020 February 2024 University of Texas at Austin - U.S. Nuclear Regulatory Commission Safety Inspection Report 05000602/2024201 IR 05000602/20232012023-07-31031 July 2023 University of Texas at Austin - NRC Safety Inspection Report No. 05000602/2023201 ML23193B0332023-07-31031 July 2023 University of Texas at Austin - NRC Security Inspection 2023202 IR 05000602/20222012023-01-25025 January 2023 University of Texas at Austin - U.S. Nuclear Regulatory Commission Special Inspection Report 05000602/2022201 IR 05000602/20212012022-01-26026 January 2022 University of Texas at Austin - Us Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000602/2021201 IR 05000602/20202012021-05-0707 May 2021 University of Texas at Austin - Nuclear Regulatory Commission Security Inspection Report No. 05000602/2020201 - Cover Letter Only (Public) IR 05000602/20202022021-01-0606 January 2021 University of Texas at Austin - Nuclear Regulatory Commission Routine Inspection Report 05000602/2020202 IR 05000602/20192012019-12-23023 December 2019 University of Texas - Austin U.S. Nuclear Regulatory Commission Routine Inspection Report NO.50-0602/2019-201 IR 05000602/20182012019-05-22022 May 2019 University of Texas at Austin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-602/2018-201 IR 05000602/20172012017-12-14014 December 2017 University of Texas at Austin - U.S. Regulatory Commission Security Related Inspection Report No. 50-602/2017-201 Cover Letter IR 05000602/20162012016-12-0505 December 2016 University of Texas at Austin - Nuclear Regulatory Commission Routine Inspection Report No. 50-602/2016-201 IR 05000602/20152012015-10-0202 October 2015 IR 05000602/2015201, on 08/31 - 09/03/2015, University of Texas at Austin, NRC Routine Inspection Report IR 05000602/20092012009-10-0101 October 2009 IR 05000602-09-201 on 09/14/09 - 09/17/09 for University of Texas at Austin IR 05000602/20072022007-11-16016 November 2007 IR 05000602-07-202, on 11/07/2007 - 11/08/2007, for Univ. of Texas at Austin Nuclear Engineering Teaching Laboratory IR 05000602/20072012007-11-16016 November 2007 NRC Inspection Report No. 50-602/2007-201 IR 05000602/20062012006-11-21021 November 2006 IR 05000602-06-201, University of Texas - Austin, Primary Focus of This Routine, Announced Insp Included Onsite Review of Selected Aspects of the Licensee'S Class II Research Reactor Safety Program.... IR 05000602/20052012005-12-22022 December 2005 NRC Inspection Report No. 05000602-05-201, Univ of Texas at Austin IR 05000602/19982011999-03-0202 March 1999 Insp Rept 50-602/98-201 on 981207-11.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee IR 05000302/19972011998-01-0909 January 1998 Insp Rept 50-302/97-201 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of CAs Previously Committed by Licensee & Related Discussion W/Personnel IR 05000602/19972011998-01-0909 January 1998 Forwards Insp Rept 50-602/97-201 on 970929-1003.No Violations Noted.Previous Level IV Violation Was Closed IR 05000192/19920021993-01-0505 January 1993 Insp Repts 50-192/92-02 & 50-602/92-02 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected: Organization & Staffing,Procedures,Operator Requalification Training,Health Physics Program & Physical Security IR 05000602/19910011991-07-23023 July 1991 University of Texas Construction Inspection Report 05000602/1991001 IR 05000602/19900041990-08-0202 August 1990 University of Texas Construction Inspection Report 05000602/1990004 IR 05000602/19900031990-07-27027 July 1990 University of Texas Construction Inspection Report 05000602/1990003 IR 05000602/19900021990-05-0909 May 1990 University of Texas Construction Lnspection Report 05000602/1990002 IR 05000602/19900011990-04-16016 April 1990 University of Texas Construction Lnspection Report 05000602/1990001 IR 05000602/19890071990-01-11011 January 1990 University of Texas Construction Inspection Report 05000602/1989007 IR 05000602/19890061989-11-29029 November 1989 University of Texas Construction Inspection Report 05000602/1989006 IR 05000192/19890021989-07-13013 July 1989 University of Texas Construction Inspection Reports 05000192/1989002 & 05000602/1989004 IR 05000192/19890031989-07-0606 July 1989 University of Texas Construction Inspection Reports 05000192/1989003 & 05000602/1989005 IR 05000602/19890031989-05-23023 May 1989 University of Texas Construction Inspection Report 05000602/1989003 IR 05000602/19890021989-04-27027 April 1989 University of Texas Construction Inspection Report 05000602/1989002 IR 05000192/19890011989-02-10010 February 1989 University of Texas Construction Inspection Reports 0500192/1989001 & 0500602/1989001 IR 05000602/19880051988-10-12012 October 