ML20058K136

From kanterella
Revision as of 12:34, 3 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Lists Conclusions Reached at 890822 Meeting on Owners Group Improved Tech Specs,Including Surveillance Requirement 3.0.5 & pressure-temp Limits & Leakage Detection Sys
ML20058K136
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 08/29/1989
From: Cheng C
Office of Nuclear Reactor Regulation
To: Calvo J
Office of Nuclear Reactor Regulation
Shared Package
ML20058K090 List:
References
GL-88-01, GL-88-1, NUDOCS 9002020155
Download: ML20058K136 (2)


Text

. . . . - . - - - - - . - - - . - - . - - - - -

L g -

[j.  ;-

. Wesg .

a UNITsp sTATss Aj<

i o y[;$%f(f 5 %# NUCLE AR REGULATORY COMMIS$10N wasmwovow. o. c. conss *

% ..':. . / ne s o me NEMORANDUPl FOR:' Jose Calvo Chief Technical Specifications Branch Division of Operational Events Assessment, NRR .

L FROM: C. Y. Cheng Chief L Naterials an,d Chemical Engineering Branch L Division of Engineering and Systems Technology .l*

SUf, JECT:

REVIEW 0F 0WNERS GROUP IMPROVED TECHNICAL $PICIFICATIONS L

On August 22, 1969 R. Hermann, W. Koo, T. McLellan and J. Tsao of sv staff discussed with you, D. Fischer and N. Gilles of your staff on isres.in tM DSER

!: input that we sent to you. (

Reference:

Memo from J. Richardst :o C. F. Rossi,

  • BWR Owners Group improved Technical- Specifications: DSER inpn,' July 26,1989)

The fo11 ewing are conclusions that were reached on each of the issues at.the netting:

2. Surveillance Requirements (SR) 3.0.5 The paragraph that relates the inservice inspection program to Generic Letter 8E-01 requirer.ents will be added to $R 3.0.5 of the BWR Standard TechnicalSpecificaticns(STS). The-licensee's individual ISI and IST programs will describe how relief from the ASME Code will be obtained. The staff will review and approve the licensees' programs. $R 3.0.5 will be relocated to the Acministrative Controls section of the STS. '
2. Pressure-Temperature Limits EM:6 concluded that the pressure-temperature (PT) its;it curves may be re-locatec outside of the STS anc placed in a PT liniits report. However, arty _

change to the PT limits specifications should be submitted to the Cormissien for approval prior to implementation. This issue involves the Westinghouse.

-88W,1nd BWR Owr.ers groups. The CE Owners group has proposed to retain the existing PT limits in the Revised STS.

3. RCS - Structural Integrity The RCS'- Structural Integrity including the action statements in the current STS will=be relocated to the Administrative Control section of the 1 rpt oved STS. This issue involves all four Owners groups.

4 ' 3.3.4.1 Leakage Detection System I 1

~EMCB proposed to add the manual monitoring system using the sump pump in the ACTION section. TSB understood the intent but may change the language cf EMCB proposed ACTION statements and will discuss this issue with the BWR Owrmrs group. This issue involves only the BWR Owners group.

CONTACT:' John Tsao, EMCB/ DEST x20937 l

i 0 L 0l 5 (' f

= - .. .- -

t .

v .

408 # # gggg -

.2 -

c 5. 3.4.4 Operational Leakage '

TSE accepted the EMCB's proposal to change the time period for the 2 gpm leak rate increase in the RCS from 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This issue involves only the BWR Owners group.

1sB will present the above issues to the Owners groups for final resolution.

OriginalSigned by C.L Cheng  :

C. Y. Cheng, Chief Materials and Chemical Engineering Branch Division of Engineering and Systems Technology cc: J. Richarcson ,

W. Koo -

T. McLellan D. Fischer N. Gilles -

J. Schiffgens D_157RIBUT10N:

CLhin8L FILLS EHCB-RF

.)

j. 'i L

'See previous concurrences

' DEST:EMCC

  • DEST:ENCB D DESb JTsao:tys KWichmann .RHe nn 08/25/89 08/25/89 f/sg/89 C(YChpl;

/2)(/89 0FFICIAL RECORD COPY 5520 document name: TSAO-5 ll

- - - . .