1988 Insp Rept 50-602/88-05 on 880922-23.No Violations or Deviations Noted.Major Areas Inspected:Mechanical Equipment, Piping,Electrical Sys Installation,Const Progress & Schedule Status IR 05000192/19880021988-09-0202 September 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-02 & 50-602/88-02 IR 05000602/19880041988-08-0404 August 1988 University of Texas Construction Inspection Report 05000602/1988004 IR 05000602/19880031988-07-0505 July 1988 University of Texas Construction Inspection Report 05000602/1988003 IR 05000192/19880011988-06-0808 June 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-192/88-01 & 50-602/88-01.Based on Listed Understanding of Util Response, Per 880516 Telcon,Actions Responsive to NRC Concerns IR 05000602/19870011987-12-18018 December 1987 University of Texas Construction Lnspection Report 05000602/1987001 IR 05000192/19860011986-06-0404 June 1986 University of Texas Construction Inspection Reports 05000192/1986001 & 05000602/1986001 2024-02-20
[Table view] Category:Letter
MONTHYEARML24127A1212024-05-10010 May 2024 Uta Tribal Letter-Pierite, M-Tunica-Biloxi Tribe of Louisiana ML24127A1242024-05-10010 May 2024 Uta Tribal Letter-Yargee, W-Alabama-Quassarte Tribal Town ML24127A1222024-05-10010 May 2024 Uta Tribal Letter-SpottedBird, L.-Kiowa Indian Tribe ML24127A1152024-05-10010 May 2024 Uta Tribal Letter-Gonzalez, B-Caddo Nation ML24127A1162024-05-10010 May 2024 Uta Tribal Letter-Hoskin, C-Cherokee Nation ML24127A1192024-05-10010 May 2024 Uta Tribal Letter-Martinez, E-Mescalero Apache Tribe ML24127A1232024-05-10010 May 2024 Uta Tribal Letter-Yahola, S-Kialegee Tribal Town ML24127A1182024-05-10010 May 2024 Uta Tribal Letter-Kaskaske, D, Kickapoo Tribe of Oklahoma ML24127A1142024-05-10010 May 2024 Uta Tribal Letter-Garza, J-Kickapoo Traditional Tribe of Texas ML24127A1172024-05-10010 May 2024 Uta Tribal Letter-Johnson, L.J.-Seminole Nation of Oklahoma ML24127A1132024-05-10010 May 2024 Uta Tribal Letter-Bunch, J-United Keetoowah Band of Cherokee Indians ML24127A1202024-05-10010 May 2024 Uta Tribal Letter-Morrow, R.K.-Thlopthlocco Tribal Town ML24096A0422024-05-0101 May 2024 Letter to R. Nelson, Advisory Council Historic Preservation; Re., Uta Section 106 Consultation ML24096A0432024-05-0101 May 2024 Letter to C. Brashear, Texas Historical Commission; Re. Uta Section 106 Consultation ML24120A3602024-04-30030 April 2024 Letter to Ricky Sylestine, Chairperson, Alabama-Coushatta Tribe of Texas; Re., Uta Section 106 Consultation ML24120A3612024-04-30030 April 2024 Letter to Russell Martin, President, Tonkawa Tribe of Indians of Oklahoma; Re., Uta Section 106 Consultation ML24120A3572024-04-30030 April 2024 Letter to Deborah Dotson, President, Delaware Nation, Oklahoma; Re., Uta Section 106 Consultation ML24120A3582024-04-30030 April 2024 Letter to Durell Cooper, Chairman, Apache Tribe of Oklahoma; Re., Uta Section 106 Consultation ML24120A3592024-04-30030 April 2024 Letter to Mark Woommavovah, Chairman, Comanche Nation, Oklahoma; Re., Uta Section 106 Consultation ML24096A0792024-04-30030 April 2024 Letter to Jonathan Cernek, Chairman, Coushatta Tribe of Louisiana; Re., Uta Section 106 Consultation ML24120A3622024-04-30030 April 2024 Letter to Terri Parton, President, Wichita and Affiliated Tribes (Wichita, Keechi, Waco and Tawakonie), Oklahoma; Re., Uta Section 106 Consultation ML24058A1242024-03-20020 March 2024 University of Texas at Austin - Change of Facility Project Managers ML24059A1032024-02-28028 February 2024 2023 Annual Operating Report for the University of Texas Triga II Nuclear Research Reactor IR 05000602/20242012024-02-20020 February 2024 University of Texas at Austin - U.S. Nuclear Regulatory Commission Safety Inspection Report 05000602/2024201 ML23332A1052023-12-0707 December 2023 University of Texas at Austin - Regulatory Audit Re Renewal of Facility Operating License No. R-129 for Its Triga Mark II Nuclear Reactor ML23258A1622023-09-15015 September 2023 Submission of Environmental Report for the University of Texas at Austin Research Reactor in Support of License Renewal ML23216A2122023-08-0404 August 2023 Univ. of Texas - Austin, Submittal of Draft Safety Analysis Report for the Support of License Renewal IR 05000602/20232012023-07-31031 July 2023 University of Texas at Austin - NRC Safety Inspection Report No. 05000602/2023201 ML23193B0332023-07-31031 July 2023 University of Texas at Austin - NRC Security Inspection 2023202 ML23195A1802023-07-14014 July 2023 Submission of Revised Draft Safety Analysis Report (Chapters 4 and 13) Incorporating Neutronic and Thermal Hydraulic Analysis for the University of Texas at Austin Research Reactor ML23129A2432023-05-10010 May 2023 University of Texas at Austin – Notice of Violation ML23102A1422023-04-13013 April 2023 Examination Confirmation Letter No. 50-602/OL-23-02, University of Texas at Austin ML23065A3032023-04-11011 April 2023 University of Texas at Austin – Issuance of Amendment No. 8 to Facility Operating License R-129, for the University of Texas at Austin Triga (Training, Research, Isotopes, General Atomics) Nuclear Research Reactor to Change Paragraphs 2.B.( ML23074A2142023-03-16016 March 2023 Transmittal of 2022 Annual Report for the University of Texas Triga II Nuclear Research Reactor ML23067A1962023-03-0707 March 2023 Univ of Texas - Austin, Reply to a Notice of Violation ML23052A1712023-03-0707 March 2023 University of Texas at Austin - Report on the Regulatory Audit Renewal of Facility Operating License No. R-129; Docket No. 50-602 ML23067A2092023-02-25025 February 2023 University of Texas at Austin - Response to Apparent Violations in NRC Special Inspection Report 05000602/2022201; EA-22-134 ML23040A3032023-02-0909 February 2023 Univ of Texas - Austin, Submittal of Neutronics Report and Thermal Hydraulic Analysis of the Triga Reactor IR 05000602/20222012023-01-25025 January 2023 University of Texas at Austin - U.S. Nuclear Regulatory Commission Special Inspection Report 05000602/2022201 ML22333A6232022-11-16016 November 2022 University of Texas, Submittal of 14-Day Report for Event Number 56198 ML22322A1142022-11-16016 November 2022 The University of Texas Nuclear Research Reactor 14-Day Report ML22224A1432022-09-13013 September 2022 Examination Confirmation Letter No 50-602/OL-23-01, University of Texas at Austin ML22269A4792022-09-0909 September 2022 Request for Revision of Uranium and Plutonium Forms in License R-129 ML22224A1222022-08-22022 August 2022 University of Texas at Austin Change of Facility Backup Project Manager ML22164A0062022-06-13013 June 2022 Univ of Texas - Austin, Change in Level 1 Management ML22164A0092022-06-13013 June 2022 Annual Report for the University of Texas Triga II Nuclear Research Reactor ML22130A1752022-05-17017 May 2022 University of Texas at Austin Interim Status Report on the Regulatory Audit Re Renewal of Facility Operating License No R-129 IR 05000602/20212012022-01-26026 January 2022 University of Texas at Austin - Us Nuclear Regulatory Commission Routine Safety Inspection Report No. 05000602/2021201 ML21272A1662021-10-0404 October 2021 University of Texas at Austin Change of Facility Project Manager ML21266A4062021-09-0101 September 2021 Notification of a Change in Level 1 Management for the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL) 2024-05-10
[Table view] |
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
July 31, 2023
Dr. William Charlton, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin Pickle Research Campus, Building 159 10100 Burnet Road Austin, TX 78758
SUBJECT:
UNIVERSITY OF TEXAS AT AUSTIN - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT NO. 05000602/2023202
Dear Dr. Charlton:
From April 11-14, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a security inspection at the University of Texas at Austin, Nuclear Engineering Teaching Laboratory. The enclosed report presents the results of that inspection, which were discussed on April 14, 2023, with you and members of your staff.
The inspection examined activities conducted under your license as they relate to security, compliance with the Commission rules and regulations, and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed various activities, and interviewed personnel. Based on the results of this inspection, no significant security concerns or findings of non-compliance were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (Agencywide Documents Access and Management System (ADAMS)).
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of the enclosure will not be available for public inspection.
Document transmitted herewith contains sensitive unclassified information.
When separated from enclosure, this document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATIONIf you have any questions concerning this inspection, please contact Andrew Waugh at 301-415-0230, or by email at Andrew.Waugh@nrc.gov.
Sincerely, Travis L. Tate, Chief Non-Power Production and Utilization Facility Oversight Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-602 License No. R-129
Enclosure:
As stated cc w/o enclosure: GovDelivery Subscribers Signed by Tate, Travis on 07/31/23
ML23193B033 NRC-002 OFFICE NRR/DANU/UNPO/RI NRR/DANU/UNPO/RI NRR/DANU/UNPO/LA NRR/DANU/UNPO/BC NAME AWaugh JArellano NParker TTate DATE 7/17/2023 7/17/2023 7/19/2023 7/31/2023